Xie Chaoyang's award-winning situation

1, 1986, flow-limiting fracturing completion technology, first prize of provincial (Ministry) scientific and technological progress, fourth place.

2. 1988, Application of limited flow fracturing in thin oil layers, first prize of national scientific and technological progress, fourth place.

3. 1989, fracturing completion technology with thin interlayer balanced current limiting method, first prize of municipal (bureau) level scientific and technological progress, first place.

4. 1998 applied system engineering method to improve the system management level of oil production engineering in Daqing Oilfield, and won the second prize of provincial (ministerial) management achievement award, ranking fifth.

5. In 2002, Supporting Technologies for Cleaning and Scaling Prevention of Oil and Water Wells in Daqing Peripheral Oilfield won the first prize of scientific and technological progress at the municipal (bureau) level, ranking sixth.

6. In 2004, Xujiaweizi Deep Natural Gas Conversion Technology won the first prize of provincial (ministerial) level technological innovation award, ranking ninth.

7. In 2004, the supporting technology of thin interbed subdivision water injection technology in Daqing Oilfield won the first prize of provincial (ministerial) level technical innovation award, ranking fourth.

8. In 2006, Hailaer won the first prize of provincial (ministerial) level technical innovation award and the third place in the research of stimulation technology for complex lithologic reservoirs.

9. In 2006, the application research of high-efficiency three-phase separator in Hulunbeier Oilfield in crude oil dehydration won the first prize of scientific and technological progress at the municipal (bureau) level and won the first place;

10. In 2007, fracturing stimulation technology for metamorphic rock reservoir of Hailaer volcano won the first prize of provincial (ministerial) scientific and technological progress and won the first place;

11.In 2003, the wax removal and viscosity reducer obtained the national invention patent with the patent number of ZL 03106503.6438+0;

12, 2005, fracturing fluid for tuff-bearing reservoir won the national invention patent with the patent number of 2005 10009727.7.