Contract number:
Low voltage power supply contract
Power suppliers and users
Company name: Company name:
Legal address: Legal address:
Legal representative (person in charge): Legal representative (person in charge):
Authorized Agent: Authorized Agent:
Tel: Tel:
Telex: Telex:
Postal code:
Bank of deposit: Bank of deposit:
Account number: Account number:
Tax registration number: tax registration number:
In order to define the rights and obligations of power supply enterprises (hereinafter referred to as power supply enterprises) and power users (hereinafter referred to as power users) in power supply and use, and to supply and use electricity safely, economically, reasonably and orderly, the power supply enterprises and power users signed the Power Supply Charter and the Power Supply Business Rules through consultation.
I. Address, nature and capacity of electricity consumption
1. Power address:.
2. The nature of power consumption
(1.) industry classification:.
(2) Classification of electricity consumption:
(3) Production shifts: weekends.
3. Power consumption
The power supplier determines that the total capacity of the electric equipment of the power user is kilowatts (see the attached table for the specific list of electric equipment).
Second, the power supply mode
1. The power supply direction provides the power supply with AC voltage of 50 Hz and 220/3 volts to the user.
2. The power supply mode adopts:
(1) The power supplier is connected from the low voltage pole of the line public transformer to supply power to the power user. The power supply capacity is kilowatts.
(2) When power users have high requirements for power supply reliability, the standby power supply adopts:
A. The power supplier supplies power to the power user from the low-voltage pole connection of the line public variable sign. The power supply capacity is kilowatts.
B. the power supply should be provided by the user. The capacity of self-provided generator (or uninterruptible power supply UPS) is kilowatts.
3. Please refer to the attached Power Supply Wiring and Property Rights Definition Diagram for the specific power supply wiring mode.
Third, the quality of power supply.
1. Under the normal condition of power system, the power supplier shall supply power to the power user according to the power quality standards stipulated in the power supply business rules.
2. If the number of power consumption groups of power users is less than 0.85, or the interference and influence caused by harmonic injection, impact load, fluctuating load and unsymmetrical load of power users exceeds the national standard, the power supplier has no obligation to guarantee its power quality. Power users should be responsible for taking measures to control it and bear corresponding responsibilities according to law.
Fourth, electric energy measurement.
1. Power supply enterprises shall install electricity metering devices according to the electricity consumption of different electricity price categories of power users. The property right of the electric energy metering device belongs to the power supplier. The record of electric energy metering device is used as the basis for calculating the electricity bill of power users.
(1) The electric energy metering device is installed in. The installed active watt-hour meter is ampere, the reactive watt-hour meter is ampere, and the current transformer ratio is. Used to measure electricity consumption.
(2) The electric energy metering device is installed in. The installed active watt-hour meter is ampere, the reactive watt-hour meter is ampere, and the current transformer ratio is. Used to measure electricity consumption.
2. When electricity users fail to measure by electricity price classification, the power supplier agrees to calculate the hard-to-measure electricity consumption according to the monthly kWh or% of the total monthly electricity consumption. If the proportion of electricity consumption and electricity consumption change, the power supply enterprise shall verify it at least once a year, and the power users shall cooperate.
Verb (abbreviation of verb) electricity price and electricity fee settlement method
1. Basis and method of valuation
(1) The power supplier shall regularly settle the electricity charges and related fees charged with electricity to the power user according to the electricity price approved by the competent pricing department with management rights and the records of the electricity metering device. During the validity period of the contract, when the electricity price and other charging items are adjusted, they shall be implemented in accordance with the provisions of the price adjustment documents.
(2) When the electricity consumption of electricity users is 100 kW or above, reactive power metering devices shall be installed in accordance with state regulations, and the power factor shall be adjusted to collect electricity charges. The assessment criteria for adjusting the number of power packs are.
(3) According to the national regulations, the power supplier shall implement (time-of-use electricity price) for the electricity users.
2. Electricity bill settlement method
(1) The power supplier shall read the meter according to the specified date and collect the electricity fee from the power user on schedule.
(two) the electricity user shall pay the electricity fee in full within the time limit prescribed by the power supplier. The way to pay the electricity bill is:
A. electricity users should send electricity regularly on the day of each month.
The power supplier entrusts the bank to charge the electricity fee to the power user.
C.。
3. According to the regulations of the state, the power supplier shall deposit a deposit of RMB yuan for electricity fee and RMB yuan for electric energy meter. When the electricity consumption is terminated, the power supplier shall refund the deposit in accordance with the regulations.
4. The electricity user shall not refuse to pay the electricity bill in any way or for any reason. When the user has any objection to the electricity metering and electricity fee, he should pay the electricity fee first, and the two sides should settle it through consultation. If negotiation fails, it may request the administrative department of electric power for mediation. If mediation fails, both parties can choose to apply for arbitration or bring a lawsuit to solve the problem.
Six, power supply facilities maintenance management responsibility
1. After consultation between the power supplier and the power user, it is confirmed that the demarcation point of operation and management responsibility of power supply facilities is located and belongs to. The power supplier of the Power Supply Facilities Bureau at the demarcation point is responsible for the operation, maintenance and management, and the power supply facilities at the load side at the demarcation point belong to the power users, who are responsible for the operation, maintenance and management.
2. Unless otherwise agreed, power suppliers and users shall not operate or change the power supply facilities they are responsible for without the consent of the other party. In case of emergency (endangering the safety of power grid and electricity consumption, or possibly causing personal injury or equipment damage), the operator shall notify the other party within 24 hours afterwards.
3. The legal liability of power supply facilities shall be divided by the responsibility of operation, maintenance and management of power supply facilities. Power supply enterprises and users should do a good job in the operation, maintenance and management of their respective power supply facilities. And bear corresponding responsibilities according to law.
Seven. Agreed matters
1. In order to ensure the safety of power supply and electricity consumption, the power supplier will regularly or irregularly check the electricity consumption of power users, and the power users should cooperate. When performing the task of electricity inspection, the electricity inspection personnel shall show it to the electricity user (electricity inspection and verification), and the electricity user shall send personnel to accompany and cooperate with the inspection.
2. Electricians who work on the power receiving devices of power users must obtain the electrician's network access operation license issued by the power management department before they can work at their posts.
3. The power metering device and power load management device installed by power users are maintained and managed by the power supplier, and the power users have the responsibility to protect their integrity and normal operation. If there is any abnormality, the power user shall promptly notify the power supplier for handling; If it is moved, modified or operated without authorization, it shall be handled according to Item 5 of Article 100 of the Power Supply Business Rules.
4. Power user-owned generator sets should be locked with the power grid. The connection mode confirmed by the power supplier shall not be changed by itself. Power users are not allowed to introduce (supply) power by themselves. Otherwise, it shall be handled according to Item 6, Article 100th of the Power Supply Business Rules.
Eight. responsibility for breach of contract
1. If the electricity user fails to pay the electricity fee on schedule, he shall bear the liability for breach of contract for late payment. The penalty for electricity charges shall be calculated according to the following provisions from the overdue date to the payment date:
A. The arrears of the current year shall be calculated at two thousandths of the total daily arrears;
B the annual arrears shall be calculated at three thousandths of the total arrears every day.
After being urged by the power supplier, if the power supplier still fails to pay the electricity fee, the power supplier may stop the power supply according to the prescribed procedures and recover the electricity fee owed and the penalty for electricity fee. 2. Both parties agree that, unless otherwise agreed in this contract, the responsibilities that cause this contract to be unable to be performed or fully performed shall be handled in accordance with the relevant provisions of the Power Supply Business Rules.
Nine. Method of dispute settlement
Any dispute arising from the performance of this contract between the power supplier and the power user shall be settled through consultation in accordance with the principles of this contract. If negotiation fails, both parties shall apply to the administrative department of electric power for administrative mediation. If mediation fails, both parties can choose to apply for arbitration or bring a lawsuit to solve the problem.
X. Validity and matters not covered in this contract.
1. Matters not covered in this contract shall be handled in accordance with Regulations on Power Supply, Operating Rules for Power Supply and other relevant laws and regulations. In case of adjustment of national laws and policies, relevant clauses of this contract shall be revised and supplemented as required.
2. This contract is valid from the date of the month to the date of the month.
3. When either the power supplier or the power user requests to modify, change or terminate this contract, it shall be handled in accordance with Article 94 of Power Supply Contract 1. This contract shall remain valid until a written agreement to amend, change or terminate this contract is signed.
4. This contract shall come into effect after the power supplier and the power user sign and affix their official seals.
5. The original of this contract is in duplicate. The power supplier and the power user each hold one copy. The effect is equivalent. Two copies, one for each party.
6. The annexes to this contract include:
a.。
b.。
The above attachments are an integral part of this service.
Power supplier: (seal) Power user: (seal)
Signature: (signature and seal) Signature: (signature and seal)
Signing time: Year Month Date Signing time: Year Month Date
attached table
List of electrical equipment
Serial number equipment name equipment specification * * *
Phase voltage (volts) capacity (kilowatts) of each unit Number of units
total
attached drawing
Schematic diagram of power supply wiring and property right division