Pilot production line refers to the medium-scale production line before formal mass production, which has the experimental function of improving observation. Production line is the route taken in the production process of products, that is, the route formed by a series of production line activities, such as processing, transportation, assembly and inspection, from the beginning of raw materials entering the production site. The production line organizes products according to the object principle. ...
What's the difference between a pilot line and a production line?
Production line for intermediate production test before formal production.
What do you mean by the demonstration base, pilot line, output and scale formed during the project implementation? What are the differences?
Demonstration base has a certain range of users.
The pilot production line is a medium-sized production line.
Output and scale, the production scale is mainly mass production, and the output is increasing every year.
How to write feasibility
You can refer to the following outline:
Compilation outline of feasibility study report
I. Overview of the application project
General description of the project, including economic indicators of the project, key technologies adopted, technological innovation, intellectual property rights of the project (patents, trademarks, copyrights and related rights, layout design of integrated circuits, geographical indications, trade secrets, traditional knowledge), technical appraisal by authoritative departments, environmental protection evaluation, etc. The outline is limited to 500 words.
Second, the existing work foundation and advantages
1. Research and development status and analysis of related technologies at home and abroad, including the status of existing technologies, intellectual property rights and technical standards.
2. Present situation and future scale of project applicants.
(1) Main economic indicators (total income, taxes, etc. ) and the economic indicators that can be achieved during the project implementation period; (Demand reflects the high growth of enterprises)
(2) Development capability, including R&D team, capital investment and research and development achievements in recent years.
(3) Production and marketing capabilities, including the production conditions, business model, market planning capabilities and sales channels of the enterprise.
(4) For this project, explain the innovation of the project, the technical level in the industry and its position in the market, as well as the existing industrialization basic conditions of the reporting unit.
(5) Other special abilities, including quality certification, high-tech enterprise certification and other special qualifications or certificates.
Three. Project technical scheme
General technical overview of 1. project
(1) Overall technical scheme, including: technical principles on which the project is based, main technical performance indicators, quality standard types and standard names realized by the project, relevant qualification certificates newly obtained by the project implementation enterprise, etc.
(2) The innovative content of the project should be described in technical language. As far as possible, experimental data should be used to describe technological innovations, such as material innovation, structural innovation and process innovation. The old and new technologies, structures or processes should be compared, and the old and new structure diagrams and process flow charts should be drawn. The technical advancement (content) of the project should be analyzed and compared with data.
(3) Description of the technical route of the project, including process flow chart, product structure diagram, frame diagram, etc.
2, the project product production mode and conditions
Mode of production (self-processing/commissioned processing); Necessary production conditions for processing: necessary production conditions in the production process (except software); The existing processing conditions of tripod production in the project; The industrialization of the project also needs complete sets of equipment and instruments.
3 demonstration bases, pilot lines, production lines and their scales that may be formed during the implementation of the project.
Four. Market and competition of engineering products
1, industry and market overview
This paper briefly introduces the industry situation and market capacity at home and abroad, analyzes the growth trend of this product in the market, and compares it with data analysis.
2. Target market of the project products.
Combined with the advantages of products and enterprises, determine the market segment positioning of this product.
3. Competition analysis of the products of this project.
This paper analyzes the competitive advantages of similar products in the market from the aspects of technical advantages, marketing advantages, industry cognition and enterprise management advantages.
Verb (abbreviation of verb) project financial budget
1, project investment and financing
(1) Investment amount recently completed by the project.
(2) New investment budget.
2. Economic benefit analysis of the project
(1) Production scale and sales volume of the project products
Clearly state the year when it started production and the year when it reached production, and predict the production scale and sales volume for five consecutive years after production, and make relevant analysis.
(2) The production cost of the project products
The main components of the production cost of the project products are analyzed, and the unit cost of the products is predicted.
(3) Project product pricing
Analyze and explain the price and pricing strategy of the project products.
Implementation plan of intransitive verb project
1. Project progress and stage objectives: the specific objectives to be achieved in each stage during the project implementation, including progress indicators, technology development indicators, securing funds, production and construction, realizing sales revenue, etc. The goal of each stage should be a detailed qualitative and quantitative description that can be evaluated. The project implementation period should be divided into at least four stages, each stage is divided into half a year, which is convenient for supervision for half a year and the whole year.
2. Project evaluation indicators: they must be consistent with the technical, quality and economic indicators in the feasibility study report.
(1) Main technical indicators: When the project is completed, it should be able to provide supporting materials, including quantitative data such as measurable performance parameters, and the number, indicators and level of newly formed patents, new technologies, new products, new devices and monographs.
(2) Main quality indicators: the quality standards implemented, the relevant national industry license certification passed and the quality system certification passed by the enterprise; The number of new employees due to the implementation of the project; Project implementation forms a demonstration base ... >>
High marks for scientific research projects! !
OA office system has been tried by schools, enterprises and institutions ~
What does the pilot production line mean?
The new technology is not necessarily suitable for production. Add a pilot production line from the laboratory to the factory, which is between the laboratory equipment and the chemical plant equipment. Your name is Tangshan Institute. I wonder if I'm playing games in class.
The format and requirements of writing the project declaration, such as font, font size, typesetting, etc.
Acceptance number:
Classification: □ public □ secret □ secret □ top secret.
Feasibility study report of major national science and technology projects (projects)
(statement)
Special name:
Name of project (subject):
Project (subject) responsible unit:
Project (project) leader:
Project (project) life: 20 to 20 years.
Date of Completion: 20/12/2008
Made by the Ministry of Science and Technology of the People's Republic of China
The month of 2000
Fill in and explain
In order to establish a unified and standardized major special information management system and strengthen the management of major special information, we have studied and designed the format and reporting requirements of the feasibility study report (declaration) of major national science and technology projects.
1. Please fill in all items in strict accordance with the requirements in the table.
Two, the project (project) feasibility study report can only be put forward by a legal person, can be organized by a unit, can also be jointly organized by multiple units. Each project (project) can only have one responsible unit and one team leader. The person in charge of the project (project) shall be designated by the responsible unit of the project (project).
Three, the feasibility study report of the project (project) is compiled by the responsible unit of the project (project) and reported to the special implementation management office for summary;
Four, the project (project) feasibility study report for the first time in foreign terms, to write clearly the full name and abbreviation, the same word can use abbreviation.
5. The organization code refers to the identification code on the organization code certificate of the project responsible unit, which is the only legal person identification code given by the National Organization Code Management Center.
Six, the writer should objectively and truthfully fill in the report materials, respect the intellectual property rights of others, and abide by the laws and regulations of the state on intellectual property rights. When quoting other people's research results in the feasibility study report of a project (subject), the source must be indicated by footnotes or other means. The purpose of citation should be to introduce and comment on the achievements related to one's own research or to explain the technical problems related to one's own research. Once verified, scientific misconduct such as forging or tampering with scientific data, plagiarizing other people's works and papers or plagiarizing other people's scientific research achievements will be recorded in the credit record.
This form can be downloaded from the website of the Ministry of Science and Technology.
Eight, this table is the basic information of the feasibility study report of major projects (topics), and the implementation management office of major projects can appropriately increase the corresponding content according to its own characteristics.
First, the basic situation of the project (subject)
Project Name (Subject)
Estimated completion time of project (subject) classification
Project (Project) Activity Type Expected Result Type
project
(theme)
responsible
unit
Information unit name unit property
Postal code of mailing address
The competent department of the local unit
Contact phone organization code
Fax number unit setup time
electronic mailbox/ email box/ email mailbox
project
(theme)
Group leader
Information, name and gender
Date of birth title
The highest degree is junior college.
Fixed telephone mobile phone
Fax number e-mail address
Certificate Type Certificate Number
unite
unit
Information unit name unit nature organization code
project
(theme)
fund
source
Total funds (ten thousand yuan)
Apply for special funds
Funding from other countries (including departmental support)
Local * * * match
bank loan
Funds in the hands of local governments
Other funds
Remarks on the fund
Brief introduction of the project (subject) (briefly explain the necessity, objectives, technical scheme, financing scheme, organization mode and related basic information of the project (subject))
Second, the necessity analysis of the project (subject)
2. The relevance of1project) to special projects, project objectives and tasks (explain the role of project (project) tasks in completing special projects, project objectives and tasks)
2.2 projects (topics) and demonstration projects, with ... > >
How to write the project proposal, how to recommend the project to shareholders, what format, or what to pay attention to.
Compilation outline of comprehensive demonstration course
I. Project objectives and tasks
1. Analysis of project objectives and task requirements
2. Main technical difficulties and key points of the project
Second, the existing work foundation and advantages
1. Present situation and expected analysis of existing technologies, intellectual property rights and technical standards at home and abroad.
2. The research foundation of the project applicant and the main participating units (existing R&D experience, scientific and technological achievements, scientific research conditions and the status quo of R&D teams, etc.). )
Third, research content and assessment indicators
1. Research content, technical route and innovation.
2 main technical indicators (such as the quantity, indicators and level of intellectual property rights, technical standards, new technologies, new products, new devices, monographs, etc.). Competition analysis with similar technologies or products at home and abroad, meeting the needs of major engineering construction or major equipment development on which the project depends, etc. )
3. Expected economic, social and environmental benefits (such as the industrialization prospect of technology and product application, the market scale and benefits that can be formed during the project implementation period, and the role in safeguarding national security, promoting social sustainable development and enhancing the competitiveness of related industries in our city, etc.). )
4 demonstration bases, pilot lines, production lines and their scales that may be formed in the implementation of the project.
5. Talent team building
6. Other evaluation indicators
Four. budget
Total investment budget and financing plan of the project.
Verb (abbreviation of verb) implementation mechanism
1. Organizational management measures
2. Industry-University-Research combination mode
3. Intellectual property rights and results management and rights distribution
Risk analysis and countermeasures of intransitive verbs
Seven. Related accessories
Other supporting materials or documents related to the project.
Eight. Related statement