Legal analysis: Approval opinion of the professional supervision engineer: After review, the special construction plan is comprehensive in content, the method is reasonable, targeted and operable, and the quality, safety and other assurance measures are complete, and it is agreed to be submitted for approval.
Special construction plan review process: The construction unit prepares a special construction plan in accordance with regulations; the construction unit submits a construction plan review form, and if expert argumentation is required, expert argumentation opinions should be attached; professional supervision engineers review and sign opinions (If it does not meet the requirements, repeat the above procedure after modification); the chief supervising engineer will review and sign the opinion; the construction unit will sign the opinion
Legal basis: "Patent Law Implementing Rules" Article 42 One patent application If it includes two or more inventions, utility models or designs, the applicant may file a divisional application with the Patent Administration Department of the State Council before the expiration of the time limit specified in Paragraph 1 of Article 54 of these Rules; however, the patent application has been rejected , withdrawn or deemed withdrawn, no divisional application can be made.