Introduction to the qualifications of mining engineering construction general contracting companies?

What are the qualifications of general contracting enterprises for mining engineering construction? The general contracting qualifications for mining engineering construction are divided into special grade, first grade, second grade and third grade.

1. Special qualification standards for mining engineering construction general contracting enterprises:

Credit ability of construction enterprises

1. The registered capital of the enterprise is more than 300 million yuan.

2. The company’s net assets are more than 360 million yuan.

3. The construction industry business tax paid by enterprises in the past three years has been more than 50 million yuan.

4. The credit lines of corporate banks have been above 500 million yuan in the past three years.

Requirements for main managers and professional technicians of construction enterprises

1. The enterprise manager has more than 10 years of experience in project management.

2. The technical person in charge has more than 15 years of experience in engineering technology management, and has a senior professional title in engineering and a first-class registered construction engineer or registered engineer qualification; he has presided over the completion of two or more construction projects Contracting technical work of representative projects required by Class A qualifications or representative projects required by Class A design qualifications or general contracting projects with a contract value of more than 200 million yuan.

3. The financial person in charge has the title of senior accountant and the qualification of certified public accountant.

4. The company has more than 50 registered first-level construction engineers (first-level project managers).

5. The enterprise has professional and technical personnel required by the industry engineering design Class A qualification standards related to this category.

Level of scientific and technological progress

1. The enterprise has an enterprise technology center at the provincial and ministerial level (or equivalent to the provincial and ministerial level) and above.

2. The average expenditure on scientific and technological activities of enterprises in the past three years has reached more than 0.5% of turnover.

3. The enterprise has more than 3 national-level construction methods; in the past five years, it has more than 3 patents related to engineering construction that can promote the technological progress of the enterprise, and a total of more than 8 valid patents, at least one of which Invention patent.

4. The company has won national scientific and technological progress awards or edited national or industry standards for engineering construction in the past ten years.

5. The enterprise has established an internal LAN or management information platform to realize the networking of internal offices, information release, and data exchange; it has established and opened an external enterprise website; it has used a comprehensive project management information system and Personnel management system and engineering design related software realize file management and design document management.

Representative construction project performance

In the past 10 years, it has undertaken general contracting of more than 3 of the following 7 projects or more than three times the scale of any of the 1-5 projects. , general construction contracting or main project contracting, and the project quality is qualified.

1. Iron ore mining and dressing projects with a capacity of more than 1 million tons/year;

2. Non-ferrous placers with a capacity of more than 1 million tons/year or non-ferrous vein mines with a capacity of more than 600,000 tons/year Mining and dressing projects;

3. Coal mines with a capacity of more than 1.2 million tons/year or coal washing projects with a capacity of more than 3 million tons/year;

4. Phosphate rock and sulfur mines with a capacity of more than 600,000 tons/year Iron ore or uranium mine projects exceeding 300,000 tons/year;

5. Building materials mining projects such as gypsum ore, quartz mines or more than 200,000 tons/year, or limestone mines exceeding 700,000 tons/year;

>

6. Roadway projects of more than 10,000 meters and tailings pond projects of more than 1 million tons;

7. Main mine projects with a single contract value of more than 30 million yuan.

For more information about bidding document writing and production and improving the bid winning rate, click on the bottom of the customer service for free consultation.