Chapter I General Provisions Article 1 In order to strengthen the energy-saving management of civil buildings, advocate and promote the development of green buildings, and improve the level of ecological civilization construction, these Regulations are formulated in accordance with the provisions of the Energy Conservation Law of People's Republic of China (PRC), the Renewable Energy Law of People's Republic of China (PRC), the Civil Building Energy Conservation Regulations and other laws and regulations, combined with the actual situation of this province. Second civil building energy conservation and related supervision and management activities within the administrative area of this province shall abide by these regulations. Article 3 Energy conservation of civil buildings shall follow the principles of adjusting measures to local conditions, making overall plans, being scientific and reasonable, being economical and applicable, and being safe and reliable. Article 4 The people's governments at or above the county level shall strengthen the leadership over the energy-saving work of civil buildings, improve the energy-saving system and mechanism of civil buildings, and incorporate the energy-saving work of civil buildings into the national economic and social development plan. Fifth people's governments at or above the county level housing and urban and rural construction administrative departments responsible for the supervision and management of civil building energy conservation within their respective administrative areas; Other departments of the people's governments at or above the county level shall, in accordance with the division of responsibilities, do a good job in civil building energy conservation. Article 6 The administrative department of housing and urban-rural construction and the development and reform department of the provincial people's government shall formulate a catalogue of the promotion, restriction and prohibition of the use of energy-saving technologies, processes, materials and equipment for civil buildings, and make it public. Article 7 Encourage the research and development of energy-saving science and technology in civil buildings, popularize new technologies, new processes, new materials and new equipment for energy-saving in civil buildings, and promote the application of renewable energy in buildings; Encourage rural individuals to take energy-saving measures when building houses. Article 8 Encourage the development of prefabrication and assembly technology of construction projects, improve the integration level of building industrialization technology, support the construction of building industrialization bases integrating R&D, design, production and construction, and promote building industrialization. Article 9 People's governments at all levels shall strengthen publicity and education on energy conservation in civil buildings, popularize knowledge of energy conservation in civil buildings, and enhance the awareness of energy conservation among the whole people. Chapter II Energy Efficiency of New Buildings Article 10 The people's governments at or above the county level shall, according to the local economic and social development level, geographical and climatic conditions and other actual conditions, make overall consideration of low-energy heating methods in winter, which mainly focus on clean energy and waste heat utilization, and concentrate on promoting them in new district construction, large residential areas and other construction projects. Eleventh construction projects with renewable energy utilization conditions, the construction unit should choose suitable renewable energy for building heating, refrigeration, lighting and hot water supply. Renewable energy utilization facilities shall be designed, constructed and accepted simultaneously with the main building project. Article 12 The construction unit shall implement the mandatory standards for civil building energy conservation, specify the technical requirements for building energy conservation in the design and construction contracts, provide the construction drawing design documents that have passed the examination to the construction unit and supervision unit, publicize the adopted energy-saving technologies and measures at the construction site, and organize the acceptance according to the quality standards for building energy conservation projects. Article 13 The design scheme of a construction project prepared by a design unit shall include a special description of energy-saving design of civil buildings, the preliminary design document shall include a special article on energy-saving design of civil buildings, and the construction drawing design document shall include a description of energy-saving design and energy-saving calculation of civil buildings. Fourteenth construction drawing design documents review institutions shall review the construction drawing design documents in accordance with the mandatory standards for civil building energy conservation. Fifteenth construction units shall carry out construction in accordance with the standards and specifications and the construction drawings and design documents that have passed the examination, and formulate a special construction plan for building energy-saving projects, which shall be implemented after being signed by the project leader of the construction unit and the project leader of the supervision unit.
The construction unit shall, in accordance with the design requirements, construction technical standards and the contract, conduct on-site acceptance of building energy-saving materials, products and equipment entering the construction site, and the on-site acceptance data shall be included in the engineering technical files.
Encourage construction units to carry out construction according to green construction standards and take effective measures to reduce construction energy consumption. Sixteenth supervision units shall carry out supervision in accordance with standards, norms and construction drawings and design documents that have passed the examination. The supervision engineer shall not sign an agreement with the building energy-saving materials and equipment that have not been re-examined or failed to pass the re-examination. Seventeenth construction engineering quality supervision institutions shall incorporate the supervision content of civil building energy-saving projects into the project quality supervision work plan, and supervise, inspect and assess the quality of building energy-saving projects according to law; The project quality supervision report shall include a special article on civil building energy conservation. Eighteenth institutions engaged in building energy-saving materials testing, engineering testing, energy efficiency evaluation, should be strictly in accordance with the standards and norms for testing, evaluation, and shall not issue false reports. Chapter III Energy-saving Renovation of Existing Buildings Article 19 The administrative department of housing and urban and rural construction of the people's government at or above the county level shall, according to the requirements of the state and the special planning of building energy conservation in this province, formulate an energy-saving renovation plan for existing buildings, and report it to the people's government at the same level for approval before implementation.
* * * institutions existing building energy-saving renovation, by the people's governments at or above the county level administrative organs affairs institutions in conjunction with the relevant departments to make plans, and organize their implementation. The energy-saving renovation plan of existing buildings of public institutions shall be connected with the energy-saving renovation plan of existing buildings approved by the people's government at the same level. Twentieth existing buildings to carry out envelope decoration and energy system renewal, should be synchronized with the implementation of building energy-saving transformation. Twenty-first state organs existing office buildings energy-saving renovation costs should be included in the financial budget of the people's governments at or above the county level.
The cost of energy-saving renovation of public buildings used by residential buildings and public welfare undertakings such as education, science, culture, health and sports shall be shared by the government and the building owners.
The cost of energy-saving renovation of commercial existing public buildings shall be borne by the building owner and user through agreement.