5 technical staff work summaries
As a technician, the job is to assist the technical leader in his work and to continuously learn and enrich. The following is what I have compiled for you. Technical staff work summary, I hope it can help everyone!
Technical staff work summary 1
In the past year, I have been working in the project department, responsible for the electrical construction site In terms of management and technical guidance, with my own efforts and the support of my leaders, I was promoted from an ordinary electrical supervisor to a part-time technician in the electrical instrument workshop. Although the workload is much heavier than before, it provides me with an opportunity to fully understand the entire electrical system of the factory, strengthens my understanding and mastery of the factory's electrical system, and improves my understanding of when various types of accidents occur in some systems. The ability to independently analyze and deal with problems laid a good foundation for me to further engage in electrical technology work. Below I will summarize the work I have undertaken as a workshop technician this year.
1. Understanding and attitude towards the work of electrical instrument technicians
After I was appointed as an electrical instrument workshop technician, I began to gradually enter this role. Although I previously worked as an electrical equipment technician at ZZ Co., Ltd., I have an in-depth understanding and mastery of high and low voltage electrical technology and equipment. But since I came to the new construction site, and in the process of engaging in electrical supervision work, I feel that the pressure to be a qualified electrical instrument technician is increasing.
The number of electrical equipment in the first factory is huge; there are many types of electrical equipment, involving all aspects of high and low voltage power transmission, distribution, power transmission and electrical maintenance; the mixed use of new and old equipment increases the probability of electrical equipment failure and troubleshooting difficulty. Faced with this pressure, I feel the great responsibility of my own. Providing technical support for the normal and stable operation of the factory's electrical equipment and handling unexpected failures have become the focus of my work. I believe that I have the ability to do this job well. The greater the pressure, the greater the motivation. In addition, I communicated with the maintenance group, operation group and instrument group of the workshop to understand the knowledge level of the existing employees and the technical problems that need to be solved in the current work.
2. Work content this year
The centrifuge in the workshop cannot be started when it is full of materials. After I went to check, I found that the load of the centrifuge was too heavy before starting. The power sent by the frequency converter cannot overcome this torque, causing the centrifuge to fail to start. After understanding the cause of the work, I reset the starting torque of the frequency converter and put in a DC braking resistor, which extended the starting time and ensured the normal use of the centrifuge. The circuit board of the main hot water solenoid valve in the zz workshop is often broken down. My analysis is that the working power supply is contaminated by the frequency converter and other DC electrical equipment, resulting in voltage superposition, forming a high voltage, and causing breakdown of the working circuit board. Therefore, I suggest that the workshop install a voltage stabilizer and provide power to instrument equipment separately to ensure the safe use and stable operation of instrument equipment. These are just a small part of my daily work. Such emergencies often happen. When I need to deal with them, I will always be the first to come to the scene and do my best to troubleshoot the workshop as soon as possible and restore the equipment to normal. run.
3. Shortcomings in the work and next-step work goals
In this year’s work, I have achieved certain results through my own efforts. But I feel that there is still a big gap between the standards of an excellent technician. This is mainly reflected in the following: In the event of an emergency, I was not particularly familiar with the performance of some new equipment and needed to find information, which affected the timeliness of equipment troubleshooting; the establishment of equipment files has not yet been carried out, mainly the completion data It is not perfect, and being responsible for the project takes up a lot of my energy. In this work, I feel a little inadequate; the training work has not yet been incorporated into the standardized system. Although the training work is now carried out, due to the lack of coordination, it is easy to train normally. The effect was reduced; the team's equipment standardization management work was not grasped, resulting in the team's work efficiency not being further improved.
In view of these shortcomings, I plan to continue to strengthen my own learning in the next step, master the new equipment as soon as possible, and pass on this new knowledge to employees as soon as possible to improve the overall electrical equipment troubleshooting capabilities of the factory. Precision and efficiency. Technical staff work summary 2
I started working after graduation and have been engaged in technical construction in the construction unit. I have certain construction experience and I am confident that the # building project will be successfully handed over to the owner.
Engineering construction is a process of transforming the designer's ideas from ideology to physical form according to the design drawings. To do a good job in engineering construction, you must first be familiar with the construction drawings, grasp the designer's intentions, and complete the process from The process of understanding the design intent and then going back to revise the drawings. Secondly, it is necessary to strengthen the understanding of the drawings, be familiar with the basic overview of the project, consider the specific construction plan, and initially clarify the key points and difficulties of engineering and technical construction, so as to prepare for future construction operations. .
In the process of project construction, the measurement and setting out work is the top priority. It runs through the entire project construction and is the soul of the project construction. If the project is to be done well, the measurement and setting out work must be done well. Do it well, so the procedures for testing, proofreading, and review are indispensable; secondly, check each construction layer, construction section, and construction point based on the entire set of drawings to avoid missing small components of the project; thirdly, it is to inspect and implement Whether the understanding of the actual operation level of the project is consistent with your own ideas, communicate in a timely manner when problems are discovered, and nip problems in the bud.
After the construction of a certain project section is completed, timely inspection and acceptance should be carried out, experience and lessons should be summarized, and the problems discovered should be promptly corrected in the next construction section to reduce the continuous occurrence of errors.
Engineering construction is a very rigorous work. Engineering and technical personnel must carve it as their own artistic product, strive for excellence, have a good work style, and be in line with the country ( Do not waste resources), work with a responsible attitude towards society and owners, and have the determination to "do a project, build a monument, and win a reputation". Only in this way can you do a good job and become a qualified engineering technician. personnel.
Engineering construction is a group work. It cannot be completed by one or a few people. It requires close cooperation from quality inspection stations and design institutes to labor workers. It is a complex task to complete, so it is particularly important to communicate and cooperate with each other, otherwise, doing a good job will become an empty talk.
As the saying goes, "If the skin is not there, the hair will be attached." If a migrant worker does not consider the economic benefits of the boss and the company, he is ruining his future. He will not be a qualified migrant worker sooner or later. will be eliminated by society. The working area of ??engineering construction is large and there are many workers. To achieve good economic benefits, material management is very important. However, it is not enough to rely on the strength of one or a few people to manage materials. It requires everyone. *** work together to achieve it. As a technician, when managing materials, we must not only consider how to save them from a technical perspective, but also cooperate with the project manager and colleagues to effectively monitor the site, so that workers on site can develop good habits of saving materials and create better results for the company. economic benefits and lay a good foundation for its own development.
The length of the project construction period is also an important indicator that reflects the economic benefits of a project. Shortening the construction period will not only enable the project to be put into operation ahead of time and create considerable profits for Party A, but also reduce the cost of numerous machinery and materials for our construction unit. The rental fee reduces the cost of personnel management, reduces construction costs for the company and the boss, and improves economic benefits; in this regard, the interests of Party A and our construction unit are unprecedentedly consistent, so the construction period of the project is the focus of everyone's common concern. As a member of the project management staff, it is our duty to assist the project manager and work together to make suggestions to shorten the project duration.
A person's ability and energy are limited. In order to better and correctly understand the drawings and specifications, communicate frequently and ask for instructions in advance, you can avoid a lot of unnecessary arguments and rework, and achieve the unity of everyone's thoughts. , so that the project can meet the plan requirements smoothly and on schedule.
Although I am younger, have little work experience, and have limited construction experience, I will give full play to the advantages of young people such as being studious, diligent, hard-working, and full of energy to make up for the above shortcomings and study diligently. Ask frequently, strive to become an excellent technical talent, and do your best for the development of Hongsheng Company.
I like my major and my position even more. I believe that under the guidance of Party A and the engineering department, the # building project can be constructed smoothly and completed satisfactorily in accordance with the requirements of the contract. Acceptance tasks. Technical Staff Work Summary 3
20__ is my third year working in the company. In these three years, as the company continues to develop and grow, I personally have also grown from a person who doesn’t know the so-called edge. Qing gradually matured, from a layman who knew nothing about balancing machines to a professional technician who was familiar with the principles of balancing machines and familiar with the company's various products. Moreover, I also gained a deeper understanding of department management and communication with people. I know that the progress I have made is inseparable from the training of company leaders.
Without their tireless teaching and repeated opportunities, I would not have made the progress I have today. Looking forward to 20__, it is a year of opportunities and challenges. I will work hard around the company's leadership core. , work hard and make their own contribution to the company's development to a higher level.
Looking back at the beginning of 20__, although the company achieved gratifying results in 20__, the company leaders did not feel complacent. Instead, they set higher goals for 20__. I also immediately entered my role after a short adjustment. At that time, according to the instructions of the leader, I was responsible for the management of the R&D department and the production management of the electrical workshop. I first specified the detailed rules of the department's work scope, which clarified the work tasks of the entire department.
I also stipulated the scope of responsibility of each department member in the entire department work and issued it to them in writing. I formulated a composition chart of department members to clarify the subordinates of superiors and subordinates. relation. I want to build a disciplined and cohesive team to better serve the company while completing the departmental tasks assigned by the company. This is what the leader hopes I can do.
At the beginning of 20__, great changes took place in my department personnel. First of all, __ resigned. According to the instructions of the company leaders, I quickly adjusted the structure of the department and transferred __ who was originally mainly responsible for electrical production. Taking over the R&D work of __, I arranged __ who was only involved in electrical production to be in the position of being responsible for production management and participating in production. When I was sorting out the work backup of __, I found that the all-in-one microcontroller program could not work properly. I used other I found __ and retrieved a usable program, and completed the Yidong project that __ was responsible for at that time. In April, __ resigned, which affected the writing of the first micro-motor automatic balancing machine. In order to ensure that the equipment participated in the exhibition, I worked overtime continuously. , the May Day holiday was no exception, and finally achieved the goal of smooth movement of the equipment before the exhibition.
At this time, the company leaders also continued to provide me with new technical personnel to supplement the department's work. At the stage when new personnel are not yet fully qualified, in order to complete production tasks, I often wear multiple hats, from electrical diagram design, to guiding and participating in the completion of power distribution, to writing new PLC programs and touch screen programs, and in equipment factories. Debugging is done by myself. Many times I use my spare time to work overtime in order not to delay the progress of the project. When I work late and don't have a car, I spend my own money to take a taxi home. The Chongqing automatic line project, Shanghai automatic punching machine project, and Dehui Dahua automatic machine project were all completed at this stage.
I also work hard to train new people. I dropped __ into the R&D office and guided him to use protel drawing software to make electrical schematics. When it comes to plc programming, I often tell him my ideas and let him write programs. , but because I was too eager for success and put too much pressure on him, he couldn't bear the pressure and resigned. In this matter, I re-understood the methods and perspectives of cultivating talents. If you want to make good steel, you should find good materials. No matter in terms of will, quality or moral cultivation, after selecting talents and then working hard to cultivate them, you will not cause any problems. Waste of manpower and material resources.
In the following work, I also selected talents according to this idea. Later, among the talents sent by the company, there were indeed more suitable candidates, but some of them left the company for one reason or another.
In 20__, the company completed 7 automatic machines, among which I independently completed the electrical design work, program design and in-factory debugging work for three stations __, __, and __. The in-factory debugging work of cutting and post-program error checking work, the in-factory debugging work of __ axle brake drum, I organized the electrical wiring work of 4 of the equipment.
The company has completed 4 double-sided machines, among which the vb software changes and in-factory debugging of the university’s crankshaft balancing machine, the in-factory debugging of __ rings and __ were completed by me.
The company completed 18 single-sided machines. After __ resigned, I completed the electrical drawing design independently. If the after-sales personnel are not in the company, I will also perform in-factory debugging of the equipment.
No errors in electrical design, production and procedures have caused losses to the company.
When there are problems with the company's office equipment or office network, I will deal with them at any time to ensure that the company operates normally. Seventy percent of the industrial computers are installed and debugged by me. When the customer service staff is away, I can assist the customer service department in answering customer questions and repairing customers in the city. Among them, Fuao has been repaired and maintained dozens of times.
20__ is a difficult year. Due to the influence of the world economic environment, the company's performance has not reached the ideal state, but I will not be intimidated by these objective conditions. I firmly believe that under the leadership of the company's leaders Next, we will be able to overcome the difficulties smoothly. In 20__, my work will be mainly arranged in electrical production. I am ready to formulate more electrical production processes so that every job has a unified standard. The goal is to achieve less than one electrical wiring error rate for each piece of equipment in the factory. Establish a reasonable reward and punishment system and performance evaluation system for electrical production personnel so that staff can be more motivated. Organize weekly business capability training in the electrical production workshop to ensure that each person can independently debug single-sided and double-sided equipment and independently check lines. In terms of talent training, I will try my best to help new employees and provide the company with electrical talents.
My requirement for myself is to strictly abide by the company's rules and regulations. Working hard to improve my management skills, I set a goal for myself. In 20__, I will achieve zero errors in the electrical part of the equipment. Ask the company leaders to supervise my work. Technical Staff Work Summary 4
In the blink of an eye, __ years have passed. Now we will summarize and report the work of the Engineering Department in the past year from the following aspects.
1. Progress Control
According to the project progress requirements set by the company at the beginning of the year, the main project should be completed by the end of __. Actually, by the end of the year, the main project will be completed and the masonry project will be completed. __, delayed by an average of __ months compared to the original scheduled construction date.
The main reasons for the delay in the construction period are the following three aspects:
1. We underestimated the difficulty of the project in advance and the contract period was too tight. The quota construction period of this project should be __ days, but we compressed the construction period to __ days. This construction period can only be completed as planned under ideal circumstances. However, due to the difficulty of this project, any unforeseen circumstances The occurrence of any situation may cause delays in the construction period and may cause chain reactions.
2. We underestimated the actual strength of the construction unit in advance. Both construction units belong to the contracting responsibility system. The construction unit charges the contractor's management fees. The contractor is responsible for the capital investment and management personnel allocation of the project. The construction unit does not provide the contractor with any financial support or personnel support. At the same time, it also lacks necessary In terms of management support, there is a phenomenon of package hosting.
The main reason that restricts the construction period is the funds and management of the construction unit. Insufficient financial strength leads to the frequent shortage of materials and equipment. Construction sites often stop working for materials, which often results in the loss of construction personnel. The serious shortage of labor causes serious delays in project progress.
In terms of management, on the one hand, the sense of responsibility and quality of management personnel do not meet the required requirements; on the other hand, due to too many levels of subcontracting at the labor service level and too detailed grouping of work shifts, flow operations cannot be formed, resulting in difficulties for project managers in personnel deployment. At the same time, due to the subcontracting of labor services and too many management levels, the management intentions of upper-level managers, especially project managers, cannot be implemented in a timely and effective manner by the team. On the other hand, today's migrant workers are also very difficult to manage, and they often confront managers over minor issues. This is the main reason for project delays.
3. Problems in our own management: Although the engineering department, especially the department manager, has taken a series of positive measures to deal with the delays in the construction period of the construction unit, they are not strong enough to deal with some problems, especially during the construction period. The serious shortage of personnel in the unit and the untimely supply of materials lacked sufficient and effective management measures and contingency measures, which were also factors that led to the delay in the construction period. These require all of us, especially department managers, to work hard to learn project management knowledge in future work, master more good management experience and management methods, and further improve our management level, so that we can live up to the trust of the leaders and contribute to the development of x real estate Make a greater contribution. In response to the emergence of the above problems, all the staff of our Engineering Department, with the strong support and help of the General Manager's Office, took a series of measures in terms of funding and other aspects, and achieved good results. During the construction process in the second half of the year , not only curbed the momentum of further delays in the construction period, but also reduced the delayed construction period step by step.
2. Quality Control
Since the start of construction, the Engineering Department has always adhered to the principle of quality first and strictly controlled quality. So far, the construction quality is quite satisfactory. Although there have been some quality declines, they have been resolved in time, maintaining the overall momentum of high-quality projects and laying a solid foundation for the creation of the There were some problems, but the overall quality of our project was still affirmed. Judging from the current situation, it is not a big problem for our project to pass the provincial high-quality main structure acceptance.
3. Cost control In terms of cost control, we mainly start from the following aspects
1. Reduce unnecessary cost investment in the drawings as much as possible, such as for civil air defense basements Construction, in order to save costs, we jointly studied with the company leaders and decided to construct the building in accordance with the drawings of the x design institute on the building plane, but in accordance with the drawings of the x design institute on the structure. This project is estimated to save the company nearly one million yuan in costs. Yuan; we also added some parking spaces available for sale through technical transformation without increasing costs, thus increasing sales revenue. At the same time, the installation professional also saved the company nearly one million yuan by proposing some rationalized plans, and thus received public praise and material rewards from the company.
2. For some technical changes that occur during the construction process, we make timely changes that have little impact on the investment cost or reduce the cost. We organize technical analysis for changes that increase costs but cannot be maintained unchanged. Choose the most economical feasible change plan. At the same time, the drawing change approval system is strictly implemented, and all changes must be approved by the General Manager Office before they can be implemented.
3. Regarding project visas, we have re-formulated the approval system for the project visa process and implemented seven-level approvals including supervising engineer, director, engineer in charge, engineering manager, budget engineer, financial manager, and general manager office. Check at all levels, resolutely return visas that should not be paid, conduct strict fee review for visas that actually occurred and should be paid, and eliminate unreasonable expenditures on this fee.
4. Safe and civilized construction on site
Since the goal of this project is a provincial-level civilized construction site, we have also paid enough attention to the safe and civilized construction on site. In the early stage, due to the conditions, Due to the limitations, civilized construction on site could not be done very well. In the later period, we made great efforts to focus on civilized construction on site and achieved good results. At present, it has undergone multiple inspections at the Shengshi Security Inspection Station and is expected to pass the acceptance of provincial civilized construction sites in the near future.
5. Management of the supervision company
Generally speaking, there are certain problems in our management of the supervision company, mainly due to the lack of strong tactics and failure to strictly follow the contract requirements. Relevant personnel from the supervision company arrived at their posts, which resulted in the overall low quality of the supervision personnel. In the end, our engineering department had to spend a lot of energy to help the supervision company complete the work that should have been completed by the supervision. Although the work was basically completed satisfactorily with our joint efforts. The work was completed, but the labor intensity of the comrades in the Engineering Department was correspondingly increased. But on the other hand, we should be aware of why the overall quality of the personnel dispatched by the supervision unit to the construction site is low? We believe that the reason is that the supervision fee is too low. If the supervision fee is low, the salary of the supervisors sent will be lower. Very low x/month), the quality of supervisors with low wages must be low. Technical staff work summary 5
I really lament the flight of time. In the blink of an eye, one year has passed, and it has also been a year of my work. Since I came to work at XX company, I have been working as a construction technician in the project department. These days have been both sweet and sour, and more importantly, I have gained. Summarize the work of the past year and talk about your understanding of technical work from a personal perspective.
1. Project Overview and Importance
An important special project of the __ project is a transportation artery connecting the hub and Lechang City. It uses the old Beijing-Guangzhou Railway Pingle The roadbed of the branch line was reconstructed, with a total length of 13.791 kilometers. It was designed according to the standards of third-class highways. The concrete road surface is 6.5 meters wide and is a two-lane road. The completion and opening of the left bank road will create good traffic conditions for the transportation of raw materials and mechanical and electrical equipment for the entire Lechang Gorge Water Conservancy Project main project, provide a strong traffic guarantee for the realization of the project construction goals, and ensure that the __ project will be completed in October this year The dam has reached an elevation of 164 meters, ensuring that it will have water storage conditions by the end of this year and is on the "fast track".
2. Project Quality Management
Technical personnel work on the front line of construction. They must be responsible for the quality, safety, and progress of the construction process, and must report in a timely manner what is needed during the construction. Solve and improve problems and propose solutions to leadership. During the work, the relationship with the construction personnel and supervising owners must be properly handled, and everything must be done to ensure progress, quality and safety. To engage in technical work, you must also have an attitude that is good at learning and research. It is not enough to just rely on the knowledge learned in books. You must have rich on-site experience. This requires a detailed understanding of the construction drawings in advance and keeping them in mind. Form a targeted construction process.
As an engineering technician, his work is also relatively hard. He must make plans and prepare for follow-up work in advance to ensure that when the follow-up work is implemented, there will be no rush, no shortage of things, and no impact on the work. During the construction period, we must also do a good job in supervision during the construction process, conduct a comprehensive inspection of the project quality, promptly raise and correct potential problems that arise during the construction process, and conduct full-process follow-up inspections of the construction technology of special processes. Ensure that each process is qualified, cooperate with supervision technicians to inspect and solve various problems found, and make timely rectifications to ensure that the construction quality of each link reaches the standard. At the same time, I have to run around the site to guide construction during the day, and at night I have to sort out the day's internal work materials and make arrangements for the next day's work. Especially during the rush period, it is even harder, which requires a hard-working spirit to complete the day's work in time.
As an enterprise, profit is the ultimate goal, so on the premise of ensuring the quality of the project, we should pursue maximizing profits. This requires that attention should be paid to rationally arranging construction techniques and procedures during construction to minimize project costs. At the same time, attention was paid to saving manpower and materials during the construction process. Any changes that can be added must be sought from the supervisor and owner in a timely manner.
3. Compilation of project data
Various internal data and quantity confirmation data generated during the construction process must be signed by the supervision engineer in a timely manner to avoid affecting later measurement. During this year, I have been working as a technical staff member of the left bank road project of Lechangxia Water Conservancy Project, responsible for the construction acceptance, quality supervision, quality assessment, completion acceptance and other data collection work of the fifth section.
Since I am familiar with on-site construction, I also need to help the internal team to organize and report the changes in a timely manner to provide data basis for future settlement and completion.