What are the basic requirements for well control on duty when drilling oil and gas reservoirs? What are the contents of the logging team on duty?

rw=rh—

pa—pd/0.0098 1hw

Radiation weapon (abbreviation for radiation weapon)

—— Overflow fluid density,

Kg/m3

right hand

—— Pressure gradient of liquid column in drilling tool, kg/m3.

dad

-shut-in casing pressure, mpa

pitch diameter of thread

—— Vertical shut-in pressure, mpa

Hotwater (hot water)

—— Bottom hole overflow height, m (m)

Wherein the shut-in casing pressure pa and the vertical pressure pd are 6.9mpa, that is,

Pa-PD equals zero,

pa—pd/0.0098 1hw

The whole score is meaningless.

So, are the data of shut-in casing pressure pa and vertical pressure pd wrong?