Commitment letter of traffic accident responsibility

Commitment letter of traffic accident responsibility

In life, there are more and more things that need to use the letter of commitment. A letter of commitment is usually a contract that needs to be written, and its commitment must also be written. Come and refer to the commitment letter you need! The following is my collection of traffic accident responsibility commitments, hoping to help you.

Commitment letter of traffic accident responsibility1commitment letter of LED lamps after-sales service

The led lamps provided by our company are all produced by our company, and we provide after-sales service guarantee (spare parts supply and technical support guarantee). The company's after-sales service department has professionally trained technicians to provide 24-hour response service. Under the double guarantee of manpower and material resources. Our company will provide the following free services (except man-made damage):

(a) to provide free on-site maintenance services during the warranty period according to the manufacturer's warranty regulations;

(2) Provide replacement and maintenance services for led lamps that fail during the warranty period free of charge;

(3) Providing pre-sales and after-sales technical consultation free of charge;

(4) Provide regular tracking and maintenance free of charge;

The specific services are as follows:

I. Warranty of led lamps:

According to the warranty period of our company, we will provide free warranty for the whole lamp within two years.

Second, the mode of transportation.

After the product is purchased, our company will first contact the specific person in charge of the user to confirm the delivery time and requirements; Secondly, within the specified time, the products will be delivered to your company as agreed by both parties;

3. The products provided shall be guaranteed to have outer packaging, and the appearance of the packaging shall be undamaged and unopened; Fourth, after the goods arrive at your company to confirm that the model and quantity are correct with the contract, install and debug them; Fifth, the product packaging and all product accessories are owned by your company and handled by yourself;

Sixth, when the products are delivered to your company for unpacking acceptance, if there are defects, spare parts, random tools, accessories and the products themselves are damaged, our company will be responsible.

Third, delivery time.

After signing the purchase contract, our company will contact the specific person in charge of your company to confirm the delivery time and requirements, and deliver the goods within the working days stipulated in the contract.

Due to natural disasters such as floods and fires, and irresistible factors such as delayed supply by manufacturers, the production in the contract is caused.

If all or part of the goods cannot be delivered on time, our company will inform you in writing and by telephone within three days, and provide the exemption certificate. After obtaining the consent, we will clearly put forward the solution and delivery time.

Four. Installation and commissioning services

Our company has a 24-hour after-sales hotline for consultation. When your company appoints technicians for installation. You can consult our technicians through the after-sales hotline, and we will patiently communicate with you for any problems that may arise during the installation process, so as to carry out the independent installation process in the future.

Five, led lamps and lanterns free warranty period (except man-made damage)

Free warranty during the two-year warranty period.

That is, within two years (inclusive) from the factory date of the product (subject to the official shipment date, hereinafter referred to as the "shipment date"), if the purchased product is dead or the light is not on, etc. Our company will carry out maintenance for free.

The response time of product fault service during the warranty period of intransitive verb

1).24-hour service hotline:

The technical service department of our company has a 24-hour service telephone number: you can call the business manager's mobile phone directly without rest on holidays.

2).30 minutes telephone reply:

After the quality problem is called, our engineers will contact the person in charge of your company within 30 minutes to understand the fault phenomenon, determine the maintenance items and propose solutions.

3).7 days *24 hours working system

Our company's technical service telephone hours: Monday to Sunday, 24 hours, holidays as usual. The technical consultation service hours are normal business hours: Monday to Sunday, 8: 00- 18: 00.

Seven, fault repair time limit

Letter of Commitment on Traffic Accident Responsibility 2 In order to ensure the personal and property safety of myself and others and avoid causing losses to the unit, I voluntarily promise and abide by the following terms:

1. Earnestly study and consciously abide by the Road Traffic Safety Law of the People's Republic of China and related implementation rules, strictly implement the vehicle safety management rules and regulations of local traffic safety management departments and units, and adhere to the professional behaviors of "civilized driving, safety first" and "stopping for three minutes without grabbing a second";

2. Actively participate in the safety education organized by the unit, and accept the regular safety knowledge, driving skills and mechanical common sense examinations of the unit;

3. Carefully maintain the vehicles you are driving, strictly implement the "three-inspection system" of vehicles, keep the technical conditions of vehicles intact, and operate vehicles in strict accordance with regulations to prevent the occurrence of vehicle mechanical accidents;

4. Because of the following traffic accidents, I voluntarily accept the relevant penalties of traffic management departments and units:

(1), drunk driving, fatigue driving, violation of prohibition signs, speeding, and brutal driving;

(2), illegal and line, not according to the provisions of comity, not according to the provisions of reversing, turning around.

(3) Vehicles, non-motor vehicles and pedestrians do not slow down or give priority to avoidance at intersections;

(4) driving with an invalid driver's license or driving a vehicle that does not conform to the driver's license, driving a motor vehicle during the period when the driver's license is suspended, and driving an invalid motor vehicle;

(five) after causing a traffic accident, leave the scene of the accident or escape;

(six) after the traffic accident, failing to report to the unit leaders, safety management departments and insurance companies according to the regulations;

(7) Giving the vehicle to a non-driver or other driver for use without the approval of the unit leader;

(8), other serious violations.

Commitment (signature): xxx

Manager (signature): xxx

Date: xxx

Traffic accident liability commitment letter 3 legal person commitment letter

Our unit strictly follows the Regulations of the State Council on the Administration of Precursor Chemicals, the Measures of the Ministry of Public Security on the Administration of the Purchase, Sale and Transportation of Precursor Chemicals and relevant laws and regulations to ensure the authenticity and legality of all materials submitted by our unit. Ensure that all precursor chemicals are used for legal purposes, and under no circumstances shall they be used for illegal production of illegal products, diverted for other purposes or transferred to other units or individuals without permission; And strengthen the management of precursor chemicals, improve the internal management system of enterprises, implement the management of special personnel, and prevent precursor chemicals from flowing into illegal channels; Consciously accept supervision and management. If there is any violation of the above commitments, our unit (and myself) will voluntarily accept the punishment.

Signature of legal representative: (seal of unit)

date month year

Commitment letter of traffic accident responsibility 4 Commitment letter of participation in training

I agree to participate in the special (level) training of electronic assembly (type of work) in "Dongguan Wan Xin Talent Training Project". I have carefully read and understood the following terms of commitment:

One, only enjoy a government subsidy training;

Two, do not repeat the same skill level training, such as training arrangements are not reported, not to participate in training within two years. In order to cooperate with enterprises to do a good job in training and effectively improve their own skills, I hereby make the following commitments:

First, carefully choose the training type that suits you.

Second, during the training period, abide by the rules and regulations of the training institutions and observe the classroom discipline, according to

Attendance requirements are as follows:

1. If you take leave due to illness or business, you should show your leave slip to the training institution. If you don't ask for leave, you will be treated as absenteeism.

2. Those who arrive late or leave early for a total of 4 times will be treated as absenteeism 1 day;

3. Those who are absent from class for more than13 of the total class hours during the training period will be expelled from school and may not participate in government-funded training for two years.

Signature of participants:

20xx May 5th

Traffic accident responsibility commitment letter 5 In order to standardize the operation behavior of construction employees in the construction process, eliminate unsafe factors, control the occurrence of accidental injuries, ensure their own safety and decoration safety, and ensure the smooth progress of construction production, the company has compiled the precautions and specification requirements for various operation activities in the construction process according to the requirements of national laws, regulations and industry standards. I hope all decoration personnel will study hard and take them seriously. Details are as follows:

1, consciously abide by the safety construction laws and regulations and the company's various safety management systems, measures, regulations and procedures, and obey the management and arrangement.

2, standardize the construction operation and homework, to ensure that does not violate the rules and regulations, labor discipline, refused to illegal command, civilized and safe construction. Don't smoke, drink, fight or do anything illegal during work. 3, according to the engineering department's construction safety requirements, in strict accordance with the construction safety technical content for homework and operation, to ensure that no adventure foolhardy, not barbaric operation. At the same time, it also urges others to carry out construction operations in accordance with requirements, specifications and regulations.

4, consciously maintain the site management, do not use the site fire equipment, special mechanical equipment, electrical equipment, do show certificates, do not touch without a license, do not pull the power supply, do not use naked flame without authorization, do not string posts without authorization, and do not dismantle any protective facilities on the construction site without authorization.

5, workers must fasten your seat belt when climbing and aerial work, must wear non-slip shoes, dress flexibly.

6, special type of work related certificates, special operations to wear the corresponding labor safety protection articles.

7. Strengthen safety awareness, put an end to all potential safety hazards, and supervise each other during construction. Once the company verifies the illegal operation, it will give some rewards.

8. Our company will not take any responsibility for all kinds of safety accidents caused by barbaric construction, illegal operation, illegal command, violation of labor discipline, violation of laws and regulations and the above terms. At the same time, for the teams and individuals who caused the accident, if the circumstances are minor and fail to affect the normal construction, our company will give a warning or a fine depending on the seriousness of the case; Our company will investigate the criminal responsibility of the units and individuals that have a significant negative impact on our company due to major accidents or make our company unable to carry out normal construction according to relevant national laws and regulations.

Decoration workers should seriously study the above contents, ensure that the construction operation is standardized in strict accordance with the terms and conditions, and make the following commitments:

1. During my work in Panshi Decoration Design Co., Ltd., I promised to engage in construction work in strict accordance with the decoration construction process and operating procedures, and strictly abide by various rules and regulations related to safe construction.

2. During the commitment period, if I violate the operation process and the company's relevant safety construction system, causing injuries to myself or others, I am willing to bear direct economic losses and compensation responsibilities in proportion.

3. If the injured person fails to declare claims to the insurance department due to violation of regulations, all medical expenses shall be borne by the parties involved in the accident and bear the consequences.

4. If the insurance company refuses to pay compensation because the injured person provides false certificates or materials, all hospitalization expenses and consequences shall be borne by the injured person.

5. Proportion of the person directly responsible for accident losses: the person directly responsible shall bear 90% of all losses (including medical expenses, nursing expenses and transportation expenses).

6. I am willing to be the person in charge of fire control during the renovation, strictly abide by the fire laws and regulations, take effective preventive measures, and bear all the consequences caused by the disaster caused by the renovation.

Commitment:

ID number:

Date:

Traffic accident responsibility commitment letter 6 exemption certificate

China Pacific Property Insurance Co., Ltd. Shanxi Branch (branch):

Our company (unit) suffered accidental injury due to an accident on, and lost RMB * * *. Our company has insured it, with the policy number and the insurance period every year. Our company promises to get the above-mentioned insurance compensation of rmb Yuan only. After that, your company will no longer bear any other economic or legal responsibilities related to this accident, and we agree to waive any claim for other benefits related to this accident under this contract. And make the following commitments:

1. Your company has nothing to do with any problems arising from this accident in the future;

2. Our company will not claim any rights from your company in the future, including not bringing a lawsuit.

Litigation, and shall not do anything that damages or affects the image or interests of your company;

3. Our company guarantees that after receiving the compensation from this insurance, neither party in this accident will

We have to lodge a claim with your company again on this matter. If any beneficiary of this case has any legal dispute with your company on this matter, our company will bear all legal responsibilities and consequences, which has nothing to do with your company.

4. The signing of this guarantee does not directly or indirectly mean your company's recognition of our company.

There is fault or legal responsibility;

If our company violates this guarantee, you have the right to ask our company to return all expenses and

Compensation for other losses;

Signature: (official seal)

date month year

7 Taolin Police Station Traffic Accident Responsibility Commitment Letter:

Harmonious, smooth, civilized and orderly road traffic environment is indispensable in our life. Building a civilized and harmonious traffic, each of our drivers shoulders an unshirkable responsibility.

Here, I solemnly promise:

1. Consciously and strictly abide by the Law of the People's Republic of China on Road Traffic Safety and the Regulations for the Implementation of the Law of the People's Republic of China on Road Traffic Safety;

Second, consciously resist dangerous driving behavior, and resolutely refrain from drunk driving, speeding, fatigue driving, forcibly overtaking, overloading and overcrowding;

Third, care for the environment, don't throw debris outside the car when driving, don't spit out the window, litter, cigarette butts and peels;

Fourth, drive safely, so that when driving, fasten your seat belt, don't answer the phone, don't smoke, don't whistle, don't turn around according to the double yellow solid line, and don't stop and circle;

Five, civilized driving, so that motor vehicles do not change lanes at will, occupy emergency lanes, civilized and correct use of lights, courtesy of zebra crossings, orderly queuing, orderly parking, not running red lights.

Six, the vehicle starts on time, and shall not be deliberately stranded at the station because of the large number of passengers; Don't be overstaffed.

Seven, improve the safe driving skills. Regularly study traffic safety laws and regulations, actively participate in safety education carried out by public security, traffic and government, consciously accept safety training and study, and consciously obey the management of traffic assistants.

Starting from me, starting from now, starting from the small things around us, demonstrating civilized travel, being responsible for yourself, family and society, * * * will create and maintain a safe, smooth and orderly civilized traffic environment.

Commitment: xxx

Date: XX, XX, XX, XX

Traffic accident responsibility commitment letter 8 computer after-sales service commitment letter template

The complete set of equipment provided by our company adopts formal supply channels, and the factory provides after-sales service guarantee (spare parts supply and technical support guarantee). The company's after-sales service department has professionally trained technicians to provide 2-hour on-site response service (emergency response if necessary). Under the double guarantee of manpower and material resources. Our company will provide the following free services (except man-made losses):

(a) to provide free on-site maintenance services during the warranty period according to the manufacturer's warranty regulations;

(2) Provide spare machines for equipment that fails during the warranty period free of charge;

(3) Providing pre-sale and after-sale technical consultation and user training free of charge;

(4) Free delivery;

(5) Provide regular tracking and maintenance free of charge;

The specific services are as follows:

A, the whole machine, main parts, consumables and wearing parts warranty:

According to the national "Three Guarantees Service Policy" and the manufacturer's regulations, provide the whole machine warranty, major parts warranty, consumables and wearing parts warranty. See the product warranty card for details.

Second, the mode of transportation.

After the product is purchased, our company will first contact the specific person in charge of the user to confirm the delivery time and requirements; Secondly, within the specified time, our company will provide transportation and send professional engineers to deliver the products to users; 3. The products provided are guaranteed to be in the original packaging, and the packaging appearance is undamaged and unopened; Four, after the goods arrive at the user unit, confirm the model, quantity and contract, before installation and debugging; Fifth, the product packaging and all product accessories are owned by the user and handled by themselves;

Six, product delivery unit unpacking acceptance, such as defects, spare parts, random tools,

Our company is responsible for the damage of accessories and products themselves.

Third, delivery time.

After signing the purchase contract, our company will contact the specific person in charge of the user unit to confirm the delivery time and requirements. If there are no special circumstances, the goods will be delivered within 7 working days.

If all or part of the contract products cannot be delivered on schedule due to natural disasters such as floods and fires and irresistible factors such as supplier's delivery delay, our company will notify the user unit in writing and by telephone within three days, provide the exemption certificate, and clearly put forward the solution and delivery time after obtaining the consent.

Four. Installation and commissioning services

After signing the contract with the user unit, our company will appoint technicians to install at the time and place specified by the user unit. And patiently communicate with users about possible problems in the installation process, so as to carry out independent installation process in the future.

The machine can run normally after installation, and our technicians will optimize the performance and debug the stability of the machine to determine whether the quality of the machine can meet the requirements and demands of users. When debugging, our technicians must patiently explain and guide users to ensure that users can basically understand the operating knowledge of normal operation of the machine and the basic debugging of stable operation of the machine.

Verb (short for verb) Time limit for completion

Our company promises to complete the project within the time limit for signing the formal contract. If there are no special circumstances and instructions, it is usually within 7 days after delivery.

Six, the whole machine free replacement period

The manufacturers of the products subject to this tender will provide "three guarantees" services to the user units in accordance with the contents and scope of the provisions on the responsibility for the repair, replacement and return of microcomputer products promulgated by the relevant state departments. The specific rules are as follows:

1, free return within seven days.

That is, within 7 days (inclusive) from the factory date of the product (subject to the official purchase invoice date, hereinafter referred to as the "purchase date"), if the purchased product has performance failures listed in the "Three Guarantees Regulations for Microcomputer", you can choose to return it, exchange it or repair it. such as

If the user chooses to return the whole machine, our company will refund the purchase price at one time (subject to the official purchase invoice price, the same below).

2, eight to fifteen days free replacement or repair.

That is, from the 8th day to15th day (inclusive) from the date of purchase, if the purchased products have performance failures listed in the Three Guarantees Regulations for Microcomputer, you can choose to exchange or repair them. If you choose to replace the whole machine, our company will replace the goods with the same model and specifications or the new goods with the same brand performance not lower than the original goods for free.

3. The whole machine can't be used normally after being repaired for more than two times in one year, and it will be replaced free of charge.

That is, within one year (inclusive) from the date of purchase, if the purchased product fails to work normally after two repairs, you can choose to replace the whole machine or repair the faulty parts. If the whole machine is replaced, the service organization recognized by the manufacturer will replace the goods with the same model and specifications or the new goods with the same brand whose performance is not lower than that of the original goods for users free of charge according to the maintenance records provided by the recognized maintenance organization designated by the manufacturer.

Seven. Response time of product failure service during warranty period

1).24-hour service hotline:

In addition to the service hotline provided by the manufacturer and the technical service website on the World Wide Web, the technical service department of our company also has a 24-hour service telephone.

Number: xxxxxxxx, or you can call the business manager's mobile phone directly, without rest on holidays.

2).30 minutes telephone reply:

After calling for fault maintenance, our engineer will contact the user by phone within 30 minutes to understand the fault phenomenon, determine the maintenance items and propose solutions. If it is a software failure, solve the problem by phone. If it is found that it is a hardware problem after analysis, it will make an appointment with the user and send an engineer to repair it at home within the specified time.

3).7 days *24 hours working system

Our company's technical service telephone hours: Monday to Sunday, 24 hours, holidays as usual. The technical consultation service hours are normal business hours: Monday to Sunday, 8: 00- 18: 00.

Eight. On-site service time

After receiving the repair request from the user unit, the engineer of the technical service department of our company will get in touch with the user within 30 minutes, confirm the fault phenomenon, and send the engineer to the door within the door-to-door service time. The door-to-door service hours of technical service department are Monday to Sunday, 8: 00- 18: 00, and holidays are as usual.

Nine, fault repair time limit

If the products provided by our company fail during the warranty period, our company will ensure that professionals will be sent to the site within 1 hour to solve non-equipment failures or general failures in time. For equipment failure, on the one hand, we will try to avoid single point failure when designing the system; On the other hand, we will use the spare parts library of the company's technical service department to ensure that the fault can be eliminated within 24 hours. If it cannot be eliminated, in order not to affect users' work, we will provide similar available equipment for users to use for free until the equipment is repaired. General faults should be repaired within 24 hours.

X. Time limit for providing spare equipment

If the products provided by our company fail during the warranty period, our company promises to send professionals to the site within 2 hours to solve non-equipment failures or general failures in time. For spare parts warehouse with technical service department, ensure that the fault is eliminated within 24 hours. If it cannot be eliminated, in order not to affect users' work, we will provide similar available equipment for users to use for free until the equipment is repaired. Equipment failure, on the one hand, we try to avoid a single point of failure in system design, on the other hand, we will use the spare parts library of the company's technical service department to ensure that the failure can be eliminated within 24 hours. If it cannot be ruled out, in order not to affect the user's work, we will provide similar available equipment to the user unit for free replacement until the equipment is repaired.

XI。 others

Detailed product warranty period and detailed rules shall be subject to the warranty card provided by the manufacturer.

Letter of Commitment on Traffic Accident Liability 9 As a mixing station is planned to be built at 6 meters++on the roadside, in order to ensure the traffic safety and smoothness of the road, our unit promises to strictly follow the requirements of the Road Traffic Safety Law and the Regulations on the Administration of Municipal Facilities to ensure that the negative impact caused by traffic and the life safety of passers-by are reduced during construction and transportation. Ensure that it is implemented in accordance with the following regulations and requirements:

(1) During the construction period, 5km speed limit signs and other identification signs with construction vehicle traffic signs shall be set on both sides of 20m road before and after the intersection.

(2) Warning lights should be set at intersections during construction at night, and reflective materials should be used for identification signs.

(3) At the entrance and exit of construction vehicles, safety guides should be sent and reflective vests should be worn.

(4) Temporary safety identification signs shall be taken back to the warehouse after work.

(5) Implement in strict accordance with the approved scheme. Under the premise of not affecting traffic and pedestrians, it should be set at the approved location.

(6) Set up obvious traffic signs at intersections to guide vehicles to channelize and divert.

At the same time, in order to ensure the correct construction and driving, two traffic controllers with traffic management knowledge are set up in each closed construction area to keep on duty, maintain traffic order and driving safety, ensure the normal operation of construction and prevent traffic accidents. Traffic guides direct the traffic in the construction area in shifts all day, and wear reflective vests, armbands, command flags and walkie-talkies as required during working hours.

(7) Strengthen communication with all parties and actively cooperate with traffic management and environmental protection.

(8) Establish a direct channel to contact the traffic police department, timely feedback the traffic conditions at the scene, invite the traffic police to be present to assist in the command when necessary during rush hours, and invite the traffic police to be present to direct the diversion according to the emergency plan when there is a serious traffic jam or emergency.

(9) Warning lights shall be set at night on roads and sidewalks within the construction scope to ensure the traffic safety of vehicles and pedestrians.

(10) equip, erect and maintain all necessary and appropriate signs around the project site to provide safety and convenience for other construction and driving. During the night construction, a sufficient number of distinctive and standardized safety facilities will be added to meet the night traffic.

(1 1) Set up safety signs: All signs shall be made of materials approved by the traffic police department and the supervisor. Signs include: warning and danger signs, safety and control signs, indicating signs and standard road signs.

(12) Bulk materials shall be transported in strict accordance with the relevant documents of the municipal government, and the objects shall be covered. It is forbidden to throw materials to pollute the road surface and affect traffic.

(13) Our company consciously accepts the supervision and inspection of the municipal administration department, the public security traffic management department and the comprehensive law enforcement department of urban management. If there is any violation, the law enforcement department shall promptly correct and punish it according to relevant laws and regulations. If traffic personnel, vehicles and other property losses are caused by improper protective measures or inadequate management responsibilities, our company promises to be liable for compensation according to law.

Hereby promise!

Traffic accident responsibility commitment letter 10 commitment letter

Installation quality is very important to system equipment, and improper installation may easily lead to equipment failure or equipment operation.

Abnormal and unqualified installation will threaten the safety of equipment, and in the case of equipment problems, it will lead to abnormal functions of other equipment. The reliability of air conditioning equipment largely depends on the installation quality. There are many hidden dangers in unqualified installation, such as water leakage, alarm and so on. We hereby solemnly recommend that customers install equipment by us.

Apc-mge company's series of products, and fully understand the possible problems and damage caused by improper installation, but still decided to start from

Line installation, only apc-mge is responsible for equipment debugging and startup. The running situation of equipment when apc-mge is started can't fully reflect the hidden dangers that may exist in the process of equipment installation. In these cases, if the machine runs abnormally or fails to function due to installation, the warranty period of the equipment will be terminated immediately on the day when such abnormal operation or failure occurs. In addition, the installer of the equipment shall bear all the responsibilities and losses of equipment damage and other related problems caused by this installation, and apc-mge does not need to bear any responsibilities.

The undersigned has realized the importance of the above matters, and agreed that in the future, if the system is found to be damaged or faulty due to improper installation, he is willing to take full responsibility and will not pursue it with apc-mge.

Company (official seal)

Date: June 30th, 20xx

Traffic accident responsibility commitment letter 1 1 labor contract exemption commitment letter

1. Because I signed a fake labor contract.

2. I participate in social insurance and pay various social insurance premiums by myself.

If I have an industrial accident, I am responsible for it myself, because I don't actually work in our company.

I voluntarily give up all the rights stipulated in the labor law.

symbol

Traffic accident responsibility commitment letter 12 traffic accident responsibility commitment letter

Because I rode my bike carelessly, I knocked down an old man living in Hunan at night. That night, the hospital checked that there was hemorrhagic contusion of limb soft tissue, but there was no limb fracture and brain injury bleeding. According to the opinion of the emergency doctor in the hospital, there is the possibility of brain injury within three months. To this end, I promise: within three months, if the elderly have secondary brain injury related to this traffic accident (it needs to be diagnosed by a hospital above Grade A). I am willing to bear all the financial responsibility for this accident.

Commitment:

ID number:

20xx June Day for the Elderly