What items does the pressure vessel inspection report include?

Record 2

Report number:

Comprehensive inspection report of pressure vessel

Unit of use:

Container name:

In-unit number:

License number:

Equipment code:

Inspection date:

(Print the name of inspection organization)

Annotation item

1. This report is a conclusion report on the inspection of pressure vessels in use according to the Rules for Periodic Inspection of Pressure Vessels.

2. The report should be printed by computer, or filled in with pen and signature pen. The handwriting should be neat, and the alteration is invalid.

3. This report is invalid without the signatures of inspectors, auditors and approvers, and without the number of approval certificate, special seal for inspection or official seal of inspection organization.

4. This report is made in duplicate, with the inspection agency and the employing unit holding one copy respectively.

5. If the inspected unit has any objection to the conclusion of this report, please submit a written opinion to the inspection institution within 15 days from the date of receiving the report.

Unit address:

Postal code:

Contact telephone number:

Catalogue of comprehensive inspection reports for pressure vessels

Report number:

Number of inspection items, page numbers, attached pages and attached drawings

1 conclusion report of comprehensive inspection of pressure vessels

2 pressure vessel data review report

3 Macro Inspection Report of Pressure Vessel (1)

4 Macro Inspection Report of Pressure Vessel (2)

5 wall thickness measurement report

6 wall thickness inspection report

7 X-ray inspection report

Ultrasonic test report

9 magnetic particle inspection report

10 permeability test report

1 1 acoustic emission test report

12 material composition analysis report

13 hardness test report

14 metallographic analysis report

15 safety accessories inspection report

16 withstand voltage test report

17 air tightness test report

18 additional inspection and test report

Report on comprehensive inspection conclusion of pressure vessel

Report number:

Unit of use

Unit address unit code

Postal code of contact telephone number of management personnel

Container name

Type of equipment code container

Use the numbering structure in the certificate numbering unit.

Main inspection basis: Regular inspection rules for pressure vessels.

Location, degree, nature and treatment opinions of defects found during inspection (drawings or pages shall be attached if necessary):

After inspection, the safety status of the pressure vessel is Grade A..

Allow/monitor operation parameters (basis for monitoring or scrapping): pressure: MPa.

Temperature:℃

Media:

Others:

Date of next comprehensive inspection: date of year, month, and date of agency approval certificateNo.:

(Special Seal for Inspection of Inspection Organization)

date month year

Inspection: Date:

Review: Date:

Date of approval:

* * *

Pressure vessel data review report

Company number/equipment code: Report number:

Design unit design date

Design code container drawing number

Manufacturer's factory number

Manufacturing specification manufacturing date

Date when the installation unit was put into use

Container inner diameter mm Container height/length mm

Volume (heat exchange area) m3 (m2) Filling mass/coefficient

Head support type

main body

Material cylinder

Thickness cylinder

Head mm

Sheath (heat exchange tube) Sheath (heat exchange tube) mm

Lining mm

Design pressure shell side (inner cylinder) MPa actual

operate

Pressure shell side (inner cylinder) MPa

Tube side (jacket) MPa tube side (jacket) MPa

Design temperature of shell side (inner cylinder) Actual temperature℃

operate

Shell side temperature (inner cylinder)℃

Tube side (jacket)℃

Working medium shell side of corrosion allowance cylinder (inner cylinder)

Head tube side (jacket) shell

Data review

Problem record

The safety status of the last comprehensive inspection was rated as: class.

Inspection: Date: Approval: Date:

* * *

Macroscopic Inspection Report of Pressure Vessel (1)

Company number/equipment code: Report number:

Remarks on inspection results of inspection items

structure

Check 1 nozzle body, butt weld and fillet weld.

2 Opening and reinforcement

3 welding layout

Four-corner joint

5 Lap joint

6 heads (end cover)

7 Bearing or bracket

8 flange

9 sewage outlet

geometry

Size and weld inspection: 10 Maximum butt joint deviation of longitudinal/circumferential weld /mm

1 1 Maximum edge angle of longitudinal/circumferential weld /mm

12 weld residual height mm

13 fillet weld thickness/leg height/mm

14 Maximum diameter and minimum diameter m of the same section

15 head surface roughness mm

16 straight edge height mm

Longitudinal buckling of straight edge of 17 head

18 butt joint thinning treatment of unequal thick plates (forgings)

19 thickness difference between two sides of butt welding transition of unequal thick plate (forged) parts mm

20. Vertical containers and spherical containers are vertically suspended.

other

Inspection results:

Inspection: Date: Approval: Date:

Note: For uninspected or uninspected items, tick "—"in the column of inspection results; No problem or qualified inspection items shall be marked with "√" in the inspection result column; If there is any problem or the inspection item is unqualified, mark "×" in the inspection result column and explain it in the remarks.

* * *

Macroscopic Inspection Report of Pressure Vessels (2)

Company number/equipment code: Report number:

Remarks on inspection results of inspection items

external

Check the 1 box for cracks, overheating, deformation and leakage.

There are cracks, overheating, deformation and leakage in the weld.

3 Corrosion and mechanical damage of internal and external surfaces

4 fastening bolts

5 bearing, bearing damage

6 sinking, tilting and cracking of large container foundation

7 Discharge (drainage, sewage) device

8 Quick-opening pressure vessel safety interlock device

9 Leakage of drainage holes in multilayer packaging and hot sleeve containers

10 material of main pressure parts

1 1 sealing surface of safety accessory interface

12 sun visor and operation desk fastening

13 tank is connected with chassis, etc.

14 The breakwater and escalator in the tank are connected with the tank.

15 tank car tensioning belt, saddle and intermediate bracket

Insulation layer inspection 16 whether the insulation layer is damaged, detached, damp and cold running.

Penetrating corrosion, cracks and depressions of 17 metal lining

18 surfacing layer cracking, peeling and falling off.

19 nonmetallic lining is damaged, cracked and falls off.

20 Non-metallic material lining pressure vessel, abnormal body wall temperature during operation.

other

Inspection results:

Inspection: Date: Approval: Date:

Note: For uninspected or uninspected items, tick "—"in the column of inspection results; No problem or qualified inspection items shall be marked with "√" in the inspection result column; If there is any problem or the inspection item is unqualified, mark "×" in the inspection result column and explain it in the remarks.

* * *

Wall thickness measurement report

Company number/equipment code: Report number:

Measuring instrument model measuring instrument number

Precision coupling agent for measuring instruments

nominal dimension

Measured thickness of cylinder

Minimum wall thickness of cylinder

Head mm head mm

Measuring point of surface condition

Location map of thickness measuring point:

Thickness measurement record

Measuring point number measuring point thickness measuring point number measuring point thickness measuring point number measuring point thickness measuring point number measuring point thickness measuring point number measuring point thickness measuring point number measuring point thickness measuring point number measuring point thickness.

Test results:

Inspection: Date: Approval: Date:

Note: If the thickness measurement record table is insufficient, additional pages can be added according to the thickness measurement record format.

* * *

Wall thickness inspection report

Company number/equipment code: Report number:

Maximum working pressure MPa and measuring inner diameter mm of wall thickness detection part.

Measured minimum wall thickness mm material allowable stress MPa corrosion allowance mm

Welding joint coefficient Head shape coefficient Working temperature℃

Check selection criteria

Description of the check parameter value:

Wall thickness check calculation:

Inspection results:

Note: the audit of our school does not replace the design calculation, and it cannot exempt the designer from the responsibility.

Wall thickness inspection: date: approval: date:

* * *

X-ray inspection report

Company number/equipment code: Report number:

Source type □ X-ray □Ir 192

□Co60 □ Other sensitization methods

Model and instrument number of flaw detector

Tube voltage/source activity kv/ci tube current ma

Image quality meter model image quality meter index

Minimum exposure time in transillumination mode

Focal length mm focal length mm

Film type film blackness

Detection standard detection rate% mm

Inspection site (cloth sketch):

Radiographic film evaluation form

Negative number, one-time transmission length

(mm) Comment on defect location, defect nature and defect size (mm)

Evaluation results:

Test: Date:

Remarks: Date: Approval: Date:

Note: If the radiographic film evaluation form is insufficient, additional pages can be added according to the format of the evaluation form.

* * *

Ultrasonic test report

Company number/equipment code: Report number:

Testing instrument model testing instrument number

Probe model test block model

Sensitivity dB detection method/evaluation of scanned surface

Coupling agent compensation database

Detection standard detection rate% mm

Schematic diagram of inspection site (section) and defect location:

Ultrasonic detection fruit evaluation platform

region

Numbering defect

Buried depth of position defect

Length of defect indication (mm)

Defect height

(mm) Remarks on evaluation level of defect reflection amplitude

Test results:

Inspection: Date: Approval: Date:

Note: If the evaluation table of ultrasonic test results is insufficient, a continuation page can be added according to the format of the evaluation table.

* * *

Magnetic particle inspection report

Company number/equipment code: Report number:

Testing instrument model testing instrument number

Magnetic particle magnetic levitation

Magnetization method of sensitivity test piece

Lift/magnetizing current spraying method

Detection standard detection rate% mm

Schematic diagram of inspection site (section) and defect location:

Magnetic particle detection and result evaluation table

Section number, defect location, defect magnetic mark size (mm), and defect property evaluation opinions.

Test results:

Inspection: Date: Approval: Date:

Note: If the evaluation table of magnetic particle test results is insufficient, additional pages can be added according to the format of the evaluation table.

* * *

Permeability test report

Company number/equipment code: Report number:

Surface condition of osmotic dosage form

Cleaner model Ambient temperature℃

Developer model reference block

The shortest penetration time and the shortest imaging time.

Detection standard detection rate% mm

Schematic diagram of inspection site and defect location:

Permeability test and fruit evaluation table

Section number, defect location, defect trace size (mm), and defect nature evaluation opinions.

Test results:

Inspection: Date: Approval: Date:

Note: If the evaluation table of penetration test results is insufficient, additional pages can be added according to the format of the evaluation table.

* * *

Acoustic emission test report

Company number/equipment code: Report number:

Test standard test pressure MPa

Detection method: Model of frequency detection instrument.

Sensor model fixed coupling agent

Number of sensors Average sensitivity DB Maximum sensitivity DB of sensors

Background noise decibel threshold decibel minimum sensitivity decibel

Gain dB Maximum distance between analog source sensors mm

The analog source distance m attenuates the signal amplitude db of measuring the number of sensors.

Sensor layout:

Load program diagram/data and positioning diagram:

Test results and evaluation:

Inspection: Date: Approval: Date:

Note: When the table space is insufficient, a separate page can be attached.

* * *

Material composition analysis report

Company number/equipment code: Report number:

Sampling method sampling location

Instrument model instrument number

Test standard analytical method □ chemistry □ spectrum

Check the site map:

order

Description of element and content of nominal material (%)

Analysis results:

Inspection: Date: Approval: Date:

Note: If the material analysis result table is insufficient, a continuation page can be added according to the format of the analysis result table.

* * *

Hardness test report

Company number/equipment code: Report number:

Measuring instrument model measuring instrument number

Heat treatment state of main materials

Test standard hardness unit

Schematic diagram of measuring point position:

Measuring point number measuring point hardness measuring point position measuring point number measuring point hardness measuring point position measuring point

Quantity measuring point hardness measuring point position

Test results:

Inspection: Date: Approval: Date:

Note: If the hardness test result table is insufficient, a continuation page can be added according to the format of the test result table.

* * *

Metallographic analysis report

Company number/equipment code: Report number:

Model of analytical instrument number of analytical instrument

Etching method and polishing method

Implement standard metallographic structure

Heat treatment state of main materials

Schematic diagram of sampling and analysis part:

Metallographic photo (indicate magnification):

Analysis results:

Inspection: Date: Approval: Date:

* * *

Inspection report of safety accessories

Company number/registration code: Report number:

Model and quantity of safety valve

Nominal pressure MPa opening pressure MPa sealing pressure MPa

Effective lead seal with nominal diameter mm

External view of inspection report installation location

Types and specifications of emergency cut-off valve.

withstand voltage test

Pressure MPa sealing test

Pressure MPa cut-off time s

Maintain external view of record installation location.

Measurement of MPa accuracy of pressure gauge range

Appearance diagram of lead seal within the validity period

The liquid level meter measures the filling quantity m3 of the container.

External error of installation position

Instrument number of bursting disc type

Installation position of blasting pressure MPa material

Observation on the validity period of temperature measuring instrument model

Quick-opening interlocking synchronous alarm is closed, and the door is opened after boosting and depressurizing.

Gas hose test pressure MPa test medium retention time min

Liquid hose test pressure MPa test medium retention time min

Inspection of other valves and accessories:

Inspection results:

Inspection: Date: Approval: Date:

* * *

Air tightness test report

Company number/registration code: Report number:

Design pressure maximum working pressure

Pressure test pressure MPa airtight test pressure MPa

Test medium temperature℃

Ambient temperature℃ volume

Compressor model safety valve model

Pressure gauge range MPa;; Precision proving ground

Test program record

Slowly raise to the test pressure: Mpa, and keep the pressure for min;;

Check the container and connecting parts for leaks and anomalies.

Actual test curve:

P

(MPa)

T (minutes)

Test results:

Inspection: Date: Approval: Date:

* * *

Additional inspection report

Company number/registration code: Report number:

Electrostatic installation inspection

Test instrument model and instrument accuracy.

The resistance ω at the junction of electrostatic resistance ω.

Inspection of vacuum degree of insulation layer

Accuracy of vacuum instrument model instrument

Vacuum pa under no load and vacuum pa under load.

The tank is evacuated and the gas is replaced.

Vacuum pump model vacuumizing time h vacuum degree pa in tank

Displacement medium displacement pressure MPa

After discharge, the pressure in the tank is MPa, and the oxygen content in the gas in the tank is ≤3%.

Determination of corrosive medium content

Name of components of medium corrosion medium

Corrosion medium content% corrosion rate mm/y corrosion mechanism

Other inspections and tests:

Test results:

Inspection: Date: Approval: Date:

* * *