1) the inspection work is led by the director of the center, with the specific assistance of the quality assurance staff and the close cooperation of relevant departments to strengthen management.
2) The management of testing work must be carried out in strict accordance with the contents and requirements stipulated by the Center (applying for metrological certification) and the quality manual.
3) In principle, the center will not carry out inspection beyond the business scope of the department, and will not issue inspection reports for any items that have not been certified by metrology. If entrusted by the relevant departments and units, it is indeed a project that has not been certified by measurement, it should be explained in advance, otherwise the inspection report issued is unfair and the center will not bear legal responsibility.
4) The personnel engaged in testing work in this center shall be trained, assessed and issued in strict accordance with the requirements of (Technical Assessment Standard for Metrology Certification of Product Quality Inspection Institutions), and unlicensed personnel shall not be arranged to engage in testing technical work.
5) Attach importance to quality management, and conduct quality control on the testing work of this center. All kinds of technical professionals and testing personnel must carry out the testing work seriously in accordance with the relevant procedural norms and standards, so that the testing work of this center will gradually embark on the track of standardization, proceduralization and standardization, ensure the scientificity and accuracy of the testing results, and continuously improve the quality of testing work.
6) Do a good job in the daily management of testing work, such as strengthening the quality construction of testing teams, regularly conducting professional and technical training for testing personnel, arranging advanced studies and attending professional academic conferences, introducing technology, updating knowledge, supporting and updating instruments and equipment, and constantly improving the level of testing technology.
7) The technical management personnel of the test work should be bold and rigorous, and the test personnel should stick to their posts, work actively and put forward reasonable suggestions on their own initiative.