Examination paper on basic theory of engineering cost valuation
(Examination time: 90 minutes)
A, single choice questions (***60 questions, each question 1 point. ***60 points, choose a correct answer from the alternative answers of each question, and fill in the correct figures in brackets. Choose the right score, choose the wrong one, and don't score if you don't choose)
1, the compatibility of project cost is reflected in ().
A. long-term and unity B. extensiveness and complexity caused by two layers of meaning and cost
C. Absolute and stable relativity of motion D. Dependence and connection of motion
2. The most important condition to realize the project cost function is ().
A. national macro-control; B. Formation of competition mechanism in shopping malls
C. Establishing price information system D. Modernization of quota management
3. Project cost management has two meanings, one is investment cost management, and the other is ().
A. Project price management B. Project cost valuation basis management
C. Management of engineering cost professional team D. Management of engineering construction quota
4, the following construction and installation engineering costs, should be included in the direct cost is ().
A. Import and export fees of construction machinery B. Instrument use fees
C. Fees for inspection and testing D. Fees for using tools and appliances
5. In the investment of a project, the other expenses of equipment, building installation and engineering construction are 6 million yuan, 6.5438+million yuan and 4 million yuan respectively, and the basic reserve rate is 654.38+00%. The investment and construction period is two years, and the investment in each year is equal. It is estimated that the investment price will increase by 5% annually, so the reserve fund for price increase of this project is () ten thousand yuan.
152.5 b . 100 c . 167.75d 52.5
6, a correct understanding of China's engineering construction quota is ().
A. quota is the product of planned economy.
B quota is the object of system reform that goes against the market economy.
C quotas can still play a role in the socialist market economy.
D. quota is not conducive to saving social labor and improving production efficiency.
7. If a project needs to purchase special steel 10 ton, the ex-factory price is 5000 yuan/ton, the supply and marketing handling fee rate is 1%, the material transportation fee is 50 yuan/ton, the transportation loss rate is 2%, and the storage rate is 8%, then the budget price of this special steel is () yuan.
56 160
8, in the preparation of other engineering construction cost quota, the basis of basic reserve funds is ().
A. Project cost B. Project cost+other expenses
C. project cost+loan interest during construction d. project cost+other expenses+loan interest during construction.
9. The main function of budgetary estimate index is ().
A. As the main basis for compiling investment estimation B. The main basis for estimating the consumption of main materials
C. The main basis for the site selection of the construction unit D. The main basis for determining the investment amount
10, and the investment estimation index is greater than other valuation quotas ().
A.b. comprehensiveness and accuracy
C. comprehensiveness and adjustability D. generality and adjustability
1 1. The statement about engineering change is wrong ().
A. engineering changes include changing the construction time and sequence of related projects.
B any engineering change shall be confirmed by the engineer and an engineering change instruction shall be issued.
C during the construction period, the contractor shall not change the original engineering design without authorization.
D the engineer agrees to adopt the rationalization proposal of the contractor, and all expenses arising therefrom shall be borne by the owner.
12. In the classification of creditor's rights, it can be divided into single creditor's rights and total creditor's rights. The correct statement about the total creditor's rights law is ().
A. methods forced to use in some cases
C. an easier solution.
13. According to the nature of the claim business, the claim can be divided into ().
A. Engineering claims and commercial claims
C.d. Claims and counterclaims
14, according to China's current investment composition, the following expenses do not belong to the basic reserve fund is ().
A, the increased cost of design changes B, the cost of making up for the losses caused by natural disasters.
C. Increase of local foundation treatment cost D. Increase of cost due to price change during construction.
15, the following quota, does not belong to the classification according to the nature of investment costs is ().
A, budget estimate quota b, construction project quota c, equipment installation project quota d, and various expenses quota
16, according to the principle of construction and installation engineering quota, calculated at the average advanced level is ().
A, budget quota b, enterprise quota c, budget quota d, budget indicators
17, the original price of a bagged cement is 350 yuan /t, the handling fee rate of the supply and marketing department is 4%, the transportation and miscellaneous fees are 18 yuan /t, the secondary transportation fee is 5 yuan /t, the transportation loss rate is 1%, and the storage fee is 2%, so the storage fee per ton of cement is ().
a、7.7 1 B、7.43 C、7.36 D、7
18, a masonry project with brick-concrete structure, when the basic labor of 10m3 masonry is 13.5 man-days, the auxiliary labor is 2.0 man-days, the overloaded labor is10.5 man-days, and the labor range difference coefficient is 10%, then the budget of this masonry project.
a、 14.85 B、 17.52 C、 18.7 D、20.35
19, measure the quantity and quality of workers' labor, and the index reflecting the results and benefits is ().
A, time quota b, output quota c, construction quota d and budget quota
20, in the investment estimation index, unit engineering index should be included in the () by the regulation.
A, construction and installation project cost b, total investment from project preparation to completion and delivery.
C, construction and installation engineering fees, equipment factory tools fees, other expenses d, construction and installation engineering fees and other expenses.
2 1, the fourth level project code in the bill of quantities is ().
A, classification code b, specific list item code c, chapter sequence code d, list item code
22, partial bill of quantities should include ().
A, bill of quantities and bill of quantities.
B, project code, project name, unit of measurement and engineering quantity.
C bill of quantities, bill of measures and other project lists
D, project name, project characteristics, project content, etc.
23, when using the bill of quantities valuation, the basis for bidding quotation is ().
A, the owner to provide quantities, according to the current budget to expand indicators.
B, the owner to provide quantities, combined with all kinds of information, data and enterprise quota.
C the quantities calculated by the contractor shall be compiled with reference to the current budget quota.
D, the contractor to calculate the quantities, combined with the enterprise itself to master all kinds of information, data and enterprise quota, calculate the quantities.
24, investment decision-making stage, one of the important basis for choosing construction project investment scheme is ().
A, project budget B, investment estimate C, design estimate D, project tender offer
25, when compiling its own cash flow statement, the table does not reflect the inflow and outflow of construction project investment loans, because ().
One, don't borrow.
B, the provisions do not need to be included in the loan project.
C. observe the cash flow of the project from different angles.
D, the inflow and outflow occur at the same time, and the amount is the same, which has no influence on the calculation of net cash flow.
26, in the following items, can reflect the enterprise solvency index is ().
A, investment profit rate b, quick ratio c, net present value rate d, financial internal rate of return
27. The construction period of a project is one year, the construction investment is 8 million yuan, and the net cash flow at the end of the second year is 2.2 million yuan, 2.42 million yuan in the third year, 2.66 million yuan in the fourth year and 2.93 million yuan in the fifth year. The static investment payback period of this project is () years.
a、4 B、4.25 C、4.67 D、5
28, the design budget is to prepare and determine the construction project ().
A, from the preparation to the completion of the construction and installation engineering documents required for the full cost.
B, all expenses required from preparation to completion, delivery and use of documents.
C, from the start to the completion of the construction and installation engineering documents required for the full cost.
D. All expenses required for the delivery of documents from the beginning to the completion.
29, in the following, belongs to the construction unit project budget is ().
A, health engineering budget b, mechanical equipment engineering budget c, electrical equipment engineering budget d, thermal equipment engineering budget
30. News & gt stipulates that the minimum length of the tender documents shall not be less than () from the date of issuance to the deadline for bidding.
A, 15 days b, 20 days c, 30 days d, 45 days
3 1, according to> regulations, large-scale infrastructure, public utilities and other projects related to social public interests and public safety ().
First, public bidding must be conducted.
B, bidding must be invited.
C, in addition to the approval of the relevant departments can be invited to tender, should be open tender.
D, should be invited to tender, but with the approval of the relevant departments can not tender except.
32, commonly referred to as the construction project completion acceptance, refers to ().
A, project overall acceptance B, single project acceptance C, unit project acceptance D, division project acceptance
33. The bidder shall fill in the unit price and total price item by item according to the bill of quantities provided by the bidder. After the bid opening, it is found that the tenderer has not filled in the breakdown of unit price or total price, then ().
A, allow bidders to fill in b, which is regarded as invalid bidding.
C, think that this fee has been included in the unit price and total price of other projects D, returned by the tenderer.
34. For the project with fixed contract unit price, the intermediate settlement shall be treated as ().
A, the quantities in the bill of quantities B, the quantities actually completed
C, the quantities specified in the contract d, the quantities submitted by the contractor.
35, the following, the cost claim is not established ().
A, the design unit failed to provide construction drawings in time; B, the construction unit construction machinery damage.
C, the owner requires to suspend all engineering construction; D, the project content is increased due to design changes.
36. In case of labor cost claim, it can be calculated according to the daily labor cost ().
A, increase the labor cost of work content B, shutdown loss fee
C, losses caused by reduced work efficiency D, the wages of the crew on board
37. After receiving the completion settlement report and settlement data submitted by the contractor, the Employer shall confirm it or propose amendments. The time specified according to> should be ().
A, 7 days b, 14 days c, 28 days d, 56 days
38, the value of goods is determined by ().
A the actual labor time of producing goods b the socially necessary labor time of producing goods.
C the personal labor time specified in commodity production D the value created by living labor in commodity production
39, value engineering focuses on () stage?
A tender stage b construction stage c design stage d completion acceptance stage
40. The first meaning of project cost is: (1) the expected or actual expenditure of a construction project.
A total investment b part investment c fixed assets and current assets d total investment in fixed assets
4 1, static investment is the construction project investment calculated on the basis of the price of building elements in a certain base year (). A curing value b average value c instantaneous value d cost value
42, China's current "construction engineering bill of quantities valuation specification" adopted in the unit price is ().
A comprehensive unit price b quantity unit price c index unit price d above methods can be used.
43, the ultimate goal of the project cost management system reform is to () as the main price mechanism.
A market formation price B government issued instruction price C government issued guidance price D government and enterprises negotiated prices.
44, Zhejiang Province, 2003 edition of the construction project charging quota comprehensive fee charging project category, the project is divided into ().
Category I, II, III and IV
C special category, one, two, three, four D special category, one, two, three
45, the following about the management of China's engineering cost consulting unit, the correct is ().
An engineering cost consulting unit can undertake any range of engineering cost consulting business.
The qualification grade of the engineering cost consulting unit is permanent.
C the newly established engineering cost consulting unit can directly apply for the qualification grade of Grade A engineering cost consulting unit.
D engineering cost consulting unit is an intermediary or consulting service organization that provides engineering cost determination and control services and issues engineering cost achievement documents.
46, in the category of imported equipment delivery, the buyer's biggest delivery risk is ().
A, delivery at the port of destination of the importing country B, delivery at the port of shipment of the exporting country.
C, delivery at the designated place in the importing country; D. deliver the goods at the designated place in the exporting country.
47, an imported equipment, CIF is 56 million yuan, the tariff rate is 2 1%, the value-added tax rate is 17%, there is no consumption tax, then the value-added tax payable for the imported equipment is () ten thousand yuan.
a、2 128 B、 1 15 1.92 C、952 D、752.08
48. When the imported equipment is FOB at the port of shipment, the seller's responsibility is ().
A, rent the cabin, pay the freight B, go through the export formalities and load the ship.
C, all risks and freight after shipment D, handle overseas transportation insurance and pay insurance premium.
49, the original price of domestic standard equipment, generally calculated by ().
A, original price plus spare parts B, quota pricing method C, series equipment insertion pricing D, grouping and combination pricing
50, China's current construction and installation engineering quota regulation, sick pay for more than six months should be included in ().
A, enterprise management fees b, fees c, measures d, direct costs
5 1, China's current construction and installation project quota, the pension paid by enterprises to retired employees should be included in ().
A, profit B, measure fee C, direct engineering fee D, enterprise management fee
52. If you invest 65,438+0,000 yuan at the beginning of the year with an annual interest rate of 6%, you will get the sum of principal and interest by the end of the fourth year ().
A, 1262.50 yuan b, 1240.0 yuan c, 1248.8 yuan d, 1256.8 yuan.
53. An investor bought a bond with a term of 1000 yuan, with an annual interest rate of 10%, and repaid the principal and interest at maturity. According to the compound interest calculation method, the interest that investors can get after 3 years is ().
A, 33 1 yuan b, 335 yuan c, 346 yuan d, 300 yuan.
54. The annual interest rate is 6%. If the sum of principal and interest obtained at the end of the fourth year is 1262.5 yuan, the investment at the beginning of the first year is ().
A, 1000 yuan b, 955 yuan c, 1050 yuan d, 986 yuan.
55. If I1= 2i2; N 1=n2/2, then there is () when P is the same.
A(F/P,i 1,n 1)& lt; (F/P,i2,n2) B (F/P,i 1,n 1)>(F/P,i2,n2)
C(F/P, i 1, n 1)=(F/P, i2, n2) D cannot determine the relationship between them.
56. The enterprise borrows RMB 65,438+0,000 from the bank, with an annual interest rate of 4%. If the interest is calculated quarterly, the principal and interest will be repaid in the third year, totaling () yuan.
a . 1 125 b . 1 120 c . 1 127d . 1 172
57, the effective conditions of the contract include ().
A stands for truth. B. the contents of the contract are legal. C. The contents of the contract may be D. All the above are true.
58, in accordance with the relevant provisions, the unit that applies for the construction permit to the project location should be ().
A. construction unit B. supervision unit C. construction unit D. or above.
59, about the agency, the following statement is wrong ().
A. the agent is engaged in civil legal liability in the name of the principal.
B the agent expresses the will of the principal within the agency authority.
C. the legal consequences of agency behavior shall be borne by the principal.
D. the function of an agent is to carry out civil legal acts.
60. In Quanta software, the following () is not a list number input method.
A through the directory structure tree input B directly input list code C list and quota one-time import D search input.
Second, multiple-choice questions (***20 questions, 2 points for each question. Each question has two or more options that meet the meaning of the question, with at least 1 wrong items. Wrong choice, this question does not score; Choose one less item, and add 0.5 points for each item)
6 1, which can be divided into () according to the different methods of pricing.
A. Direct cost B. Indirect cost C. Production and circulation cost D. Specific cost
62, the characteristics of the construction project cost valuation is ().
A. Use the name of the cost engineer. B. Sign the project cost document and affix the special seal for practice.
C. Provide project cost information according to relevant regulations D. Keep technical and economic secrets in practice.
E. receive continuing education and improve professional and technical level.
63. In the construction and installation engineering cost, the basis for calculating the planned profit is usually ().
A. direct cost+indirect cost B. direct engineering cost+indirect cost
C. Labor cost D. Labor cost+material+equipment value
E. Labor cost+construction machinery use fee
64. The basic statement used for financial evaluation of construction projects is ().
A. Investment estimation table B. Cost estimation table C. Income statement
D. Table of sources and uses of funds E. Table of product sales income, sales tax and additional estimates
65. In the balance sheet of investment projects, assets include ().
A.b. Construction in progress
C. Long-term loans D. Net intangible assets and deferred assets E. Accounts payable
66, according to the "Bidding Law", the bidding methods of equipment and materials procurement are ().
A. public bidding B. invitation to bid C. negotiation D. direct order E. inquiry
67. The following expenses, should be included in the construction and installation engineering labor cost is ().
A, production worker education funds b, production worker labor protection fees
C, retired wages of production workers d, auxiliary wages of production workers e, welfare fund of production workers
68. The engineering construction quota according to its system, promulgation and consistent use, unified performance for ().
A, unified procedure b, unified principle c, unified level d, unified purpose e, unified requirements
69. The calculation rules of quantities in the bill of quantities are divided into () by specialty.
A, construction engineering, installation engineering B, sanitary engineering C, decoration engineering D, landscape engineering E, municipal engineering
70. The following about the bill of quantities valuation method is correct ().
A. This method is an independent pricing model B. This method is a market pricing model.
C, this method is usually called bill of quantities bidding.
D, this method includes the preparation of pre-tender estimate, bid quotation, determination and adjustment of contract price and project settlement.
E, this method includes the preparation of bill of quantities format, the preparation of quotation and the use of bill of quantities for bid evaluation and calibration.
7 1. In the economic evaluation of construction project investment scheme, the feasible condition of construction project is ().
A. FNPV≥0 B, FIRR≥ic C, and p ′ t ≥ payback period of industry benchmark investment.
D, investment profit rate ≥ industry average investment profit rate E, loan repayment period ≥ loan contract period.
72. The construction drawing budget is based on ().
A, bill of quantities b, construction drawings and instructions c, quota and cost standard
D, labor, materials, machinery affecting the budget price e, engineering contract or agreement.
73. In the process of preparing the pre-tender estimate for construction projects, the following factors must be considered ().
A, target time limit for a project b, the quality requirements of the construction unit for the construction project
C, the economic strength of the construction unit d, the market price of building materials e, should meet the requirements of the tender documents.
74. The technical review of bid documents includes ().
A, actual response degree B, quality control measures C, feasibility evaluation and key process evaluation of the scheme
D. Evaluation of environmental pollution protection measures E. Site layout and schedule.
75. According to>, of the following statements about construction quality and inspection, the correct one is ().
A, the project quality should meet the quality standards agreed in the contract.
B, the engineer found that the quality is unqualified, can require the contractor to rework or deduct the corresponding project payment.
C, the contractor shall accept the engineer's quality inspection at any time.
D, engineering quality inspection by the engineer, found that the quality problems caused by the contractor, shall be borne by the contractor.
E. If the engineer's inspection affects the normal construction, the Employer shall bear the corresponding losses.
76. Engineering claims can be classified according to different standards ().
A, contract basis b, claim purpose c, claim event nature
D, the parties to the claim e, the method of claim processing
77. The contents of the final accounts of construction projects include ().
A. Final Statement of Completion B. Final Statement of Completion C. Tender Offer
D, determination of the value of new assets E, comparative analysis of project costs
78, in the use of Quanta software cross-disciplinary input project quota, should be in front of the quota book with professional quota identification subtitle ().
A. Architecture (j) B. Installation (a) C. Municipal (s) D. Garden (y)
E. You can borrow up to 20 articles from the same book list.
79, don't prepare the total budget, the composition of the comprehensive budget of a single project includes ().
A. Construction unit project budget B. Equipment and installation unit project budget
C.d. loan interest during the construction period
E. Estimation of other costs of engineering construction
80, construction drawing stage bidding, on the basis of calculating quantities according to the construction drawing, the preparation of pre-tender estimate quota must fully consider the factors are ().
A. target construction period B. quality requirements of the tenderee C. adjust the project decoration and equipment according to different situations.
D. Construction drawing requirements E. Scope of bidding project
Basic theory of engineering cost valuation
A, single choice questions (***60 questions, each question 1 point. Only one option in each question best fits the meaning of the question)
1.B 2。 B 3。 A 4。 A 5。 C 6。 C 7。 An eight. B 9。 D 10。 A
1 1.D 12。 A 13。 A 14。 D 15。 A 16。 B 17。 A 18。 C 19。 C 20。 A
2 1.D 22。 B 23。 B 24。 B 25。 D 26。 B 27。 B 28。 B 29。 A 30. B
3 1. A handful of 32. A handful of 33. C 34。 B 35。 B 36。 A 37. C 38。 B 39。 C 40。 C
4 1.C 42。 A 43. A 44. B 45。 D 46。 D 47。 B 48。 B 49。 A 50. A
5 1.D 52。 D 53。 A handful of 54. C 55。 D 56。 A 57. B 58。 D 59。 D 60。 A
Second, multiple-choice questions (***24 questions, each with 2 points. Each question has two or more options that meet the meaning of the question, with at least 1 wrong items. Wrong choice, this question does not score; Choose one less item, and add 0.5 points for each item)
6 1,62,63,64,65,66,67,68,68
69. ACDE 70, ABCD 7 1, Abd 72, BCDE 73, Abd 74, BCDE 75, ACDE 76, ABCD 77, Abe 78, BCDE 79, Abe 80, Abd.