In recent years, the water and electricity contracting industry has increased year by year. What is a water and electricity contract contract? What should we generally pay attention to? In daily life, people often encounter situations like contracting out projects. The following This is a sample water and electricity contract contract that I compiled for everyone. Welcome to read it.
↓↓↓Click to get more "Water and Electricity Contracting Contract" ↓↓↓
★ Civil Engineering and Water and Electricity Contracting Contract★
★ Engineering Water and Electricity Installation Contract★
★ Hydropower Station Contracting Contract Sample★
★ Plumbing and Electrical Labor Service Contract★
Hydropower Contracting Contract Sample 1
Contractor: Telephone: (hereinafter referred to as Party A) ID number:
Contractor: Telephone: (hereinafter referred to as Party B) ID number:
Party B to Party A Contracted the water, electricity and heating installation and construction of the "Jiahuailin Community and Louli Community in Xingyang City". Because there was no objection between the two parties during the construction. In accordance with the "Construction Project Contract Regulations" and other relevant regulations. Follow the principles of equality, voluntariness, fairness and integrity. The rights, obligations and economic responsibilities of both parties during the construction process are clarified. Both parties have reached consensus on the relevant matters of this project and have specifically established the following contract regulations in order to ensure mutual compliance and performance.
1. Project overview:
①Project name: Louli Community
②Project location: Jiahuailin Community, Xingyang City, Louli Community
⑧Structure quality: brick-concrete or semi-frame structure
2. Contracting method: water, electricity and heating "Contracting work and materials"
Party A will _1#_2#_3 Building #_4#_, the water, electricity, and heating installation projects are contracted to Party B for installation and construction in the form of labor and material contracting.
3. Contracting Content and Scope
①Contracting Scope:
_1#_2#_3#_4#_ Building shall comply with all requirements of the design drawings and bid list Supporting facilities for hydropower projects. ②Contracting content: The items required by the design drawings and modified documents and bid list shall be Party B’s contracting content.
4. Project quality requirements:
①Construction shall be carried out in accordance with the construction acceptance specifications and operating standards of water and electricity installation projects. Upon Party A's supervision and acceptance, it meets the qualified standards.
② Party B must strictly follow the requirements of the construction design drawings and modification documents for construction. If the construction is not carried out according to the requirements of the design drawings and the various materials, models and specifications specified in Party A’s bid, resulting in rework and redoing, it will cause The loss of labor and material costs shall be borne by Party B. And the materials used must have qualified product certificates and inspection reports.
③ Party B must clear the completion site before and after construction, and cooperate with Party A in time for pre-embedded installation. After Party A performs construction, the cost of work and materials for repairs caused by Party B's sending people to dig and repair shall be borne by Party B, and Party A has the right to deduct it from Party B's contract payment for work and materials. Party B will repair and clean the public area free of charge.
5. Construction period:
The total construction period of this project is ____ calendar days. Party B must complete the civil work within 20 days in advance according to the requirements of Party A’s construction schedule.
p>
6. Contract price: " " square meters
Based on the water, electricity, heating, installation design and construction drawings provided by Party A, refer to the change document requirements and the bidding bill of quantities as the standard .
7. Payment method:
This project will be paid according to progress: payment will be made for every two floors. Party B will send the completed amount of work to the construction engineer for review 1 day later, and after confirmation by Party A, it will be paid within 3 days Pay 80% of the progress payment within the day. After the project is completed and accepted, Party A will pay 95% of the total price within 5 days after handing over the acceptance procedures to Party A. The remaining 5% will be paid in one lump sum after the water and electricity warranty period expires.
8. Safety responsibility: Party B must strictly carry out construction in accordance with water and electricity installation construction specifications and safety operating procedures. Comply with all safety rules and regulations. The cost of safe operation is included in the unit contract price of this project. Party B shall bear the responsibility for unsafe accidents and economic losses caused by Party B's workers during construction. Party B also bears liability for unsafe accidents and any economic losses caused to others during construction due to other reasons.
9. Responsibilities of both parties:
Party A:
① Provide project construction drawings, design change documents, bill of quantities and other relevant documents:
② Provide on-site construction technical management and guidance.
Party B:
① Party B is responsible for the workers’ food and accommodation.
② Responsible for all construction equipment and equipment.
③Bring your own safety protective equipment.
④ Any expenses for overtime work at night due to the construction period.
⑤ Responsible for handling the completion acceptance procedures of water and electricity installation projects, and Party B shall bear the costs. The procedures should be delivered to Party A 10 days in advance for completion acceptance.
⑥ If the project cannot be completed on time, in addition to fines, Party A has the right to send other people to construct part of the project, and the cost of construction materials will be borne by Party B.
10. Liability for breach of contract:
① When Party B’s construction quality fails to meet the requirements, it shall unconditionally rework it until it reaches the standard, and the resulting cost of work and materials shall be borne by Party B.
② If Party B has insufficient construction personnel, causing delays in the construction period, a daily fine of ____ RMB will be imposed. Party A has the right to terminate the contract if necessary, and Party B will be responsible for any losses caused.
③ If Party A pays from time to time, Party B will not be responsible for project delays.
11. Matters not covered in this contract shall be resolved through negotiation between Party A and Party B.
12. This contract is made in triplicate, with Party A and Party B each holding one copy. It will take effect after both parties sign. It will automatically expire after the payment is settled.
13. Signing place:
Party A (official seal): _____________ Party B (official seal): _________
Legal representative (signature): _____________ Legal representative Person (Signature): _________
_________year____month____day_________year____month____day
Water and electricity contract template 2 < /p>
Party A:
Party B:
According to the "Economic Law", "Construction Law", "Contract Law", "Construction Law" of the People's Republic of China "Project Safety Management Regulations" and other relevant laws and administrative regulations, combined with the actual situation of this project, Party A and Party B have signed the following agreement through friendly negotiation based on the principles of equality, voluntariness, honesty and trustworthiness, and mutual benefit. We hope that both parties will agree. obey.
1. Name of the project: Lixin Tianyue Winery Project
2. Project location: The intersection of Wenzhou Road and Zhonghong Silk Road in Lixin Industrial Park
3. Contracting method: Contracting work and materials, including quality, progress and use of tools.
4. Contract scope:
(1) Water and electricity installation and specification requirements in the existing design construction drawings and construction drawings changed before construction, and lightning protection welding.
(2) Includes on-site temporary electricity and construction electricity.
(3) Ensure that the quality of each sub-project meets the requirements and national standards
(4) Ensure that the site is cleaned after the water and electricity installation is completed.
5. Settlement method and payment method:
(1) Project quantity calculation method: Calculated based on the project completion audit result minus 30%. (This settlement method includes pension insurance, unemployment insurance, labor insurance, personnel safety, etc.) Party A will withhold 3.5% business tax and 1.5% income tax on Party B's income after the completion of the audit.
(2) Payment method: According to the settlement method signed between the construction unit and Party A (China Urban Construction Sixth Bureau Group First Engineering Co., Ltd.), the payment will be settled in the same proportion and method.
6. Handling of unforeseen events:
If this project encounters an irresistible natural disaster or other unforeseen reasons that cause the work to be suspended, Party A will not make any compensation, but it has been completed The qualified project quantity shall be settled to Party B according to the contract unit price.
7. Party A’s responsibilities:
1. Party A is responsible for providing technical requirements, construction sites, construction drawings and instructions and relevant technical information.
2. Timely review the project progress reported by Party B.
3. Party A provides guidance on project progress and quality progress supervision, quality acceptance of processes during the project, inspection and acceptance of hidden projects, handling intermediate handover, project acceptance and visa procedures, and solving problems that should be solved by Party A.
4. Party A is responsible for providing workers’ dormitories, water, electricity and lighting.
8. Party B’s responsibilities:
1. Party B ensures that construction is carried out in accordance with the design drawings and relevant change information, ensuring quality and construction safety, and strictly implementing technical and operational specifications during the construction process, such as Party B will be responsible for any non-compliance with quality specifications.
2. All staff must strictly abide by the company's management systems and relevant regulations on civility, quality, safety, progress, etc. Violators will be fined.
3. Staff entering the site must hold ID cards and register at the construction site office for management purposes. Party B will be responsible for any fines imposed by relevant departments due to incomplete procedures and relevant documents.
4. Fighting, gambling, theft, etc. are strictly prohibited on the construction site. Violators will be fined 500 yuan, and serious cases will be sent to the public security department.
5. Party B must equip sufficient construction machinery and personnel according to Party A’s requirements and project progress. If it cannot complete the tasks assigned by Party A on time and with quality, Party A has the right to terminate the agreement and the completed The qualified project quantity will be settled at 60%, and the remaining 40% will be used as Party A’s reorganization personnel costs, and Party B will clear the site unconditionally.
6. Party B shall not hire minors under the age of 18 to enter the construction site.
7. Party B must clean up the site before each completion of work or after each process is completed. Otherwise, Party A has the right to arrange for personnel to clean up, and Party B will be responsible for the resulting expenses.
8. Before work, the squad leader should educate the workers on safe operating regulations. If work in violation of the regulations results in work-related injuries, the team will be responsible.
9. When all materials enter the site, Party B must submit them for inspection in strict accordance with the inspection application system. With the consent of Party A and the supervisor, they can enter the site for use only after passing the retest. All retest and engineering inspection fees will be charged. Party B is responsible.
10. You must wear a safety helmet when entering the construction site, otherwise you will be fined 50 yuan per person each time.
11. Party B shall not subcontract a third party when contracting a single project.
12. The team leader abides by civilized safety regulations and cleans the dormitory regularly.
13. This contract is an internal contract and is invalid if used by outside parties.
9. Construction period and time requirements:
Party B must complete the production tasks according to the time specified by Party A. The construction period starts from signing the contract to completion acceptance. This contract is made in triplicate, with Party A and Party B each holding one copy and the head office filing one copy. It becomes effective when signed by both parties and becomes invalid when the entire amount is settled. (The agreed construction period is consistent with the construction period signed by Party A and the construction unit)
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal Representative (Signature): _________
_________year____month____day_________year____month____day
Water and electricity contract template 3
Party A:
Party B:
In accordance with the "Construction Law of the People's Republic of China", "Contract Law" and relevant construction laws, regulations and regulations , on the basis of free will and equality between both parties, and through consensus reached by both parties, Party A controls Buildings 1, 2, 3, 7, 8, 9, 10, 11, 12, 13, and 14 and Buildings 3, 4, and 5 of the shops in the south. The hydropower project shall be handed over to Party B for construction management and shall be responsible for its own profits and losses. In order to ensure quality and safety. The project was completed on schedule and the following terms were reached through negotiation between the two parties, clarifying the legal responsibilities and obligations of both parties.
1. Project Overview:
1. Name:
2. Location:
3. Contract Scope: Water within the drawings, Electrical labor and material contracting, construction and temporary facilities water and electricity installation, maintenance, dismantling and other construction.
4. Quality level: qualified.
5. Construction period: Subject to the contract signed between Party A and the construction unit.
2. Party A’s Responsibilities:
Party A is responsible for the technical presentation of relevant drawings before construction, the arrangement of the project progress plan, and the completion of the project tasks for each bid section this month. Team meetings are held every week to strictly supervise whether Party A's material procurement is consistent with the drawings. To supervise Party B’s use of materials, re-inspection must be carried out first. It can be used only after the test report is qualified. Provide technical guidance and cooperation for various types of work to Party B during construction. Party B does not construct according to the drawings and national standards during construction. Penalty will be imposed on Party A for causing losses. Penalties will be imposed on each team for delays in construction and loss of labor caused by rework. Penalty orders will be issued on the same day and signed by Party B. If Party B refuses to sign, Party A has the right to impose penalties. The penalty note will be deducted from the contract payment, and each subsequent fine will be deducted from each payment. Party A will refuse entry to those who fail to comply with the rules and regulations stipulated by the company and the project department when entering the construction site. Personnel who have not received level 3 education before entering the construction site are strictly prohibited from working. Educate those who do not follow national standards and project department systems during construction, and carry out brutal construction. If the violation of management and education is serious, Party A has the right to impose penalties. Penalties are also deducted from the contract payment. And the employees were dismissed from the project department. Any quarrels or group fights between construction workers and individual team members and management personnel, whether right or wrong, will be punished according to the regulations of the project department. If the circumstances are serious, the matter will be transferred to the public security department for handling. and has the right to unilaterally terminate the contract.
3. Party B’s responsibilities:
Party B shall construct in strict accordance with the drawings and relevant national standards. Must obey the management of the construction unit, quality inspection, supervisory personnel and project department management personnel. Documents and progress plans issued by the company's project department must be strictly implemented. Personnel entering the construction site must undergo level three education and labor experience. Persons with various illnesses, mental illness and those over 60 years old are strictly prohibited from entering the venue. The purchased materials must be submitted for inspection before they can be used. The inspection fee shall be borne by Party B. Purchased materials must have an official invoice. All commercial and residential buildings and shops have pre-buried water and electricity, and the installation and various types of work must cooperate with each other. Temporary water and electricity connections on the construction site, overtime water and electricity connections at night, lighting, and cable return to the warehouse shall all be borne by Party B. Party A will pay Party B no compensation. Party B must obey the management personnel to be available at all times. Do not block the normal construction of the project. The drawings shall be provided by the hydropower project estimate (settlement) and the information shall be borne by Party B. The project center and completion acceptance must submit the water and electricity data to Party A half a month in advance, so that the data can be sorted and bound before acceptance. The reserved openings in the bathroom and kitchen must be correct. Party B is responsible for repairing the hole wall grooves. Garbage should be cleared out after the work is completed. It is strictly forbidden to throw garbage at high altitudes outside the window. It must be transported downwards from the hanging basket for centralized stacking. If it is found that it is thrown at high altitudes outside the window every time A fine of five hundred yuan will be imposed, and financial and legal responsibility will be pursued for causing personal injury and damaging materials. If it is not cleaned up in time, Party A will send people to clean it up, pay double the salary, and impose penalties. The penalties will be deducted from the contract payment. Party B will take care of water and electricity materials by itself, and Party B will be responsible for preventing theft. Party A will not be held responsible. During construction, Party B shall be responsible for safety accidents caused by violation of regulations. Party A shall not bear financial responsibility, but Party A shall assist Party B in handling safety accidents.
4. According to the project quantity 20_ fixed labor cost ( ) multiplied by the coefficient ( ) plus ( ) mechanical cost is recorded. (Mechanical fees, scaffolding erection and disassembly, rust removal and oiling)
Party B does not need to provide any taxes or invoices for the above expenses.
5. Settlement method and period of contract price
1) The project payment shall be paid monthly according to the progress of the completed project amount ( ).
2) After all construction of the project is completed, the remaining warranty deposit ( ) will be paid to the labor cost of the project ( ). The warranty period is two years.
3). The warranty deposit of ( ) shall be settled at once within ten days after the warranty period expires.
6. Settlement and Payment Methods
The settlement method for hydropower projects shall be based on the contract signed between Party A and the construction unit. The preparation of hydropower budget (final) accounts shall be borne by Party B. Party B will deduct 16% of the total payment of the hydropower project to Party B, and Party B will bear the tax. Payment will start from the completion of the foundation to the four-story structure, and will be based on 75% of the actual completion of the single building. Later, 70% of the completed project will be paid based on the monthly progress. After the project is completed and accepted, the total price will be paid within one month after the project is audited and confirmed (after the reduction) ) 97%, leaving 3% as deposit. The warranty period shall be based on the project quality warranty signed by Party A and the construction unit.
7. Contract Effectiveness and Guarantee
Party A collects a contract performance deposit of RMB 200,000 from Party B. Party B will remit the contract performance deposit to Party A's account before signing the contract. The performance deposit does not bear interest. After the project structure is fully capped, Party A will return the performance deposit of 100,000 yuan, and the remaining 100,000 yuan will be returned to Party B in one lump sum after the project is fully inspected and accepted.
8. Liability for breach of contract
After the contract between Party A and Party B is signed, Party B must promptly organize construction personnel to enter the site, and sign a safety production responsibility guarantee letter and a copy of the personnel's ID card with the construction personnel. The labor contract shall be handed over to the project department for unified management. During the construction, Party B disobeys Party A's management or makes unreasonable troubles, stops work, goes on strike, petitions, does not construct according to the drawings, cuts corners, passes off materials as good, or operates in serious violation of regulations, etc. Party A has the right to unilaterally terminate the contract and withdraw from the venue, causing losses and reputation damage to Party A. Party A has the right to recourse and deduct it from the contract performance deposit and contract payment. The shortfall shall be appealed to the competent authority for compensation. If Party A fails to comply with the terms of the contract, Party B has the right to pursue the water and electricity contract payment from Party A and the construction unit.
9. Others
For unfinished matters, the two parties will resolve the matter through friendly negotiation. If negotiation fails, the matter will be submitted to the competent authority for mediation. If mediation fails, appeal to the competent authority. This contract is made in four copies, with each party holding two copies. It will take effect after both parties sign and seal the performance deposit and deliver it. It will automatically expire after the project is completed.
Party A (official seal): _____________ Party B (official seal): _________
Legal representative (signature): _____________ Legal representative (signature): _________
_________year____month____day_________year____month____day
Water and electricity contract template 4
Party A: (contractor) ___
Party B: (Contractor)___
Based on the principle of mutual trust, the following agreement is reached regarding Party A’s hydropower project.
Article 1 Project Overview
1. Decoration construction location_____
2. Construction period: _year_month_day to _year_month_day
3. The estimated cost of this project is RMB.
Article 2 Agreement on Material Supply
1. Materials provided by Party A
Party B must propose to Party A at least three days in advance the need to purchase the next process A list of materials and the quantities required. Party A shall provide Party B with the materials required on time.
Party A is responsible for purchasing and supplying qualified products that meet the design requirements and should be delivered to the site on time. Party A and Party B should handle the handover procedures. If Party B discovers that the materials provided by Party A have quality problems or differences in specifications, it should promptly report them to Party A. Party A still expresses its intention to use them, and Party A will bear the responsibility for any resulting project losses.
After the materials supplied by Party A arrive at the site on time, Party B will be responsible for keeping them. Party B will be responsible for compensation for any losses caused by improper storage.
2. The decorative materials purchased and supplied by Party A shall be used for residential decoration as stipulated in this contract. Party B shall not misappropriate them for other purposes without the consent of Party A. If Party B violates this provision, Party A shall be compensated double the price of the misappropriated materials.
3. Materials provided by Party B
Party A shall go to the site for acceptance of the water and electricity materials supplied by Party B. If they do not meet the design and construction requirements or have different specifications, they shall be prohibited from use. If it has been used, Party B will be responsible for any losses caused to the project.
Party B will bring its own necessary tools for construction (awls, cutting blades, etc.) to ensure safety and good usability. Party B will bear the maintenance and loss costs of the tools.
Article 3 Agreement on Project Quality and Acceptance
1. This project shall strictly implement the national "Construction Specifications for Residential Decoration and Renovation Projects" GB50210-2001 and "Quality of Building Decoration and Renovation Projects" Acceptance Specifications" GB50327-2001 and refer to "Fujian Province Home Decoration Project Quality Standards and Other DB-35/T98" and "Shanghai Home Decoration Project Quality Acceptance Standards"
2. Due to Party B's poor construction technology If there are quality problems caused by its own reasons such as lack of responsibility and lack of responsibility, the rework costs will be borne by Party B and the construction period will remain unchanged.
3. Project completion: Party B shall notify Party A for acceptance two days in advance. Party A shall organize acceptance and go through the acceptance procedures within two days of receiving the notice.
Article 4 On-site management agreements related to production safety and fire prevention:
1. Strictly abide by the prescribed decoration construction time, reduce construction noise, and reduce environmental pollution. Handle the nuisance problems caused by the construction
and the relationship with surrounding units and residents.
2. Without the consent of Party A and the approval of relevant departments, the original building structure and various equipment pipelines shall not be dismantled or modified at will during construction. 3. Before the project is completed and handed over to Party A, Party A is responsible for protecting all on-site facilities and finished project products.
4. Ensure that the decoration site is clean and tidy, and do a good job of cleaning and disposal before completion.
5. Responsible for the disposal of garbage generated by decoration and cleaning at least once a day.
6. If Party B needs to live on site due to construction reasons, he must pay attention to safety when using water and electricity in daily life. Party B will be responsible for any work-related injuries on the construction site.
7. Party B should take good care of the construction materials and prohibit idlers from entering the site.
8. Without the permission of Party A, Party B is not allowed to take any decoration materials provided by Party A out. If theft is found, Party B will pay double the price of the materials.
Article 5 Agreement on project price, contract content, construction technology, and settlement:
1. Method of payment for the project:
Acceptance of pipe layout 50% of the labor will be paid after the completion of water and electricity, 30% will be paid after the completion of water and electricity, and 20% will be paid after the overall completion acceptance is passed.
2. Party B’s contract content:
1), water and electricity slotting, Wiring, threading, and buried trenches
2), garbage removal during all hydropower construction processes (organized and bagged on site every day)
3), wall penetration, drilling, Cutting
4), switch panel installation
5), installation of small hardware, toilet, etc.
6), later installation of lamps
3. Project settlement method:
Actual settlement:
Total price settlement: 20 yuan/square meter (inner area)
Article 6 Liability for breach of contract :
1. If Party A fails to pay according to the time stipulated in the contract, Party A shall pay Party B a liquidated damages of 50 yuan for each day overdue.
2. If the construction is overdue due to Party B’s reasons, Party B shall pay Party A a liquidated damages of 50 yuan for each day overdue.
Article 7 Dispute Handling Methods:
When a dispute arises between the two parties due to project quality, the two parties shall negotiate to resolve it; if the parties are unwilling to resolve it through negotiation or mediation, or if negotiation or mediation fails, they may File a lawsuit in the People's Court in accordance with the provisions of this contract.
Article 8 Change and termination of the contract:
1. After the contract is signed by both parties and becomes effective, both parties must strictly abide by it. If either party needs to change the content of the contract, it must sign a new supplementary agreement after reaching consensus through consultation. After the contract is signed but before construction begins, if one party wants to terminate the contract, it should do so in writing, pay 10% of the total contract price as liquidated damages, and go through the contract termination procedures.
2. If any party proposes to terminate the contract during the construction process, it must submit it in writing to the other party. With the agreement of both parties, the liquidation procedures will be completed, a contract termination agreement will be entered into, and this contract will be terminated.
Article 9. Other agreements:
1. Both parties agree to have a third-party supervisor (Xiamen Home Run Decoration Supervision Company) conduct the negotiation work.
Without confirmation from the third-party supervision (Xiamen Home Run Decoration Supervision Company), Party A has the right not to pay Party B’s related expenses.
2. After confirmation by the third-party supervision (Xiamen Home Run Decoration Supervision Company), Party A must pay Party B’s relevant expenses as agreed.
3. Construction delays caused by force majeure or unforeseen factors such as weather and power outages can be postponed after confirmation by both parties.
4. Before moving in, Party A can require Party B to come to the site 5 times to cooperate with the cross-construction of other types of work. Party A must pay Party B a labor fee of 50 yuan/day for more than 5 times each time.
5. During the warranty period, Party B will repair quality problems caused by Party B’s construction and products free of charge. Party B must arrive at the site within 48 hours after receiving Party A’s notification. For problems caused by Party A's improper use or force majeure or unforeseen reasons, Party A shall pay Party B's maintenance costs based on the actual costs incurred.
Article 10 Supplementary Provisions
(1) This contract will take effect after it is signed (sealed) by Party A and Party B.
(2) The project shall not be subcontracted after the signing of this contract.
(3) This contract is made in duplicate, with Party A and Party B each holding one copy.
(4) The contract is valid until _year_month_day
(5) The water and electricity project is guaranteed for five years. After the warranty period, Party B shall pay Party A the corresponding fees for maintenance.
Party A’s signature: ___
_year_month_day
Party B’s signature (seal): ___
_year_ Month_Day
Water and electricity contract contract template 5
Contractor: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In accordance with the provisions of the "People's Republic of China and the Civil Code" and relevant laws and regulations, combined with the characteristics of the construction of home room decoration projects, the two parties, on the basis of consensus, negotiated the contract for the home room decoration project ( (hereinafter referred to as the project), the following agreement has been reached:
Article 1 Project Overview
1.1 Project location: _____________.
1.2 Project content and approach (family room decoration project construction project budget table).
1.3 Project contracting method: Both parties agree to adopt the following ______ contracting method.
(1) The contractor shall provide materials and materials;
(2) The contractor shall provide materials and part of the materials (the contractor shall provide a list of decoration materials), and the contractor shall provide part of the materials. Materials (the employer shall provide a list of decoration materials);
(3) The contractor shall _ and the employer shall provide materials (the employer shall provide a detailed list of decoration materials).
1.4 The project duration is ________ days, the start date is _________year____month____day, and the completion date is ________year____month____day.
1.5 Contract price: The project cost of this contract is (upper case): __________ yuan, lower case: __________ yuan (family room decoration project quotation).
Article 2 Project Supervision If this project is subject to project supervision, the contractor and the supervision company shall separately sign a "Project Supervision Contract" and notify the name, unit, contact information and responsibilities of the supervision engineer. contractor.
Article 3 Construction Drawings Both parties agree that the construction drawings shall be provided in the following ______ method:
(1) The contractor designs and provides construction drawings in duplicate, The developer and the contractor each have one copy (see the design drawings of the home decoration project for details);
(2) The developer entrusts the contractor to design the construction drawings, and the drawings are in duplicate, each for the developer and the contractor. One copy (see the design drawings of the home decoration project for details), the design fee (in capital letters) is ____________ yuan, which shall be paid by the contractor (this fee is not included in the project price).
Article 4 Obligations of the Contractor
4.1 ________ days before the start of construction, create conditions for the contractor to enter the construction site.
Including: clearing indoor furniture and furnishings or stacking and covering indoor furniture and furnishings that are difficult to move, so as not to affect the construction;
4.2 Provide water and power during the construction period;
4.3 Responsible for coordinating the relationship between the construction team and the neighbors;
4.4 Without demolishing the indoor load-bearing structure, if it is necessary to demolish or modify the non-load-bearing structure or equipment pipelines of the original building, be responsible for handling the corresponding procedures with the relevant departments Approval procedures;
4.5 If the contractor still needs to use part of the room during the construction period, he shall be responsible for the security and fire protection of the construction site;
4.6 Participate in project quality and construction progress Supervision, responsible for material arrival and completion acceptance.
Article 5 Contractor’s Obligations
5.1 Strictly implement safe construction operating specifications, fire prevention regulations, construction specifications and quality standards during construction, and complete the project on schedule and with high quality;
5.2 Strictly implement the regulations on construction site management, and must not disturb residents or pollute the environment;
5.3 Protect the furniture and furnishings in the original living room, and ensure the smooth flow of water pipes in the living room;
< p> 5.4 Ensure the cleanliness of the construction site and be responsible for cleaning the construction site after the completion of the project.Article 6 Engineering Change If the project and construction methods need to be changed, both parties should reach consensus and sign a written change agreement (or change project budget form), and at the same time adjust the relevant project costs and construction period (must guarantee 100 It takes 25-30 days for housing paint and latex paint projects with square usable area, and 5-10 days for installation projects).
Article 7 Provision of Materials
7.1 Materials and equipment provided by the contractor. The contractor should notify the contractor before the materials are transported to the construction site, and both parties must agree to accept and go through the handover procedures;
7.2 Materials and equipment provided by the contractor (the contractor provides a list of decoration materials) , the contractor shall notify the contractor before the materials are transported to the construction site and accept inspection by the contractor.
Article 8 Construction Period Delay
8.1 If the completion date is delayed due to the following reasons, upon confirmation by the contractor, the construction period will be postponed accordingly:
(1) Change in project quantity and design changes;
(2) Force majeure;
(3) Other circumstances in which the contractor agrees to postpone the construction period
Simple water and electricity Related articles on contract contract template:
★ Simple water and electricity contract contract template
★ Simple version of water and electricity contract contract template
★ Simple water and electricity installation contract contract 5 articles
★ The latest sample of a simple personal water and electricity contract contract
★ A concise version of a water and electricity labor service contract template
★ 3 simple home improvement water and electricity contract templates
★ 3 latest simple water and electricity contract templates
★ Simple water and electricity installation contract
★ Standard version of water and electricity construction contract template
★ Detailed version Hydropower project contract sample var _hmt = _hmt || []; (function() { var hm = document.createElement("script"); hm.src = "/hm.js?fff14745aca9358ff875ff9aca1296b3"; var s = document.getElementsByTagName ("script")[0]; s.parentNode.insertBefore(hm, s); })();