Excuse me, what is the difference between building formwork and clean water formwork? Asking God for advice?

Hello! Clear water formwork is also a building formwork, but the requirements are higher. Generally speaking, using ordinary building formwork, after the concrete is formed, it needs to be demoulded. After demoulding, it needs to be plastered to achieve the effect of a clear wall, which is the "plastered wall" you see when buying a house. If you use clear water formwork, after the concrete is formed, the wall surface will be smooth and smooth, and you can directly achieve the effect of a clear water wall without plastering after demoulding. Therefore, this will impose stricter requirements on the performance of the clear water formwork and the technical requirements of the workers. The project engineering The cost will also be higher than general building formwork. But this was in the past, so there is no need to worry now. Zhongxin Green Building's super-strong composite formwork has obtained a number of national patented technologies. It uses waste recycling technology to recycle the formwork. Not only does it have higher performance than traditional formwork, but it can also directly achieve the effect of fair-faced concrete after demoulding, which is extremely convenient. The most important thing is that the unit price is lower than that of traditional formwork, but the turnover times are 10 times that of traditional formwork. According to the project project, we can first formulate a mold matching plan and then customize the production formwork specifications, which completely saves time, worry and effort. It has passed the environmental impact assessment test , a new green and environmentally friendly building material favored by the industry. Hope my answer helps you.