1. Intellectual property rights authorized in that year (including transfer in some areas) cannot participate in the high-standard evaluation in that year. Judging from the implementation of Sichuan, Shaanxi, Jiangsu and other provinces, it is a high probability event to implement the policy of "Do not participate in high evaluation of intellectual property rights in that year" in 2023.
2. Invention patents (including national defense patents), new plant varieties, national crop varieties, national new drugs, national first-class protected varieties of traditional Chinese medicine, and the exclusive right to layout design of integrated circuits are assessed as Class I, which are generally published within 18 months from the date of acceptance, and then the actual trial stage is carried out. It usually takes about 3 years to get authorization, but it does not rule out a longer time.
3. The patent for utility model and intellectual property rights mainly based on software copyright can be authorized within 7- 14 months.
4. Design patents and trademarks are not included in the consideration of high-tech enterprises.
For enterprises, if they want to declare high-tech enterprises, they need to plan their own intellectual property layout and application plan in advance to ensure that the intellectual property they use conforms to the policy and can be recognized. At the same time, we also need to pay attention to the validity period and authorization time of intellectual property rights to ensure that all intellectual property rights used are within the validity period and can play a role in time.