Engineering technology management consulting contract

Engineering Technology Management Consulting Contract 1

Client (full name):

Consultant (full name):

Reached consensus by both parties , sign this contract.

1. The client entrusts the consultant to provide construction project cost consulting services for the following projects:

2. The wording and terminology of this contract are the same as the conditions and relevant attachments of the construction project cost consulting contract. righteous.

3. The following documents are an integral part of this contract: Standard Conditions of Construction Project Cost Consulting Contract: Special Conditions of Construction Project Cost Consulting Contract: Supplements and Signatures of the Construction Project Cost Consulting Contract During the Execution of the Construction Project Cost Consulting Contract Correct the file.

IV. The consultant shall, in accordance with the provisions of this contract, undertake the construction project cost consulting business within a certain range of the special conditions of this contract.

5. The principal shall pay remuneration to the client in accordance with the time limit, method, currency and amount stipulated in this contract.

6. The construction project cost consulting business of this contract will be implemented from November 26, 20xx to December 15, 20xx.

7. This contract is made in four copies and has the same legal effect. Each party holds one copy.

Client: (seal) Consultant: (seal)

Legal representative: (signature) Legal representative: (signature)

_____ _Year______month______day______year______month______day Engineering technology management consulting contract 2

Construction unit (Party A): ____________________________

Address: ____________Postcode____________Phone____________

Legal representative: ____________Position____________

Consulting unit (Party B): ____________________________

Address : ____________Postcode____________Telephone____________

Legal representative: ____________Position____________

In order to make the conception of ____ building and installation projects scientific, design and construction economical , reasonable, fast construction speed, small error, after full negotiation between Party A and Party B, this contract is entered into.

Article 1 Party A shall submit the red line map of the Planning Bureau, the approval document from the superior department, the letter of authorization and the construction area, installation items, and Information such as fire protection methods and clear height of each floor of the warehouse shall be submitted to Party B.

Article 2 Party B shall, according to Party A’s requirements, conduct a feasibility study on the terrain, geological conditions, construction and installation concepts of the ________ construction and installation project, and finally prepare a design brief and calculation sheet, which will be completed on _ Delivery to Party A before ____month________year.

Article 3 Party A shall pay Party B’s consulting fee of RMB 10,000 in accordance with the engineering design fee standards stipulated by the national competent authorities. Within ____ days from the date of signing this contract, Party A will first pay Party B ____ yuan. Party B will then pay Party B ____ yuan within ____ days after Party B delivers the design task sheet and calculation sheet to Party A.

Article 4: Party A shall bear the travel expenses of personnel who need to conduct research and collect data in other places for this consulting project.

Article 5 Party A’s liability for breach of contract

1. If Party A fails to submit relevant documents, drawings and information to Party B within the time specified in this contract, Party B may The time for delivering the design brief and spreadsheet will be postponed.

2. If Party A fails to pay the consulting fee to Party B within the time specified in this contract and is delayed for one day, a fine of ____‰ will be imposed based on the amount of delayed payment.

3. If Party A interrupts the consultation request midway and Party B has completed half of the consulting work, Party B shall pay the full consulting fee; if Party B has not completed half of the consulting work, 50% of the total consulting fee will be charged.

Article 6 Party B’s Liability for Breach of Contract

1. If Party B fails to deliver the design assignment sheet and calculation sheet within the time specified in this contract, if it is delayed for one day, it will be fined according to the total consulting fee_ ___‰.

2. If Party B interrupts the consultation midway, it shall pay a fine to Party A based on the total consultation fee.

3. If the technical consulting services provided by Party B cause economic losses to Party A due to quality defects or errors, Party B shall be responsible for compensation. If a major accident is caused and serious consequences are caused, the principal responsible person should also be held accountable for administrative or criminal liability.

Article 7 Other Agreements_______________________________

From the date of signing of this contract, Party A and Party B shall not change it at will. If there are any outstanding issues, they must be resolved through negotiation between both parties.

This contract is made in two original copies, with Party A and Party B each holding one copy. There are one copy of the contract in ____, and one copy shall be submitted to the ________ construction engineering department, China Construction Bank ____ and other units.

Construction unit (Party A): ____________________________

Person in charge: ____________________________

____year____month____day

Consulting unit (Party B): ____________________________

Person in charge: ____________________________

____year____month____ Engineering Technology Management Consulting Contract 3

The entrusting party (Party A):

The entrusting party (Party B):

According to the provisions of the "People's Republic of China and the Civil Code", both parties to the contract shall provide technical consulting services. By consensus, this contract is signed.

1. Content, form and requirements of consultation:

1. Party A entrusts Party B to undertake the project proposal for the gap greening project of Gaoxin Second Road (Outer Ring Road Zheshuwan Road) Preparation work;

2. The main content of technical consultation: The contract project includes the preparation of project proposals. The main contents include the necessity of project construction, demand forecast, engineering plan, environmental protection, implementation progress, investment estimation, fund raising, economic evaluation and benefit analysis, necessary social benefit evaluation and research conclusions, etc.

3. The project proposal prepared by Party B must meet Party A’s approval requirements and pass the approval of government investment projects.

2. Method of performance

Party B accepts Party A’s entrustment and submits four technical consultation reports within 30 working days after collecting all the information required for technical consultation.

3. Cooperation matters of the client:

Within ____ days after the contract takes effect, the client shall provide the following information and working conditions to the consultant:

1. Detailed construction planning of the construction project;

2. 1:500 topographic map of the construction project area;

3. Demolition data of the construction project;

4. Other relevant information.

4. Confidentiality of technical information and data:

Party B shall keep all information on this project confidential. Without Party A’s permission, Party B shall not disclose it to any third party

Transfer, copy or provide in any other form all information on this project.

Party A shall keep the technical consultation results of this project confidential. Without Party B’s permission, Party A shall not transfer, copy or provide the technology of this project to any third party in any other form.

Consultation results.

5. Intellectual Property Rights

(1) Party B guarantees that the information used or provided to Party A during the consulting service process of this project includes but is not limited to processes, articles, inventions or intellectual property rights. Knowledge and technological achievements will not infringe any third-party rights; and the amount paid by Party B for using items, processes, and inventions with intellectual property rights shall be borne by Party B.

(2) When Party A uses the consulting results under this contract, it shall be exempted from any intellectual property rights such as patent rights, trademark rights, copyrights or industrial design rights arising from the provision of consulting services by Party B. Damages arising from infringement or compensation. If any dispute or dispute occurs due to the above reasons, Party B shall bear all the responsibility, and Party A shall not be responsible for it.

6. Remuneration and payment methods:

(1) Remuneration (consulting funds) for this project:

(2) This project is in accordance with the National Planning Commission's "About In the Notice of Issuing the Interim Provisions on Consultation Fees for Preliminary Engineering of Construction Projects (No. 201283), 60% of the step-by-step fee standard based on the estimated investment amount of the construction project, and the adjustment coefficient of the step-by-step fee for the estimated investment amount of the construction project is 0.7 for calculation of consultation. fee.

The total consulting fee is 33,000 yuan (in RMB: 33,000 yuan).

(3) Payment method

1. The technical consulting remuneration shall be paid by Party A to Party B in one lump sum.

2. Specific payment time: Payment will be made when a report that meets Party A’s requirements is submitted.

7. Dispute resolution:

Disputes arising from the performance of this contract between the parties shall be resolved through negotiation and mediation. If negotiation or mediation fails, it will be dealt with in the following method (1):

(1) Submit to Wuhan Arbitration Commission for arbitration;

(2) File a lawsuit with the People's Court in accordance with the law.

8. Other matters not covered

This contract is made in six copies, with Party A holding four copies and Party B holding two copies.

Party A (official seal): _________

Party B (official seal): _________

Legal representative (signature): _________

Legal Representative (Signature): _________

_________year____month____day

__________year____month____day Engineering Technology Management Consulting Contract 4 < /p>

Contract No.:_________________________

Entrusting unit (Party A): _________Undertaken unit (Party B):_________

Party A hereby entrusts Party B to handle the cost of the infrastructure project , consulting service business, after negotiation between both parties, it is agreed that *** will abide by the following terms.

1. Entrusted services, auditing and verification projects

1. Project name: _______________________;

2. Construction area: _________m2;

3. Project cost (tentative estimate): _________ yuan per square meter;

4. Project address: Wangdu Suncity Community, Helan County;

5. Project The start date of construction is _____________month_________year, and the completion date is _____________month_________day of _____________year. < /p>

2. Review project budget and final accounts;

3. Preparation of bill of quantities;

4. Cost control throughout the construction process;

5. Project completion settlement review;

6. Others: ____________________________;

7. Requirements: ____________________________.

3. Information that Party A should provide during the project implementation process (check the information required to be provided before the following items):

1. Construction contract, supplementary contract or construction Agreement.

2. Engineering construction drawings (full set: civil engineering, installation).

3. Drawing review documents, design changes, and visa forms.

4. Construction organization design, concealed project records, and hoisting project records.

5. Visa information of both parties during the construction process.

6. Project (budget) final account (stamped with submission for review, official seal of the preparation unit, and special seal of the budget clerk).

7. Engineering quantity calculation sheet and main material calculation sheet.

8. Calculation details of actual steel consumption.

9. According to the policy, it is necessary to find material price certification documents to make up for the price difference.

10. Detailed list of materials supplied by the construction unit.

11. Bidding documents and other relevant visa information that affect the project cost, construction period, etc.

12. Construction unit business license, qualification certificate, fee collection level certificate, and budget officer information certificate.

13. Detailed schedule of multi-year project construction progress.

4. The responsibilities and obligations of Party A in the entrusted project:

1. The calculation data provided must be true and complete.

2. Construction management personnel must cooperate closely.

3. Due to Party A providing false and incomplete information or relevant personnel not cooperating during the work operation, causing Party B to reach unrealistic conclusions or delaying the work progress, Party A shall bear the responsibility and compensate for the losses. (% of the total cost)

5. Responsibilities and obligations of Party B in undertaking the entrusted consulting business:

1. Prepare and review in accordance with the requirements of relevant national laws and regulations , issue a verification report to ensure the authenticity and legality of the verification report.

2. Complete the preparation, auditing, and accounting business according to the agreed time, and issue calculation, review, and accounting reports.

6. Charging standards:

1. According to the settlement amount as agreed upon by both parties

2. Charges negotiated by both parties at one time

7. Settlement method:

1. Upon mutual agreement and approval of the agreement, Party A will make an advance payment to Party B for the estimated total cost of the project.

2. When Party B provides a complete budget to Party A, Party A shall pay 30% of the total estimated project cost when signing the budget.

3. When entering into the final accounts of the project, Party A must pay the total cost.

4. The remaining balance will be paid in one lump sum when the final accounting items are signed.

5. Supplementary content: When Party A requires progress payment, the monthly payment to Party B shall be included in the total cost and will be deducted in advance during settlement.

8. Compensation:

If either party withdraws or fails to perform the agreement without reason, the party shall compensate the other party for economic losses (30% of the total cost of the audit project).

9. Legal provisions:

This agreement shall comply with the relevant provisions of the Economic Contract Law of the People's Republic of China and the State.

10. Other matters that should be explained:

________________________________________.

11. Supplementary Provisions:

This agreement is made in two copies, with Party A and Party B each holding one copy, and it shall be effective at the same time.

Entrusting unit (Party A): _________ Undertaken by (Party B): _________

Address: __________________

Telephone: __________________

Signature of the representative: _________

Address: __________________ Telephone: ____________

Signature of the representative: __________

Engineering Technology Management on _________year________month________day Consulting Contract 5

Name of the entrusting unit (Party A): _________

Name of the consulting unit (Party B): _________

Party A and Party B agree in accordance with the "People's *** In accordance with the principles stipulated in the National Economic Contract Law and the Regulations on Construction Contract Contracts, and based on the actual situation of the project, the following agreement has been reached.

1. Project location:

____________________.

2. Project name:

____________________.

3. Contracting content:

Cost of the project.

4. Contracting method:

____________________.

5. Check the completion date:

Complete the work as required by Party A.

6. Contracting price:

The total price of this project.

7. Payment method:

On the contract signing date, Party A will transfer the advance payment of RMB ________ to Party B's account. When Party B completes the project quantity, Party A will pay Party B 80% of the contract price. , and the remaining 20% ??will be paid after the documents are submitted to the relevant departments. (If Party A cannot pay on time, Party A will be solely responsible for the consequences).

8. Party A’s responsibilities:

1. Party A should provide drawings and technical information related to the project, and Party A should make every effort to coordinate matters that require Party A’s coordination and communication. To solve the problem through communication, Party A shall make a written reply within the agreed time on matters submitted in writing by Party B and requiring a reply. When Party B requires a third party to provide relevant information, Party A shall be responsible for conveying and transferring the information.

2. Party A shall pay the consulting fee on schedule. If Party A fails to pay the construction project cost consulting fee within the stipulated payment period, it shall compensate Party B for the fee and interest payable from the stipulated date of payment. The amount of interest is calculated based on the bank demand loan multiplied by the time in arrears on the last day of the specified payment period.

3. Any travel and accommodation expenses related to this project will be borne by Party A.

4. If the progress is postponed or delayed beyond the agreed date due to reasons other than Party B’s responsibility, both parties shall further agree to extend the validity period of the contract accordingly.

5. If Party B’s work is hindered or delayed due to Party A’s reasons, thus increasing the workload or duration, the consultant shall promptly notify Party A in writing of the situation and possible impact, thereby increasing the The amount of work is regarded as additional services, the time to complete the construction project cost consulting work should be extended accordingly, and additional remuneration will be received.

9. Party B’s responsibilities:

1. Party B is responsible for the project cost, and Party B has the right to provide reasonable suggestions to Party A.

2. Party B completes the task with quality and quantity according to the time required by Party A.

3. If the work is delayed due to Party B’s fault, Party B shall bear the corresponding responsibility.

10. Supplementary Provisions:

This agreement is made in two copies, with Party A and Party B each holding one copy. It has the same legal effect and will take effect from the date of signing. It will automatically expire after the contract payment is paid. Invalid.

11. Others:

Any matters not covered shall be resolved through negotiation between the two parties.

Party A (seal): ___________________ Party B: _________________________

Representative (signature): ______________ ID number: ____________________

_______year_ _______ month _______ day _______ year _______ month _______ day Engineering Technology Management Consulting Contract 6

Construction unit: _______________, hereinafter referred to as Party A;

Consulting Unit: ____________________, hereinafter referred to as Party B

In order to ensure that the conception of _________ construction and installation project is scientific, the design and construction are economical and reasonable, the construction speed is fast, and the error is small, this contract is entered into after full negotiation between Party A and Party B. , for both parties to comply with and implement.

1. Party A should submit the red line map of the Planning Bureau, the approval document from the superior department, the letter of authorization and the construction area and installation items of the construction and installation project before ____ month ____, 19 , fire protection methods, clear height of each floor of the warehouse and other information shall be submitted to Party B.

Second, Party B conducts a feasibility study on the terrain, geological conditions, construction and installation concepts, etc. of the __________ construction and installation project according to Party A’s requirements, and finally prepares a design brief and calculation sheet, which will be completed on the same day. Delivery to Party A before ____ month ____, 9____.

Third, Party A will pay Party B’s consulting fee of ____ yuan in accordance with the trial "Engineering Design Fee Standards" issued by the State Planning Commission. Within ____ days from the date of signing this contract, Party A will first pay Party B ____ yuan. Party B will then pay Party B ____ yuan within ____ days after Party B delivers the design task sheet and frame calculation sheet to Party A. .

Fourth, Party A will bear the travel expenses of personnel who need to conduct research and collect data in other places for this consulting project.

5. If Party A fails to submit relevant documents, drawings and information to Party B according to the time stipulated in this contract, Party B may postpone the delivery of the design brief and frame calculation sheet according to the delayed time; Party A If the consulting fee is not paid to Party B within the time stipulated in this contract, and there is a delay of one day, a fine of ____‰ will be imposed based on the amount of delayed payment. If Party A interrupts the consultation request midway and Party B has completed half of the consulting work, Party B shall pay the full consulting fee; if Party B has not completed half of the consulting work, 50% of the total consulting fee will be charged.

If Party B fails to deliver the design brief and frame calculation sheet within the time stipulated in this contract and is delayed for one day, a fine of ______‰ will be imposed based on the total consulting fee. If Party B stops consulting midway, it shall pay a fine to Party B based on the total consulting fee.

6. Others: ____________________________________________________________. This contract shall take effect from the date of signing, and Party A and Party B shall not change it at will. If there are any outstanding issues, they need to be resolved through negotiation between both parties.

This contract is made in two original copies, with Party A and Party B each holding one copy. A copy of the contract shall be made in ______, and one copy shall be submitted to the ______ construction engineering department, the Construction Committee, China Construction Bank ____ and other units.

Construction unit (Party A): _________Consulting unit (Party B):_______________

Address: __________ Address:______________

Person in charge: __________ Responsible Person: _______________

Telephone: __________ Telephone: ______________

Contact person: __________ Contact person: _______________

Bank account: __________Bank account: _______________ < /p>

Order on ______year____month____day