How to install graphite pad of heat transfer oil circulating pump

Heat transfer oil circulating pump

about

Graphite washer

The installation steps of are as follows:

adopt

flanged connection

Structure or

threaded connection

Structure,

gasket

After inspection, there is no doubt that other valve parts

Excellent and non-destructive

In the case of ...

1. Before installing gasket and sealing, apply a layer on the rotating parts of gasket, thread and bolt.

graphite powder

Or the oozing lubricant mixed with graphite powder and engine oil (or water), and the gasket and graphite shall be kept clean.

2. The gasket shall be installed on the sealing surface straight and correctly, and shall not deviate, extend into the valve cavity or rest on the shoulder.

3. Only one gasket is allowed to be installed, and two or more gaskets are not allowed to be installed between sealing surfaces to eliminate the gap between sealing surfaces.

4.

Oval washer

Sealing should make the inner and outer rings of the gasket contact, and both ends of the gasket should not contact the bottom of the tank.

5. When installing the O-ring, besides the ring and groove, the compression should be appropriate. On the premise of ensuring sealing,

compression deformation

Speed crossing

a 29-days month of the lunar calendar

Ok, it can prolong the life of O-ring.

6. Before covering the gasket, the valve should be in the open position, so as not to affect the installation and damage the valve parts. Align the position when covering, and don't push the contact gasket to avoid displacement and wear of the gasket.

7.

Bolted or threaded gaskets shall be installed in a horizontal position (threaded gasket covers shall not be used with wrench positions.

monkey wrench

)。

8. Before the gasket is compressed,

Coping with stress

, temperature, the nature of the medium, gasket material characteristics are clearly connected and determined.

pretightening force

, the pre-tightening force should be guaranteed in

pressure test

In the case of no leakage, minimize it.

9. Washer

quickly

After the connection, there should be a pre-tightening gap. In case the gasket leaks, there is still room for pre-tightening.

10. When working at high temperature, bolts will be produced.

High temperature creep

, produce

stress relaxation

, the deformation increases, resulting in leakage at the gasket, which requires thermal fastening; On the contrary, under the condition of low temperature, the bolt will shrink, which requires

Leng Song

1 1. The sealing surface is liquid.

Gasket seal

, sealing surface should be cleaned or surface treated. The plane sealing surface should be polished and matched, and the adhesive should be evenly applied to eliminate air as much as possible. The adhesive layer is generally 0. 1-0.2 mm.

12.

For threaded seals, use

Teflon film

Blank zone

, you should start with the film and paste it in.

Threaded cotton

And then the starting point.

Residual point

Remove the adhesive tape to make the film stick to the thread wedge.