1. Model essay on project summary report
I have been in the company for almost five years. After I came to the fourth company, I made great progress in xx with the strong leadership and care support of the company leaders. In the process of work, I successfully completed the annual work target of xx. First, do your job well.
Adhere to the tasks assigned by the leaders in the xx project in Sichuan, and try to satisfy the leaders; Abide by rules and discipline, obey management and do a good job in the measurement process; Be responsible to the surveyor. Familiar with design drawings and construction drawings, strictly implement measurement technology and operation process; Carry out measurement according to the specified measurement accuracy to ensure the accuracy and accuracy of measurement data; Check the measurement results after measurement; Make measurement records, regularly check the measurement control points to ensure the measurement data is correct; Maintenance of measuring instruments after measurement: periodic self-inspection and self-calibration of measuring instruments; In the process of construction, report the problems found in time; There are no major mistakes in my own measurement work.
In the xx5 standard project, the temporary technicians are responsible for carefully completing the work arranged by the leaders, being conscientious and not afraid of hard work; Because I study all kinds of construction techniques seriously at ordinary times, I have been working in the front line of the construction team in the reconstruction of Tiefu Expressway in Expo Park Road, and I know the operation of the construction site very well, so it is convenient to be responsible for the on-site technology. In the process of construction, earnestly fulfill the specification requirements, and seriously find and solve quality problems. The project quality and progress were successfully completed.
Second, consciously strengthen theoretical study, strive to improve political and ideological quality, and be proactive.
1. To strengthen theoretical study, we must first attach importance to it ideologically. In the past period of time, I have been able to strengthen the study of political theory, seriously study party constitution, study Marxism-Leninism, Mao Zedong Thought, Deng Xiaoping Theory and Theory of Three Represents, and think about "how can I practice Theory of Three Represents in my post"? At the same time, pay attention to strengthen the understanding of world current affairs and politics, improve their political discrimination ability through study, and always keep a clear head in front of big and big issues.
2. Strengthen theoretical study, followed by implementation in action. At work, systematically learn from your own work.
3. To strengthen theoretical study and pay attention to practice is to be able to master and be familiar with the application of theoretical knowledge and help yourself understand the essence of things in complex and changeable social phenomena.
Of course, strengthening study will still be a main content in my future work and life. Constantly strengthen study to meet the needs of social development, and constantly improve their own political and theoretical quality to meet the objective requirements of social and economic development.
Third, be strict with yourself and consciously abide by various systems.
Strictly abide by the policies of the office. Remember the instructions and criticisms of the leaders and put them into practice. Don't be late, don't leave early and don't be late for work. Do things carefully, carefully check the report to the leader, record the daily work and report it in time; Treat people with courtesy and get along with colleagues with frankness and tolerance; Serious office discipline, no slack in work, no games, no small talk, no things unrelated to the work content.
Fourth, there are shortcomings.
Not active enough at work, not communicating with leaders and everyone, not considering things comprehensively and meticulously. Although I work hard, I still have a long way to go from the expectations and requirements of the company leaders in my work. At the same time, I am not skilled enough in my new job, and so on. I am determined to reform and solve these problems in my future work in order to finish my work better. And what you should and can do, you should be brave enough to take this step, not relying on others, not shrinking, not escaping, so that you can be more confident, bold and careful in your work in the future.
Verb (abbreviation for verb) Work plan for next year.
1. Do your job dutifully. It is necessary to improve the engineering quality in strict accordance with engineering technology; Carefully measure and actively learn engineering technology.
2. Work hard to complete the tasks assigned by the leaders, and help the leaders solve problems where they can't learn.
The intransitive verb measures and completes the planned measurement.
1. Strengthen engineering survey management, improve work efficiency, ensure engineering survey quality, and formulate engineering survey methods.
2. The results of engineering investigation are the reflection of engineering quality after various engineering designs and constructions. In order to ensure the accuracy and timeliness of engineering survey results, it is necessary to improve the quality assurance system, provide thoughtful service, establish various work systems, carry out survey in strict accordance with the national engineering survey specifications and the work requirements of corresponding grades, reasonably organize survey personnel, equip with excellent instruments and equipment, implement effective testing procedures, and actively serve the project on the basis of meeting the measurement accuracy.
Xx years have passed, and although the project has not been formally completed, it has gained a lot. In particular, the solid work style and serious and responsible attitude of several leaders of the company set an example for our employees.
Summarizing the past and looking forward to the future, it is also a challenge for me to have a lot of work and heavy tasks in xx years. In the new environment, new opportunities and new challenges, how to build this project with high quality, high efficiency, low consumption, safety and civilization on schedule is a subject that civil engineers should think about.
In the future work, as the vanguard of project development, I will conscientiously implement the relevant regulations of the company, give full play to my subjective initiative, restrain myself with iron discipline, constantly learn new technologies and experiences, and be good at summing up. I also hope that the company leaders can give me more understanding and support, and strive to contribute to the development of the project.
2. Model essay on project summary report
In late winter and early spring, everything recovers. Hubei Jinzhong Construction Engineering Co., Ltd. ushered in a brand-new beginning. After a year's hard work, all the staff of the project department of Shayang People's Hospital of Admiralty Company will soon complete all the tasks assigned by the company and hand in a satisfactory answer sheet.
After a period of adjustment, the outpatient building of the People's Hospital has been basically straightened out and all the work has been carried out in an all-round way. In 20XX, the projects undertaken by Admiralty Construction Engineering Co., Ltd. improved, old projects and new projects started immediately, and the market situation was pressing, prompting us to work hard on the governance mechanism. In view of the management fee contracting mode proposed by the company, it is necessary to reform and innovate, combined with the actual development of Admiralty Company in China and many years of project development experience. The traditional project governance mechanism will be greatly reformed, and the incentive system for project staff governance will also be greatly adjusted to mobilize the enthusiasm of project staff.
I. Review of Work in 20XX
(1) Project construction:
1. Reconstruction project
Area 2-3, Building A6, Area A, Xishan New Town, Part A7 A A, A 10-2 is the project started in the second half of 20XX, mainly including the main works, indoor and outdoor decoration, data arrangement, etc. Area D is the main business area of D4 villa. Because D4 is the house where Party A's boss lives, our project specially arranges experienced old employees to take care of it on site, and strictly controls it from beginning to end. It is expected that all projects under construction will be successfully completed and handed over to Party A within this year. ..
2. Project completion
The finishing project of Building ***40 in Blocks A and D of Xishan New Town has a total area of about 65,000 square meters. Block A is Sichuan Huaxin Labor Service Company with an area of about 40,000 square meters, and Block D is Jiangbei Labor Service Company with an area of about 1.9 million square meters. Except for the influence of high-voltage lines, all building numbers are in the closing stage.
(2) Engineering quality, safe production and civilized construction:
1. Project quality:
The construction quality of Xishan New Town Project has been valued by the company, and everyone realizes that quality is the foundation of the enterprise. However, compared with the construction quality of the same industry, the improvement degree is too low, and some sub-projects and sub-projects still have common quality problems. For example, the prevention and treatment of wall plastering cracks; The practice in drip line, Yang Jiao needs to be improved, such as the prevention of cracks in indoor partition walls and the prevention of temperature stress cracks in parapets, and so on. It is also necessary to conscientiously sum up experience and strengthen governance. Under the leadership of the chief engineer, the topics studied by Xi 'an QC team will be tested and solved on the spot in a targeted manner to continuously improve our construction level and the construction reputation of the enterprise.
2. Safe production:
There was no safety accident in Xishan New Town in 20XX, and the safety accident was controlled at 0‰. It has been highly praised and praised by Anning Construction Bureau and Taiping Town Public Security Station, which is inseparable from the joint efforts of company leaders and employees. In 2007, in order to ensure safety in production, the project department strengthened safety awareness, invested a lot of on-site education time, and strengthened publicity and education on safety construction and production, which achieved remarkable results. We have done a lot of work in safety inspection, safety education and safety responsibility. In particular, the main equipment of my project is certified to prevent all kinds of accidents. There was no safety accident in 20XX years, but there was no problem at all. Safety work is a constant and unremitting work. For example, our temporary electricity consumption is not standardized, safety protection is not in place, the company's safety inspection also pointed out some shortcomings, and the safety hazards found on the spot were not rectified in time. These aspects need to be improved in our future work. It is necessary to institutionalize safety education and standardize governance.
3. Civilized construction:
Civilized construction of engineering projects is an important window to reflect the governance level and reputation of an enterprise. Over the past 20XX years, Xishan Project Department has received many leaders of the Ministry of Construction and mayors of Kunming and Anning. In terms of civilized construction and standardized management of construction, it is much better than local enterprises by learning from good experience, and won the honor of "Excellent Construction Site of Safety and Quality Standardization Management in Kunming" in the annual selection. However, the aviation construction in Kunming has just started, and on-site civilized construction is only a good step. We must work harder and become a leader in the same industry.
(3) Problems encountered in engineering construction:
In Area A of Xishan New Town, due to various reasons, Sichuan Huaxin Labor Service Company lacks on-site workers. Our company overpaid the service fee to Sichuan Huaxin Labor Service Company within the scope of the contract budget, and the laborers of Huaxin Labor Service Company demanded the living expenses when the company was short of funds, but Huaxin Labor Service Company did not come forward to solve it. Let the laborers regularly organize to contain the project department and cut off the power supply. The manager of my project department was injured by a steel bar and his glasses were smashed during parking. The employees of Huaxin Labor Service Company privately vilified Hang Jian Company in front of employees of other labor service companies, which seriously damaged the corporate image. For a period of time, the project department was blocked in site management, and was often scolded and even beaten by workers when it proposed to rework and repair unqualified sub-projects
Looking back on the working process of 20XX, it is a difficult year for field production. To sum up, most of the completed projects are left over from the construction of Sichuan Huaxin Labor Service Company, which brings us great difficulty in controlling the progress and has a great impact on timely delivery. Sometimes even the engineering changes sent by Party A dare not undertake, and Huaxin Labor Service Company has no one to do it, so we have to negotiate to transfer the changes to other labor teams on site to complete them. Taking the wall of A3 basement as an example, it took two weeks to determine the laborers and fulfill the requirements of Party A..
(4) Unite the team to do good deeds:
In last year's work summary, Xishan Project Department advocated "unity, mutual assistance and common improvement" to create a harmonious working atmosphere. With a good working atmosphere, employees can work happily and seriously. Vigorously promote the implementation in practical work, the project department cadres and workers often communicate and understand the situation of employees, and ask them to stop the discordant notes in time at any time, saying that it is conducive to work and unity. Looking back on 20XX, it seems so difficult and full of ups and downs. Most of their employees have left, but the employees left by Xishan have never given up and devoted themselves to the project, bringing new scenes to the scene.
II. 20XX Work Plan
In the past, it was not advisable to contract the project from a big pot of rice, and all the business risks were borne by the company. Workers still have waiting, relying on and important ideas. There is no obvious link between the project construction cost, production and operation benefits and the immediate interests of employees, and there is no incentive mechanism. Therefore, the newly established project department in 20XX adopted new governance measures, comprehensively implemented the double-layer management fee contracting mode, reformed and innovated, and combined with our own actual situation, gradually improved the contracting governance mode of the project department. If a new project starts, the management team formed by Xishan will plead for help at the first time, and we have the ability and strength to do new projects.
(a) 20XX Xishan project department general policy goal is:
It is imperative to reform the governance fee contract, climb the peak with success or failure experience, seize the opportunity and dare to challenge, and strengthen and improve standardized governance. Realize the overall transfer of the project to the new site, establish and improve the incentive mechanism, return the company's profits, and honor the employee's treatment.
(2) 20XX governance policy and main work:
Given that state-owned enterprises have been bound and influenced by the traditional concept of planned economy system for many years, most cadres and workers have no sense of risk and competition, and have not realized that the rice bowl of state-owned enterprises is no longer made of iron, but requires work, treatment, overtime and bonuses. The old concept must be changed, and the employees of state-owned enterprises and enterprises gradually turn to the contractual relationship with the economy as the link. This year, our company's reform and innovation in project management fee contracting is to change the previous practice of undertaking new projects and arranging managers to eat the same pot. While giving consideration to the interests of the state, enterprises and individuals, we should build a platform of fair competition and efficiency, and rely on our own talents and labor to get treatment. Everyone is hired to fight for it, and the salary is fixed. Salary is related to your position, knowledge, ability and performance.
According to the overall work arrangement of the company and the actual situation of our project department, we make a fuss about reform and innovation. "Reform" is the key work of our project in the coming year. Only by reforming and innovating and exploring new ways of on-site production management can our project get out of the predicament, go on and seek better development.
3. Model essay on project summary report
Our county's 2xx annual scientific and technological training, with the strong support of the Association for Poverty Alleviation and Development, successfully completed the training activities. Focusing on increasing farmers' income and increasing agricultural efficiency, this activity carried out extensive and in-depth scientific and practical technical training to continuously improve farmers' scientific, technological and cultural quality. Popularization of science and technology is an important measure to build modern agriculture, increase farmers' income and guide the masses to develop production, which has been welcomed by farmers. Now summarize the training completion. I. Basic information
Our county governs 363 villagers' groups in 36 village committees in 5 townships and 2 towns, with a land area of 1353.57 square kilometers. There are 25 ethnic groups, and the minority population accounts for 94.5% of the total population, of which the Wa population accounts for 72% of the total population. The total population of the county is 2365 1 household with 87428 people, including agricultural population 184 15 households with 678 1 person. The per capita net income 18 yuan is more, and the per capita ration is about 37 kg. Although the per capita net income of farmers has been increasing, so far, some farmers still have not solved the basic problem of food and clothing.
Second, the completion status
The training started in 2xx 1, and the training plan has been completed. The training scope covers 7 village committees in 5 townships and 2 towns 1 1 person-time, and training on breeding (pig raising) and planting (tea planting) is carried out, with the training fund of150,000 yuan. The details are as follows.
1, aquaculture training
According to the problems existing in pig breeding in our county, such as long breeding cycle, high cost and lack of awareness of disease prevention, in order to change the traditional breeding methods and improve farmers' pig breeding management technology, pig breeding training was carried out throughout the county, with a total of 5 sessions, benefiting more than 3 people, and the training time for each session was about 15 days. Specifically, the county poverty alleviation office is responsible for hiring professional and technical personnel to give lectures and on-site operation demonstrations. Training materials include techniques such as building stables, purchasing improved piglets, scientific ingredients, feeding management and disease prevention and control.
2. Planting training
The first choice to speed up farmers' poverty alleviation and well-off life is to develop tea industry. At present, the tea planting area in our county is 35,000 mu. However, due to the influence of traditional ideas and the lack of production technology, farmers in our county have poor management, low output and poor efficiency, so it is necessary to strengthen the training of production management technology. Tea planting training was carried out in the county, with a total of 16 sessions, benefiting more than 8 people, with each session lasting about 2 days. Specifically, the county poverty alleviation office is responsible for hiring professional and technical personnel for on-site training. The training materials include a series of techniques such as reclamation, tea seedling planting, management and pest control.
Through skills training, farmers can basically master the techniques of raising pigs and growing tea, improve their scientific and cultural quality, increase their economic income, enhance the management potential of aquaculture, reduce morbidity and mortality, greatly improve the quality of production, and lay a foundation for future development.
4. Model essay on project summary report
In order to conscientiously implement the central government's series of policies to expand domestic demand and stimulate economic growth, and promote the public welfare cultural construction project in xx town with heart, xx town has vigorously promoted the project implementation in accordance with the spirit and requirements of relevant meetings of the central government, provinces, cities and counties, combined with the reality of xx. The status quo of the project is summarized as follows: 1. Implementation of the project construction.
Since the National Development and Reform Commission (NDRC) approved the construction of the Cultural Station in June 5438+February, the Party Committee and government of xx Town have attached great importance to this work, held special meetings for many times, and set up a leading group for this project, with the secretary and mayor as the team leader and the deputy team leader in charge. On February 2nd, 65438+2xx, a special meeting was held, and it was decided to demolish the old cinema in the town and use the site for building.
The main project of Cultural Station was tendered in the County Construction Bureau on March 8th, 2xx, and ground was broken on March 1 1, with a construction period of 27 days. 18 was completed on February 8th, and passed the acceptance. In the process of construction, the project was constructed in strict accordance with the contracts and passed the acceptance at one time. At present, the materials needed for the construction of the business building of the comprehensive cultural station and the procedures of various departments have all been completed.
Second, the basic situation of the construction project.
The business building construction project of xx Town Comprehensive Cultural Station is located in the center of the town government, with good geographical conditions, with a total area of 1523, a construction area of 29.64 and a total construction area of 587.94, and a two-story frame structure.
Third, functional layout.
The basic functional space of cultural station requires the combination of indoor and outdoor.
Basic indoor functions include:
1, multi-function live broadcast Source: Look at kanzhun. Activity room: mainly used for small-scale cultural performances, rehearsals, training rooms, chess and cards, calligraphy and painting exhibitions and other activities.
2. Books and periodicals reading room: mainly used for borrowing books and reading newspapers and periodicals.
3. Information resource sharing project service room: it can be used as a microcomputer room for cultural information resource sharing project.
4. There are offices, management rooms, children's rooms, elderly activity rooms, indoor gyms, etc.
Outdoor basic functional space is used for cultural activity square.
A light in the stadium.
② One outdoor stage.
③ A fitness area.
④ Green belt.
⑤ Set two windows with 5m blackboard columns.
Four, the funds in place, investment and use.
1. Up to now, the project should invest 440,000 yuan, and now it has invested 372,000 yuan, including the central investment160,000 yuan, the provincial investment of 50,000 yuan, the municipal investment of 92,000 yuan and the county investment of 70,000 yuan.
2. Investment status:
The project budget investment is 80,000 yuan, including ancillary works. Among them, the main project investment is estimated to be 70,000 yuan, including: drawing design fee 13 yuan, entrusted supervision fee 7 yuan, quality inspection fee 4 yuan, geological exploration fee 48, drawing review fee 68 yuan, main project 70,000 yuan and auxiliary project 1 10,000 yuan.
3, the use of funds:
40,000 yuan has been paid for the theme project, such as quality inspection in 4 yuan, drawing inspection in 68 yuan, supervision in 7 yuan, geological exploration in 48 yuan, gate fee in 46 yuan, drawing design 13 yuan.
After the business building of xx Town Comprehensive Cultural Station was put into use, the service scope covered 8 village committees and 56 villagers' groups in the town, serving 283 13 people.
After the project was put into use, it greatly enriched the cultural life of the broad masses of people in xx town, improved the quality of cultural activities, and completely solved the problems of people's difficulty in reading, reading newspapers and entertaining.
5. Model essay on project summary report
Time flies, the sun and the moon fly like a shuttle. One year is really short, and before you know it, 20 12 will pass. The new year has come again. At the turn of the old and the new, we should sum up the past, think about the future, learn from the past, make up for the future and sum up our work in order to better complete our work in the new year. I joined the engineering department of the company on March 20 12, and was mainly responsible for the technology, construction and cost management of HVAC and water supply and drainage. In the course of my work, I will abide by the company's rules and regulations, be strict with myself at ordinary times, and be honest and self-disciplined. I am conscientious and responsible in my work, able to integrate theory with practice, cooperate with colleagues in the engineering department and related departments, and better complete all the work assigned by the company leaders.
First of all, in terms of technical management:
1, can patiently and meticulously do a good job of drawing review, cooperate with the competent leaders and relevant design units to implement the location and direction of water supply and drainage, heating, gas and other pipe networks in the community, find unreasonable schemes and designs as much as possible, put forward their own schemes and ideas, communicate with designers attentively, and improve the design of schemes and construction drawings. For example, Zhongrong International Project has many underground structures, and the underground garage and underground civil air defense are connected with various buildings, which will lead to drainage pipes in the future.
Therefore, it is proposed to the competent leaders that a passage should be set aside between buildings 2#, 3#, 4# and 5# and underground garage and underground civil air defense, otherwise the drainage pipe network in the community will not be laid. For another example, the design institute designed the heating and water supply and drainage pipes of the connector on the street of Hankou, but there was no place to lay so many pipes on the street of Hankou. After consulting the competent leader, raise an objection to the design unit in time, and change the design after being audited by the design unit.
2. External coordination: For an engineering project, external coordination is of great help to the smooth development of the project. My main job is to cooperate with various professional companies (tap water, heating, gas) to complete the supporting design of the pipe network of the project under the guidance of the competent leader. With the correct leadership and help of the leaders, we have maintained a good cooperative relationship with various professional companies, and the supporting design of various professional pipe networks is progressing as scheduled. At present, the design of water supply and drainage pipe network has been completed, and the design of gas and heating pipe network is under way. In the process of work, I can cooperate with various professional designers to complete various tasks from the company's interests and perspectives.
Secondly, in terms of site management: since I entered the site in April, I began to study the site water use scheme with my leaders, and assisted them to complete the relevant procedures and design work after the scheme was implemented. In cooperation with the water supply company, the construction of temporary water and on-site construction water for Zhongbaiyi Reservoir was completed, ensuring that the project started as scheduled. Before foundation excavation, with the help of leaders and colleagues, the laying of drainage pipes in the construction site was completed according to the actual situation, which solved the drainage problem of foundation excavation in various construction units.
In the process of making the scheme, the plastic drainage pipe is adopted in combination with the actual project. After drainage, the pipeline can also be used for the hole of the range hood, saving the necessary funds for the company. After the project entered the main construction stage, in view of the hidden parts that are prone to problems, the supervisor and the plumbing squad leaders of various construction units were organized to hold a meeting in time, which put forward clear requirements for waterproof casing's materials and production, and made technical disclosure on the problems that are prone to occur in the project. All construction units are required to do a good job in the sample room before the construction of each working procedure, and can continue the construction only after passing the inspection by Party A and the supervisor to ensure the engineering quality.
In the process of engineering construction, because the professionals of the supervision company sometimes can't be in place in time, it is necessary to carry out regular inspections to check whether the positions and specifications of various pipelines meet the design and specification requirements, so as to find and deal with the problems existing in the project as soon as possible without affecting the construction of subsequent projects. For example, improve the elevation of the drainage pipe outside the house and solve the problem that the drainage pipe on one side of Hankou Street is too low. In the process of construction management, we can adhere to the design documents as the basis, in strict accordance with the requirements of construction specifications for inspection.
Third, in terms of project cost management:
Be able to strictly review the site construction visa, follow the principle of construction visa, effectively control various factors affecting the project cost, carefully review the list of materials proposed by the construction unit, and correct problems and mistakes in time when found.
Most importantly, I have done some work in the past year. In the past year, I have made some achievements, but there are also some shortcomings. I sum up my past experience and try to correct the shortcomings in my past work. In my future work, I will be more strict with myself. While doing our job well, we should constantly learn and accumulate, constantly ask questions, constantly solve problems, and constantly improve ourselves to ensure high efficiency and high quality. Dedicated to the development of the company.