Where is the exit of the Yellow Crane Tower Tunnel?

The exit of the Yellow Crane Tower Tunnel is on Liu Yang Road.

The Yellow Crane Tower Tunnel is the largest single-pipe double-decker urban highway tunnel in China, located in Wuchang District, Wuhan City, with the exit at Liu Yang Road. The project was built by Wuhan Urban Construction Group and undertaken by China Railway 14th Bureau Group and Wuhan Municipal Group Consortium.

The Yellow Crane Tower Tunnel is one of the tunnels with high technical content and great difficulty in domestic construction. In the meantime, experts such as Academician Qian Qihu of China Academy of Engineering were invited to check the technical scheme on the spot, and the construction team applied automatic monitoring construction technology to monitor the settlement data in real time and adjust the tunneling parameters synchronously. The shield machine passed through Wuchang Ancient City, Beijing-Guangzhou Railway and many celebrities' former residences safely and smoothly, and was successfully received in February 2023. In the process of construction, innovative technologies were explored and summarized, and 3 invention patents and 2 utility model patents were declared.

The Yellow Crane Tower Tunnel is a part of the south extension project of Heping Avenue.

The south extension project of Heping Avenue is located in Wuchang District, Wuhan. It is the control project of Wuchang Shunjiang Passage, which starts from Heping Avenue in the north and ends at Zhangzhidong Road in the south. The total length of the line is 3042.5 meters, and the design speed is 60 km/h. The project is constructed in the form of "ground+tunnel", in which the Yellow Crane Tower tunnel is 2 190 meters long, and the shield section is excavated by Mir shield machine, with the excavation diameter of 16.03 meters and single pipe and double layers. The upper lane of the tunnel is from Jiyuqiao to Zhangzhidong Road, and the lower lane is from Zhangzhidong Road to Jiyuqiao. There are three lanes on each floor.

The south extension project of Heping Avenue was completed and opened to traffic, marking the opening of the "broken road" for many years. In the past, vehicles had to bypass Linjiang Avenue from Jiyuqiao to Zhangzhidong Road, and the whole journey took more than 20 minutes. Now it takes only 3 minutes to get there directly, which will effectively relieve the traffic pressure from Zhongshan Road to Baishazhou Avenue, form a backbone traffic channel along the Yangtze River in Wuchang, continue to connect Baishazhou area to the south, and then connect with Wuhan's "South Gate" to realize rapid exit from the city and contribute to Wuhan's urban development.

The above contents refer to Baidu Encyclopedia-Yellow Crane Tower Tunnel.