Administrative level of Guang 'an Power Plant

Honey, I'm glad to answer your question. The answer is as follows: the post level of power plant is supervisor → senior supervisor → chief engineer → assistant director → director → deputy chief engineer → chief engineer → vice president of production → general manager and secretary of the Party committee. The middle level is divided into departments and fields, and the general enterprises in the departments include financial center, discipline inspection commission, human resources and personnel organization.

The field categories mainly include security department, production technology department, equipment support department (maintenance personnel or inspection team who provide good maintenance centered on normal operation of equipment), material supply department and power generation department, among which the power generation department is relatively independent because it manages the whole power generation process of the power plant, involving all aspects of operation, including running steam turbines, electricity, boilers, chemistry, ash removal, fuel transportation and desulfurization.

Mainly centralized control operation, and then other peripheral operation posts, including chemistry, coal conveying, ash removal and desulfurization. The better treatment is centralized control operation, because all the main equipment is under its jurisdiction, and centralized control has three majors: electricity, boiler and turbine. During the operation, each major is managed by the shift supervisor as a whole, and then the monitor (supervisor) of each major manages his own professionals. The staffing of an operation class is roughly as follows: the value length is 1.

Centralized control: each unit has one main value (team leader), two sub-values, two thermal engine patrol inspections and one electrical patrol inspection (in some plants, two engines and one electrical patrol inspection).

Chemistry: one section chief (monitor), one deputy section chief and two inspectors.

Ash removal and desulfurization: one person in charge (monitor), two deputies and two inspectors.

Coal conveying: one chief shift supervisor, one dumper, one warehouse keeper and one transfer station. There are more coal conveying configurations.

Consultation record answered on May 29th, 2022.

Power plant post grade list

Honey, I'm glad to answer your question. The answer is as follows: the post level of power plant is supervisor → senior supervisor → chief engineer → assistant director → director → deputy chief engineer → chief engineer → vice president of production → general manager and secretary of the Party committee. The middle level is divided into departments and fields, and the general enterprises in the departments include financial center, discipline inspection commission, human resources and personnel organization. The field categories mainly include security department, production technology department, equipment support department (maintenance personnel or inspection team who provide good maintenance centered on normal operation of equipment), material supply department and power generation department, among which the power generation department is relatively independent because it manages the whole power generation process of the power plant, involving all aspects of operation, including running steam turbines, electricity, boilers, chemistry, ash removal, fuel transportation and desulfurization. Mainly centralized control operation, and then other peripheral operation posts, including chemistry, coal conveying, ash removal and desulfurization. The better treatment is centralized control operation, because all the main equipment is under its jurisdiction, and centralized control has three majors: electricity, boiler and turbine. During the operation, each major is managed by the shift supervisor as a whole, and then the monitor (supervisor) of each major manages his own professionals. The staffing of an operation class is roughly as follows: the value length is 1. Centralized control: each unit has one main value (team leader), two sub-values, two thermal engine patrol inspections and one electrical patrol inspection (in some plants, two engines and one electrical patrol inspection). Chemistry: one section chief (monitor), one deputy section chief and two inspectors. Ash removal and desulfurization: one person in charge (monitor), two deputies and two inspectors. Coal conveying: one chief shift supervisor, one dumper, one warehouse keeper and one transfer station. There are more coal conveying configurations.