First, the advantages and characteristics of hydropower slotting machine
1, exclusive patent of hydropower slotting machine: the first in China, with broad demand, filling the market gap and having unique absolute market advantages;
2. Hydroelectric slotting machine is widely used: it is suitable for walls with different materials, such as red brick, sand brick, aerated brick, hollow brick, cement cladding wall, wall column, etc.
3. Simple operation of the hydro-slotting machine: simple operation, easy operation by one person and easy movement; When resting in the middle, just turn off the power, and the machine can still be safely hung on the wall without falling off, which is more convenient and simple.
4. One-time molding: quickly and automatically slotting for one-time molding, without any auxiliary tools and secondary procedures, and the slotting depth can be controlled at will;
5. Free rotation: different angles can be adjusted, and the appearance is beautiful. With the needs of lines, it can rotate to the slot at 45 degrees, 180 degrees and 360 degrees, which is simple in application and good in effect.
6. High efficiency ratio: slotting is completed in one step. Compared with the traditional slotting method, the efficiency ratio is 50: reducing the labor cost.
7. Wear-resistant tools: high-strength alloy steel cutter head, which can be polished and used for more than 40 times. The cutting cost is only 1-3 cents/meter, and the disassembly is simple;
8. Health and environmental protection: the cutting dust is granular, and there is no dust at low speed. When cutting the groove, the dust is small, which greatly reduces the pollution, minimizes the harm of dust to the construction and installation personnel, and embodies the humanistic care;
9. Easy to use: the structure is simple and practical, and it can be disassembled, polished and maintained without professionals;
Second, what are the methods of water and electricity installation?
Waterway installation
Slotting of water pipes and pipelines Slotting of water pipes and pipelines: construction method, slotting after linear elastic. The pipe groove must be parallel and vertical as required. Pipes that must be laid in parallel are all controlled at 60-90cm (off the ground), and faucet pipes must be vertical. The control depth is 4 cm. After the operation, the person in charge of construction will record the size and location of the slotted pipeline. When installing sanitary ware, you can grasp the position of the pipeline.
Waterway water pipe installation: material requirements, PPR pipe, aluminum-plastic pipe. Three years ago, most users bought aluminum-plastic pipes. In the past two years, there are more PPR users. Pipes are divided into cold water pipes and hot water pipes. Galvanized iron pipes are not used for buried pipelines. First of all, through the installation drawings of hydropower, the construction personnel and the owner discuss the position and function of water. Arrange the main drainage of the hydropower station, and install the faucet and faucet. The construction drawing can be arranged according to the construction drawing. If the waterway function of the construction drawing is not long enough, it will communicate with the shipowner to increase the water use function.
Circuit installation
Slotting of wires and slotting lines: the building owner shall negotiate the power function and requirements of the owner, and assign an electrician to arrange parallel and vertical slots. Put the bottom frame of the switch socket. Slot the socket 40 cm away from the ground, slot the socket of on-hook air conditioner 2.2 meters away from the ground, and slot it from 1.2 to 1.4 meters away from the ground. A horizontal line should be drawn at the bottom of the switch socket. The kitchen and bathroom must be slotted through the designed function.
Wiring circuit wiring: material requirements, copper core 2.5 ~ 6 square meters, conduit 16mm or more. Wiring requirements: Most electricians do not consider the separate wiring of high current and weak current, switches, air conditioning sockets and power sockets when wiring circuits. So slotting also saves a lot of working procedures. The minimum wiring required for strong current and weak current is 30 cm, the wiring group of air conditioning socket is 6 square meters, the electrical socket is 4 square meters, and the switch is more than 2.5 square meters.
The advantages and characteristics of hydropower slotting machine are as above. As a common machine in the industry, hydropower slotting machine has certain social characteristics and distinctive features, and its operation should also pay attention to methods. What are the methods of water and electricity installation? Hydropower installation often needs professional knowledge to deal with, and it is difficult for ordinary people to deal with hydropower installation.