According to what division does the frame structure project carry out technical disclosure?

-

Engineering features: 1, general situation of the building (1), * * The building area of the teaching building is 4248m2 (2). The building height of the teaching building is 22.2m, the ground floor height is 4.5m, and the floor height is 3.6m (3). The floor tiles of the ground bathroom, the floor tiles of the bathroom, the stairwell and the stair floor are made of anti-slip and wear-resistant tiles. The indoor surface of stepped classroom is 100 thick cement brick, the overhead bottom surface is 60 thick terrazzo, the partition 1000× 1000 is 3 thick copper bar, the bathroom is 80 thick concrete tile, waterproof treatment (4), the roof is leveled with 20mm mortar, the waterproof ceiling with three felts and four oils is plastered (5), and the interior wall of indoor wall bathroom is 20. Its fangci paint 18 thickness 1: 3 lime mortar wall 2 thickness fangci paint two leveling (6), outdoor wall external wall white pink ceramic tile door frame culture stone roof pink ceramic tile (7), aluminum alloy glass door for doors and windows and its ordinary wooden door balcony door push-pull aluminum alloy window are installed by a special installation unit 2. Structural overview (1). In this project, solid bricks are built with M5 cement mortar. The strength grade is MU 10, the seismic grade framework is Grade III (2), and the seismic fortification is 7 degrees. The fire resistance of this building is Grade II (4), and it is built on the indoor ground. Indoor lawn masonry is built with mixed mortar with strength grade of MU7.5 aerated concrete block M5; 120 thick brick wall is built with M5 concrete mortar of MU7.5 brick; 180 thick brick wall is built with MU7.5 brick M5 concrete mortar; The infilled wall of reinforced concrete frame structure is built with M5 mixed mortar of MU7.5 brick. Chapter II Site Organization and Labor Force Allocation, Construction Objectives (1) and Quality Objectives-Ensure that the qualified rate of this project is 100%, the excellent rate of the project is 85%, the quality is excellent, and the lifelong responsibility system for quality is implemented. The implementation of regular inspection system (2 points). Time limit for a project-determine the project time limit for 200 calendar days (3) refer to the quota time limit for a project and the requirements of the tender, the safety construction goal-strengthen safety management and safety protection, and ensure that the frequency of monthly serious injuries and minor injuries is controlled at 1‰ (4), the civilized construction goal-maintain the pollution control and noise coordination relationship between the surrounding environment and surrounding units during the construction process, and ensure that the Zhuhai civilized construction board engineering standard (5) is met, and the service goal- 2. Construction organization and management 1. The project management organization is mainly responsible for the project site: project manager: engineer, first-level project manager, deputy project manager: engineer, first-level project manager, project chief engineer: senior engineer 3. On-site project management system According to the provisions of our company's ISO900 1:2000: 2000 quality management system document, a project management system is established according to the characteristics of this project. Measures to standardize, institutionalize and standardize the management system: Fourth, the general layout of the construction site is 1, the basis of the construction layout is (65438+ 1(2), and the original position and scale of the proposed project are reduced; (3), all construction facilities; (4), the construction situation, construction progress and resource consumption plan; (5), the facilities provided by the construction unit 2, the construction layout principle (1), the construction layout should be compact and reasonable, and the construction land should be reduced as much as possible; (2) Organize transportation reasonably, ensure smooth transportation roads on site, and minimize on-site transportation costs; (3) Try to use prefabricated construction facilities to reduce the loss of relocation and improve the installation speed of construction facilities; (4) The layout of all construction facilities shall meet the requirements of convenience, safety, fire prevention and environmental protection. 3. See the construction layout for the general layout (attached figure 1). Chapter III Construction Machinery and Equipment According to the characteristics of this project, construction and construction progress, combined with the existing machinery and equipment of our unit, the main machinery and equipment to be put into this project construction plan is as follows: 1, and the earthwork excavation is equipped with 2 excavators 10. 2. Plan to set up 1 55m tower crane boom; Used for vertical transportation of the main structure of this bidding project; 3. Set up four sets of three-car steel derricks, two sets of modern information of teaching buildings, and vertically transport masonry and painting construction materials; The fourth chapter, the overall deployment of the construction, the general situation of Anhui Province * * The construction area of the teaching building project is 4206m2. The structure type adopts six-story reinforced concrete cast-in-place frame structure. This project has a heavy workload, and the total construction period exceeds 200. The construction tasks of this project must be carefully deployed according to the characteristics of this project. Case optimization, the total construction period is set at 200 calendar years, and the key features of the project are formulated. The overall construction project is protected by the surrounding environment. Invest in technical force and choose excellent management team. The project department at the site of this project has the functions of planning, organizing, coordinating, controlling, supervising and guiding the construction of this project. 2. Ensure sufficient labor input. Ensure sufficient labor input. Our company's managers and operators are equipped with sufficient engineering construction personnel. The spacing between carpentry, steel bar, concrete and bricklayer should be reasonable and compact, so as to meet the construction needs. 3. Turnover materials should be equipped with construction machinery to ensure that the construction needs turnover materials. According to the requirements of the List of Construction Machinery and Turnover Materials, we will equip construction machinery and organize the operation of construction machinery such as tower cranes and vertical steel derrick mortar machines. Civil engineering should be coordinated with various professional projects. The material supply of the construction project should be sufficient, and the input strength, material resources and financial resources should be sufficient to ensure the quality, speed, safety and civilization of the whole project. The state management of the target stage control plan of the total construction period ensures that the state management rationalizes the construction organization, ensures that the stage plan is completed on schedule or ahead of schedule, carefully formulates the feasible total project schedule, uses the network planning technology to correspond to the monthly, ten-day and weekly construction operation plans, and connects the construction production coordination with the short-term plan, and uses the microcomputer to control the overall progress to keep a balance. Weekly scheduling, to ensure the implementation of the monthly plan, to ensure the overall goal of the project. Second, the bidding project of the teaching building construction section mainly includes the main affiliated buildings of the teaching building. According to the characteristics of this project, it is planned to plan two construction areas: the main part of a construction area, the ancillary buildings of a construction area, and the two construction areas will be constructed at the same time. The whole construction area adopts parallel running water and interchange. III. The construction process and sequence are 1. The overall construction principle follows the overall construction principle of first structural enclosure, first main decoration, first civil installation and embedding, then reserved and synchronized with civil construction. 5. Construction sequence of each stage (1), site investigation in preparation stage → establishment of plane control network → recheck of elevation and leveling points → building positioning (2), foundation construction excavation sideline → earthwork excavation → trench inspection → independent foundation, brick laying of strip foundation beam → filling (3). Main body construction survey elastic line → column reinforcement binding → beam-column formwork → column concrete → beam-slab formwork installation → beam-slab reinforcement binding → beam-slab concrete → maintenance → masonry (4), indoor decoration first shed, wall construction sequence (5), outdoor decoration main body, exterior wall construction is completed, exterior wall decoration adopts construction sequence (6), installation works are reserved and embedded → installation and debugging (7). Comprehensive inspection of cleaning and acceptance → self-inspection, error correction and repair → arrangement of completion data → indoor and outdoor cleaning → completion acceptance 4. General construction situation description 1, general construction description (1), construction survey uses level to control the axis of elevation theodolite to establish plane control network and elevation leveling points, and set control piles (2) as needed. The foundation construction adopts mechanical digging and tamping to pour commercial concrete (3), the external scaffold of the main construction adopts steel pipe scaffold, the top frame of dense mesh safety net adopts steel pipe formwork, and the wooden formwork is transported by commercial concrete pump (4). The indoor and outdoor decoration rooms are constructed by skilled construction teams with similar engineering construction experience, and the outdoor coating project is constructed by the construction team designated by Party A (5). Installation and indoor and outdoor water supply and drainage indoor installation main body construction pre-embedded iron parts reserved holes Outdoor pipeline excavation and drainage engineering Water supply engineering adopts mechanical excavation (6), roofing, bathroom, bathroom and other waterproof engineering construction qualifications and construction experience teams undertake construction to ensure construction quality 2. The construction organization is divided into (1), and the construction organization shall arrange the construction process according to the principle of overall arrangement, step by step and balanced production, and follow closely. Arrange enough construction strength. Each process section of mechanical equipment should be staggered from the construction to ensure the construction period. (2) Make preparations for the main construction of the building project in advance, and then make preparations for the decoration project. (3) Closely coordinate the connection of each working procedure. (3) Implement construction measures such as rain protection, typhoon prevention and high temperature prevention to ensure the progress of the project. (4) Pay special attention to the quality of each part, reasonably coordinate the construction of each process, organize the construction to strive for good work efficiency (5), coordinate the relationship to ensure the work sequence, continuity and coordination (6), strengthen the mechanical maintenance work on the construction site, ensure the mechanical operation and implement the construction sequence. Chapter 5: Construction preparation, construction technical preparation (1), meteorology, landform, water and cultural material resources investigation, etc. (2) Organize on-site construction personnel to be familiar with the audit of construction drawings and the preparation of technical measures, as well as the basis of construction audit. Technical personnel shall make detailed technical disclosure to all construction personnel, including the general situation of the project, construction cases, technical measures, construction points and precautions of special parts, and carry out the construction according to the design and construction drawings and standard construction cases; (3), carefully study the construction drawings, by the design institute, the construction unit, quality supervision unit, supervision unit for drawing review and filing, as the basis of construction (4), self-examination, organize all kinds of construction administrators to review, master the details of the drawings; (5) Organize professional construction teams to negotiate construction coordination with construction drawings; (6), organize the drawing review, by the design disclosure, understand the design intent and construction quality standards, accurately grasp the details of the design drawings; (7), to the team plan disclosure project construction task list, make the team clear task, quality, safety, progress, etc. ; (8) Prepare the working face: check whether the roads and horizontal transportation are unblocked, and the workplace should be cleaned; (9) Quality, specification and quantity of materials and components. Clean up and transport to the designated operation point; (10), construction machinery, debugging, maintenance, etc. Ensure the operation of construction mechanical energy (1 1), and train the builder to master new technologies and new processes: important jobs and special jobs must pass the training assessment (12), and temporary facilities shall be erected according to the construction layout. Arrange construction machines and tools, make the roads and water and electricity in the field unblocked, do a good job in all kinds of maintenance of construction machinery (13), pay special attention to the safety disclosure of construction technology, make the construction personnel participating in this project meet the technical requirements and safety standards, do a good job in mathematical construction according to reasonable technology (14), prepare the construction budget, and provide guidance for construction production (15) Strengthen the inspection of raw materials, provide raw material test reports and concrete mixture ratio reports to ensure the construction quality (16), and formulate comprehensive control measures for safe production and civilized construction according to the surrounding environmental conditions. Second, site preparation for production (1), site preparation (1), recheck the red line point with the owner, Party A and the supervision representative, and use theodolite for setting-out measurement. Set permanent coordinates and horizontal foundation piles for construction control points and horizontal mark control points of leveling, and do a good job of protection and visa of survey control points. (2) Investigate water source, water quantity, water pressure, connection point, power supply capacity, line distance and drainage direction, etc. Prepare a construction case of water and electricity for construction, arrange water and electricity, and go through the formalities of sewage drainage pipe according to the requirements of the case. (3) Make spare parts data drawings for installation works. Joint debugging needs to collect and debug instruments and tools. 2. Temporary facilities (1), laying construction drainage and sewage main pipes; (2) Laying temporary roads, temporary water supply and power supply lines; (3), set up sporadic concrete mixer mortar mixer 3, the builder to prepare (1), the company to establish a labor market to choose high-quality construction team according to the requirements of construction organization, design, construction procedures and construction progress to determine the number of labor required in each stage; (2), enter the site to make preparations, technology, safety and ideological education, education workers set up the idea of quality first, safety first, make workers abide by the safety regulations on construction safety; (3), make diligent work arrangements, do a good job in the construction of temporary facilities, enter the site to solve the problems of food, housing, medical care and work, and then enter the site to quickly put into construction to stimulate the enthusiasm of employees. Fourth, prepare the working conditions (1), make plan disclosure and technical disclosure to the team, achieve the construction task list, and make the team clear the requirements of tasks, quality, safety and progress. (2) Preparation of the working face: check whether the road is smooth for horizontal transportation, clean up the working site (3), check the quality specifications and quantity of materials and components, designate the working point (4) and the position of construction machinery, and carry out debugging and maintenance to ensure the performance and operation of construction machinery. V. Material planning 1, material management (1), and material planning: materials for ten days and weeks shall be calculated according to the construction progress plan. Component consumption plan and submit it to the material purchasing department for implementation 2 weeks in advance. Material consumption quota management: material accounting should be based on the construction quota of materials, and the implementation of consumption quota should be assessed and analyzed, with emphasis on checking the differences between the quota materials and the actual materials, improving the material management level (3), material inventory management 1), strictly checking the specifications, quantity and quality of incoming raw materials, and clarifying the responsibilities. Quantity, quality and specifications meet the requirements of procurement documents. The acceptance and warehousing procedures have just been completed. 2) The warehousing materials shall be recorded in the material account. Material certificate, certificate of approval and re-inspection report shall be numbered and marked. 3) Storage capacity should be arranged neatly. Materials should be stored in a reasonable way. Materials should be stored in a clear specification, old and new, and materials should be clearly displayed. When necessary, they should be neatly stacked and stored in warehouses and sheds. Goods should be displayed in containers (shelves) to prevent squeezing. (4) The materials for site management shall be 1. Strengthen material management. Products and qualified materials are strictly prohibited from entering the construction site. Materials shall be subject to four inspection systems: variety inspection, specification inspection, quality inspection and quantity inspection. 2) Each team should carry out quota acquisition, recording and settlement at the end of the month according to the quantities of the team, so as to implement the material plan. 2. Preparation of building materials (1), construction budget, quantity analysis, preparation of materials needed for the project according to the construction progress plan, determination of warehouses, stacking sites and transportation basis (2), application of materials according to the material demand plan, reservation of the procurement implementation plan (3), organization of materials to enter the site as planned and safekeeping (6), preparation of construction machinery and equipment (1). (2) When the mechanical equipment comes into the site, it shall be laid out according to the regulations, and the corresponding maintenance and debugging work shall be done to ensure the running energy of the construction machinery. Chapter VI Construction Progress and Principles of Construction Progress Plan The construction progress plan of this project meets the requirements of the tender documents. The principle premise of safety, high quality, high efficiency and rationality is to strive to complete the project task 2 ahead of schedule. Time limit for a project target According to the requirements of the tender documents, the total time limit for this project is 220. Our company strictly, scientifically and reasonably arranges the construction according to the construction period to ensure the realization of the target construction period. Measuring unreeling No.8 1 ~ 8 Foundation pit excavation No.20 No.9 ~ 29 Cover main structure construction No.92 No.26 ~10/8 Interior engineering and interior decoration engineering No.75 15 ~ 190 Exterior wall decoration engineering No.55135 ~. The 30th. 160~ 190 Remove the external wall grille 10 No. 185~ 195 electromechanical installation engineering number 149 No 4 1~ 190 IV. Schedule control management 1, how to guide the plan to be more operational? The project manager is responsible for formulating technology, and the technical department of the company is responsible for supervision and tracking assistance. 2. The control point target of this plan must be completed on schedule. 3. In-depth planning and implementation (1) should pay attention to several points, and the working relationship is mainly determined according to working procedures and technological processes. The working face requires that the arrangement of labor turnover materials should be simple and defined according to the working relationship. Even if the working relationship is basically adjusted, the planning network will be broken (2), and the plan will ensure the scientific rationality of the arrangement between processes and the smooth development of construction (3), and make full use of the working face to ensure the reasonable performance of the construction rhythm. Just like making all kinds of labor faces start construction independently (4), the construction will ensure the labor balance as much as possible. Five-stage plan should be prepared in advance. 5. Check and adjust each plan in the structural stage, and report to the project manager for review and implementation. 6. Submit the monthly plan to the professional builder, and control the key points for key disclosure. 7. According to the schedule, the builder of each discipline accurately calculates the demand plan of main materials and turnover materials, and submits it to the project manager for review. According to the actual balance of labor use and the demand for labor quantity, the plan is adjusted to properly solve the problems of labor workload, fullness and balanced use. 8. The planned management information shall be kept. 5. Construction progress plan crossing chart (see attached figure 2) Chapter VII Time limit for a project guarantee system ensures the quality and quantity of the project to be completed due to the short time limit. Our company plans to adopt the working mechanism of Bingtuan's combat strength, material input and construction scheme preparation, organization setting, resource allocation, construction scheme, working procedure arrangement, safe production and diligent supply. It ensures the construction period and external environment of various projects. Second, the project time limit for a project guarantee measures 1, foundation engineering 1. The poor control of the foundation project duration of this project directly affects the construction progress of the whole project. The relationship between foundation pile construction and filling construction must be well controlled to ensure that the foundation project can be completed according to the construction schedule. Equipped with enough construction machinery and check the construction machines and tools to ensure the mechanical energy operation of construction. 2. Template 1. The formwork adopts brand-new plywood, steel composite formwork and special steel formwork. Reasonably calculate the number of templates used and the number of turns. Equipped with enough templates. 2. Reasonable arrangement of templates in and out of the room and quantity, to avoid template and manufacturing process. 3. Reasonable stacking and fine maintenance during use. Regularly check qualified templates and eliminate them. 4. Use skilled carpenters to improve the template installation power and speed up the template installation and disassembly. 5. Before template installation, formulate a reasonable template support system to shorten the template installation space. 3. Be familiar with the construction drawings and do a good job of pumping water. 2. The reinforcement system will be processed on site in advance. Using tower crane to process steel bars and directly hoist the construction face to ensure the smooth installation of steel bars. Arrange the processing and stacking positions of steel bars, set the rotation radius of tower crane boom, reduce the on-site steel bar transportation and shorten the transportation site; 4. Do a good job of stacking and marking steel bars on site to avoid misuse, rework and repeated installation of steel bars. Equipped with sufficient reinforcement processing, production and installation machinery to ensure the smooth installation of reinforcement. Before installation, mark the number, model and laying line of structural reinforcement in the corresponding template position, and reasonably organize the installation order of reinforcement in each part. Steel bars are transported by tower crane, which reduces labor intensity and improves productivity. 8. Carefully check the safety process of reinforcement to ensure the safety and quality of reinforcement and avoid rework. 4. The specific project is 1. According to the strength grade of concrete used in this project, do a good job of concrete mixture ratio test in advance to guide the construction. 2. Equipped with enough concrete machinery, strengthen the inspection and maintenance of concrete construction machinery, and ensure the smooth transportation in the concrete field. 3. Reasonably arrange the overlapping relationship of concrete pouring in each construction section to avoid the same pouring and nesting workers in each section. 5. whitewash the operation project 1. Strictly select construction operators and select excellent construction teams for construction. 2. Adhere to the principle of technical disclosure, strictly monitor the quality of team construction, and avoid rework. 3. Plan and arrange our group to fully consider the construction period of each working procedure. Reasonably arrange the relationship and influence between quality and finished product protection, so as to ensure smooth and balanced painting construction and ensure the construction period requirements. 4. It is necessary to increase the investment of the construction party, speed up the construction progress, and ensure that the project can be completed and delivered in advance. 5. Construction houses that affect the main structure, such as masonry and decoration, can be interspersed as soon as possible. 6. Waterproof Engineering Chapter VIII Construction Cases and Technical Measures, Construction Survey 2. Earthwork reinforcement shall be processed and produced at the site according to the design requirements of drawings. Before the tower crane is hoisted to the construction section, be familiar with the drawings. Regardless of whether the grade, diameter, shape, size and quantity of semi-finished steel bars conform to the material card, the installation positioning line of steel bars should be corrected and supplemented, and the specification, shape, size and quantity of steel bars should be indicated at the binding position. Scrub the concrete surface with a wire brush at the construction joint position 1. The steel bar connection ensures the construction quality. In this project, electroslag pressure welding is proposed for the vertical steel bar connection in the column with a diameter of 20 mm, and binding and lap welding are proposed for the vertical steel bar connection in the column. The diameter of the reinforced bar in the beam is equal to or greater than 18 mm, and the rest of the reinforced bar with the diameter of 18mm is planned to be connected by flash welding or one-sided lap welding. The formwork project is a teaching building with a height of 4.2 meters on the first floor and a height of 3.6 meters on the second floor. Due to the high first floor, the construction difficulty of dense steel bars must be paid enough attention. The case of formwork support is only the difficulty of formwork engineering. The difficulty of this project must be determined through detailed calculation and approved by the customs declaration department. Concrete Engineering This project meets the progress requirements of this project due to the concrete consumption. All concrete in this project adopts commercial concrete. The corridor of the main part of the teaching building is running water construction. The concrete label types of this project include C 10C25C30. Before pouring, the pouring position and quantity must be clearly defined. Use a fixed concrete pump to transport the concrete to the pouring position. According to the facade and structural characteristics of this project, the traditional steel pipe scaffold is proposed for the external scaffold of this project. Scaffolding along the outer wall of the building must meet the requirements of construction progress. The second floor of the dense mesh safety net and the main entrance of the cage-falling opening of buildings with inclined baffles on every third floor are provided with safety platforms. Masonry project 0.00 The masonry of this project adopts MU 10 brick M5 mortar for masonry construction -0.06 sets -20mm 1:2 cement mortar mixed with 5% waterproof agent; damp-proof layer 0.00 masonry adopts M7.5 brick M5 mortar for masonry; VIII. Roof waterproof project The flat roof of this project adopts SBS modified waterproof asphalt roof cement mortar for leveling and slope-finding waterproof layer 20mm1:2. Nine. Windows and doors engineering The window types of this project include aluminum alloy push-pull window and hidden frame aluminum alloy window; Doors include aluminum alloy doors, plywood doors, stainless steel doors and sliding doors. The glass is 6mm white glass, except that the outer door and window are made of dark brown frame material. The green coated glass construction of the vertical glass curtain wall of the teaching building is designed, manufactured and installed by a professional company. 10. Exterior wall decoration works. The exterior wall of this project is mainly white and pink, with 95×45 tiles. According to the design requirements of the drawings, the corner decoration of the first floor, the fourth floor, the fifth floor and the roof protrusion should be decorated with waterproof agent to ensure the construction quality of the wall. 10. ground engineering polished tiles are used for the terraced classrooms in this project, and terrazzo is used for the overhead ground floor.