Sample of hydropower contract

1 water and electricity contract sample: _ _ _ _ _ _ _ Project Department (hereinafter referred to as Party A)

Contractor: _ _ _ _ _ _ (hereinafter referred to as Party B)

Dongxing Construction Company won the bid for the sub-project of water supply and drainage, electrical installation and lightning protection of Building No.3 of Century Bund. Through negotiation between Party A and Party B, Party A will hand over the public works to Party B for construction. In order to clarify the relationship between the rights and obligations of both parties, the following contract terms are formulated for some matters between contractors:

Scope of the first contract: installation and construction of all water supply and drainage, fire fighting, strong electricity, weak electricity and lightning protection designed in the design drawings of the 3rd floor of the Century Bund, as well as temporary water and electricity consumption in the civil construction of the office building.

Article 2 Form of contract: The contract work does not include materials.

Article 3 Contract price: RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 4 Payment method:

Article 5 Project quality: The project must be constructed in strict accordance with the design drawings and construction acceptance specifications, subject to the management of the construction unit and Party A's personnel, carefully construct, and strictly control the construction procedures and quality of each working procedure. After the completion of each working procedure, tests should be carried out and inspections should be conducted; After the completion of building electrical engineering, quality acceptance must be carried out according to Code for Construction Quality Acceptance of Building Electrical Engineering (gb50303—2002).

1, building water supply and drainage works shall be accepted according to Code for Acceptance of Construction Quality of Building Water Supply and Drainage (gb50242—2002), and the quality must be qualified.

2, lightning protection buckle fire engineering must be qualified by the quality inspection department.

3. If there are unqualified students, Party B must rework them in time, and the labor and material costs shall be borne by Party B. ..

4. If there is any quality problem during the warranty period after completion and delivery, Party B must repair it in time at its own expense, otherwise, Party B shall bear the responsibilities and losses caused by short circuit and burning of electrical appliances during use due to illegal construction.

Article 6 Construction safety: Party B must strictly implement the national laws and regulations on production safety and the enterprise production safety system, and attach importance to production safety. If Party B directs illegal operations, all consequences of safety accidents and quality accidents shall be borne by Party B. ..

Article 7 Time limit for a project: During the civil construction stage, the water and electricity embedment and installation progress must meet the overall construction progress. If the construction period is delayed and the construction progress is affected, rewards and punishments will be given according to the time limit set by the project department.

Article 8 Matters related to material supply: Party B plans the dosage of various materials in advance according to the design drawings and submits it to the person in charge of Party A, and cooperates with Party A's material staff in purchasing to avoid the delay in material supply affecting the construction period. Materials purchased after water and electricity must meet the quality requirements, and the factory certificate of products shall be kept. Unqualified materials shall not be purchased into the construction site or used in the project.

Article 9 the civilized construction:

1. Party B must conduct civilized construction on the construction site. All materials must be neatly stacked, stored in designated locations, and collected when materials are used. If materials are wasted or lost due to Party B's improper management, Party B will compensate.

2, do a good job in canteen hygiene and staff life; If there are unsanitary behaviors, such as littering, defecating, etc., a one-time fine will be imposed on 20 yuan and above.

3. If Party B's personnel fight at the scene, they will be fined at one time 100 yuan or more.

4, to do a good job of cooperation between each type of work, completes the hole reserved, built-in embedded.

Article 10 Special Matters

1. If Party A uses temporary water and electricity during construction and installation, Party B shall send someone to follow up the service. If Party A fails to track the service, Party A may deduct the service fee from Party B's contract fee.

2. Party B must do a good job in the family planning management of the floating population, and all the people shall enter the site with the relevant certificates of family planning, so as to prevent the phenomenon of violating the national family planning. If leaders at all levels find violations through inspection, all responsibilities shall be borne by Party B. ..

3. All creditor's rights and debts incurred by Party B during the contract period shall be handled by Party B itself, and Party A shall be irresponsible, and Party B shall not default on the wages of migrant workers.

4. If Party A is criticized by Party B, resulting in loss of honor, Party B shall compensate Party A for the loss of honor according to the seriousness of the case. Deduct from Party B's project payment.

6. This contract shall come into force as of the date of signature by both parties, and shall become invalid after the execution of the contract terms.

7. This contract is made in quadruplicate, with each party holding two copies.

Party A: _ _ _ _ _ Representative: _ _ _ _ _ _ _

Party B: _ _ _ _ _ Representative: _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Water and electricity contract sample 2 Party A: _ _ _ _ _ (hereinafter referred to as Party A)

Party B: _ _ _ _ _ (hereinafter referred to as Party B)

According to the national Construction Law and Contract Law. Principles of equality, openness, fairness and freedom: Party A is now signing the _ _ _ _ _ _ _ _ _ _ _ _ _

1. Party B shall carry out the construction as required under the organization of Party A. If it does not meet the requirements of the drawings and Party A, Party B shall bear all losses. If Party A makes mistakes, Party A shall bear the cost of rework. If the drawings are unreasonable, Party B shall negotiate with Party A before starting construction. Otherwise, Party B shall bear the cost of rework.

2. Party B shall submit the required materials three days in advance. Party B shall submit the materials realistically. If the materials cause more than 3% damage and waste (not including errors in the submitted quantity), Party A has the right to claim compensation.

3. After each working procedure is completed, Party B shall clean up the site, and shall not throw it about, and pile it in the place designated by Party A. The remaining materials shall be returned to the warehouse in time. When the materials arrive at the construction site, Party B is responsible for getting off, and special circumstances can be negotiated.

4. Party B shall complete the project on time according to Party A's requirements on the premise of quality and quantity, and Party A shall complete it within five months from the date of signing the contract, otherwise Party B has the right to investigate the lost time.

5. Party B must abide by Party A's rules and regulations and conduct civilized and safe construction. If all safety accidents are caused by illegal operation, Party B shall be responsible for it.

6. Party B will be cleared out of the project due to work stoppage, quitting halfway or disobeying Party A's management (due to Party B's own reasons). Party A has the right to deduct all the project funds as project loss expenses.

7. Solve all the tools by yourself. The tools provided by Party A must be returned in good condition after completion, and the damage shall be borne by itself.

8. Party A has the right to request Party B to temporarily transfer, and the laborer shall pay Party B the working day wage 120 yuan/day (8 hours). Party A is only responsible for the fare when going out to work, and Party B cooperates with Party A to pick up and drop off.

9. Payment method:

Each layer of embedded parts is completed. Party A will pay 30% of the project cost for each floor within one week. After the installation of threading, plugs, switches and boxes on each floor is completed, Party A will pay 30% of the project cost on each floor within one week. The remaining 40% shall be paid within one month after the completion acceptance: 26 yuan/㎡ (according to the actual construction area of the recipient).

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Water and electricity contract sample 3: _ _ _ _ _ _ _

Tel: _ _ _ _ _ _ (hereinafter referred to as Party A)

ID number: _ _ _ _ _ _

Contractor: _ _ _ _ _ _ _

Tel: _ _ _ _ _ _ (hereinafter referred to as Party B)

ID number: _ _ _ _ _ _

Party B undertakes the installation of water, electricity and heating in Jiahuailin Community and Li Lou Community of Xingyang City. During the construction, both parties have no objection. Comply with the "Regulations on Construction Projects Contracts" and other relevant regulations. Follow the principles of equality, voluntariness, fairness and good faith. In order to clarify the rights, obligations and economic responsibilities of both parties in the construction process, both parties have reached a consensus on the relevant matters of this project, and the following contract provisions are formulated for common compliance.

I. Overview of the Project:

① Project name: _ _ _ _ _ _ _

② Project location: _ _ _ _ _ _ _

⑧ Structural formula: _ _ _ _ _ _ _ _

Second, the way of contracting: water, electricity and heating.

Party A will sign a _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ contract.

Three. Content and scope of the contract

(1) Contract scope:

_ _ _ _ _ _ _ According to the requirements of design drawings and tender list, all supporting facilities of hydropower project will be built.

(2) Contract content: All items required by design drawings, change documents and bidding list belong to Party B's contract content.

Fourth, the project quality requirements:

(1) Carry out the construction according to the construction acceptance specifications, procedures and operating standards of hydropower installation project. After the acceptance by Party A's supervisor, it reaches the qualified standard.

(2) Party B must carry out the construction in strict accordance with the requirements of the construction design drawings and change documents. If the construction of various materials, models and specifications determined in Party A's bidding documents does not meet the requirements of design drawings, Party B will bear the loss of labor and material costs caused thereby. And the materials used must have qualified product certificates and inspection reports.

(3) Before and after the construction, Party B shall clean up the completed site, and cooperate with Party A to do the embedded installation in time. After Party A's construction, the repair cost caused by Party B's chisel delivery shall be borne by Party B, and Party A has the right to deduct it from Party B's labor contract. Party B shall repair and clean up public health free of charge.

Verb (abbreviation of verb) construction cycle:

The total construction period of this project is _ _ calendar days, and Party B must complete the civil works 20 days in advance according to the requirements of Party A's construction progress.

VI. Contract Price:

Based on the design and construction drawings of water, electricity, heating and installation provided by Party A, with reference to the requirements of change documents and the bidding bill of quantities as the standard.

Seven. Payment method:

Payment according to the progress of this project: for every two floors, Party B will send them to the constructor for review within 1 days, and 80% of the progress payment will be paid within 3 days after Party A confirms them. After the project is completed and accepted, 95% of the total price will be paid within 5 days after handing over the acceptance procedures to Party A, and the remaining 5% will be paid in one lump sum after the warranty period of water and electricity expires.

Eight, safety responsibility:

Party B must carry out the construction in strict accordance with the specifications for hydropower installation and construction and safety operation procedures. Observe all safety rules and regulations. The cost of safe operation is included in the contract unit price of this project, and Party B shall bear the responsibility for unsafe accidents and economic losses caused by Party B's personnel in the construction process ... Party B shall also bear the responsibility for unsafe accidents and any economic losses caused to others due to other reasons.

Nine. Responsibilities of both parties:

Party A:

(1) Provide relevant documents such as engineering construction drawings, design change documents and bill of quantities;

(2) Provide technical management and guidance for on-site construction.

Party B:

(1) Party B is responsible for the accommodation of workers.

(2) Responsible for all machines and tools used in construction.

③ Self-provided safety protection articles.

(4) Any expenses for overtime work at night due to the construction period.

⑤ Go through the completion acceptance formalities of hydropower installation project, and the expenses shall be borne by Party B. The formalities shall be delivered to Party A 10 days in advance for completion acceptance.

⑥ If it cannot be completed on schedule, Party A has the right to hand over part of the project to others for construction, and the cost of construction materials shall be borne by Party B..

X. liability for breach of contract:

(1) If the construction quality of Party B fails to meet the qualification requirements, Party B shall unconditionally rework it until it is qualified, and the labor and material costs arising therefrom shall be borne by Party B. ..

(2) If the construction period is delayed due to Party B's shortage of construction personnel, Party A shall be fined RMB per day, and Party A shall have the right to terminate the contract when necessary, and the losses caused thereby shall be borne by Party B. ..

(3) If Party A does not pay regularly, Party B will not be responsible for the project delay.

XI。 Matters not covered in this contract shall be settled by both parties through consultation.

12. This contract is made in triplicate, with each party holding one copy, and shall come into effect after being signed by both parties. After the payment is settled, it will automatically become invalid.

Thirteen. Signing place: _ _ _ _ _ _

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

20___ _ _ _ _ 20__ _ _ _ _ _ _

Water and electricity contract sample 4 Party A: _ _ _ _ _ (owner)

Party B: _ _ _ _ _ _ _ (contractor)

According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC), the Contract Law of Construction Projects and other relevant laws, regulations and rules, and following the principles of equality, voluntariness, fairness and good faith, both parties reached an agreement on the construction of the water and electricity meter installation project of this project.

I. Overview of the Project:

Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project content: Installation of water and electricity meters.

Construction site conditions: subject to the actual site conditions;

Construction site: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Second, the project contracting mode, scope and content:

1. Contracting method: contracting for work and materials.

2. Scope and content of the contract: Water and electricity meters will be installed on the top floors of Buildings 3# 2, 3, 4 and 6 (see the project budget for details).

III. Term of the contract:

1. Party B shall organize the construction in strict accordance with the time limit required by Party A to ensure the smooth realization of the time limit objectives. This contract stipulates that the total construction period of this project is 10 calendar days; The commencement date is _ _ _ _ _ _ _ _ _ _.

2. Party B must obey and carry out the arrangement of Party A. ..

Fourth, the quality standard:

This contract stipulates that the quality of this project must meet the "qualified" quality standard. If the quality is unqualified, Party B shall be responsible for rework, and all expenses such as materials and labor required for rework shall be borne by Party B. ..

Verb (abbreviation for verb) Measurement of contract price and quantity:

1, this project is the contractor, and the lump sum price is _ _ _ _ _ _ _.

2. According to the actual situation of engineering change, both parties shall sign the engineering change in written form.

Payment of construction funds and quality deposit by intransitive verbs:

1. After the project is completed and accepted by Party A, Party B shall hand over all the project completion data. Party A shall pay _ _ _ _ _% of the total contract settlement price within _ _ _ _ days from the date when Party B pays the 5% quality deposit. After one year (calculated from the date of project completion), Party A shall pay Party B interest-free in one lump sum.

2. If Party B's project quality, time limit for a project and safe and civilized construction fail to meet the standards agreed in this contract, Party A has the right to postpone the payment for the project until Party B completes the rectification as required by Party A.. All expenses arising therefrom shall be borne by Party B, and Party B has no objection to this.

Seven. Controversy:

Compensation for losses and damages caused by breach of contract or termination of contract shall be settled by the client and consultant through consultation; If no agreement can be reached, it can be submitted to the relevant competent department for mediation; If negotiation or mediation fails, a lawsuit shall be brought to the people's court.

Eight. Entry into force of the contract:

1. This contract shall come into effect after Party A is signed or sealed by legal persons or entrusted agents of both parties. This contract is made in quadruplicate, with Party A and Party B holding two copies respectively.

2. Matters not covered in this contract shall be settled by both parties through consultation.

Party A (signature) _ _ _ _ _ Party B (signature) _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Water and electricity contract sample 5: _ _ _ _ _ _ _

Contractor: _ _ _ _ _ _ _ _ _

According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC), the Law of People's Republic of China (PRC) on Work Safety and other relevant laws and administrative regulations, the principles of equality, voluntariness, fairness, honesty and trustworthiness are followed. The Employer and the Contractor have reached an agreement on the construction of this construction project through consultation. In order to ensure the quality of the project, ensure the progress of the project, improve economic benefits and clarify the responsibilities of both parties, the following agreement is reached through consultation between the two parties. I hope both sides can abide by it.

I. Overview of the Project:

Project name: _ _ _ _ _ _ _ _ _ _ _

Project location: _ _ _ _ _ _ _ _ _ _ _

Scope of contract: hydropower installation project and weak current part, clean up the construction waste generated by itself, and be responsible for the working hours of stolen wires and damaged water supply and drainage pipelines after installation. (Before the water supply pipe is installed in the water meter, the drainage pipe and rainwater pipe are installed in the drainage well and drain ditch, and the electrical part is installed in front of the water meter, and the power supply is connected. Increases or decreases are not counted. Main water supply pipe and bridge opening are reserved and filled. Weak box installation, weak wire box installation, switch socket installation, civil air defense hydropower installation, etc. Scope of hydropower construction drawing. )

Second, the general situation of contracting:

The contractor does not pack the materials, but brings his own tools, which are not provided by the employer.

Third, the quality requirements:

The contractor must carefully organize the construction in strict accordance with the construction drawings and construction specifications.

After the completion of each sub-process, the contractor shall report to the employer, the employer and the supervision unit for one-time acceptance after self-inspection. If the acceptance is unqualified, the contractor shall be responsible for rework, which will affect the next working procedure and cause economic losses. The warranty cost is 5%, and the warranty period is within two years after the final inspection.

Fourth, the time limit for a project requirements:

The contractor must complete the civil works at the same time. If the construction of the next type of work is affected due to intentional stoppage, the employer has the right to terminate the contract and find someone else to do it, but only 20% of the completed works can be paid. If it is not completed on time, it will bear all economic losses.

Verb (abbreviation for verb) Contract unit price:

According to the construction area: basement 19902M, 19.00 yuan /M, 6 102M, 6.00 yuan per square meter, and the above total price is 4 14750 yuan only.

Terms of payment for intransitive verbs:

1, the progress payment shall be paid 50% according to the actual completed quantities, 20% after reaching the preliminary inspection standard, 20% after the final inspection, 5% after the key is handed over, and the quality guarantee money shall be returned within two years after the acceptance.

Seven, the construction site material management:

The materials used by the operation team to enter the site must be uniformly arranged by the site management personnel and the owner, and must be used according to the drawings and materials of the designated brand. If the contractor changes the brand without authorization, all losses caused shall be borne by the contractor.

Eight, safety responsibility:

The contractor shall abide by the provisions on safety production management in engineering construction, in strict accordance with

Organize construction according to safety standards, accept supervision and inspection carried out by industry safety inspectors according to law at any time, and take necessary safety protection measures to eliminate hidden dangers of accidents. Abide by and implement the Regulations on Administrative Penalties for Work Safety on Construction Site and other rules and regulations formulated by the Owner.

The contractor shall bear all economic and legal responsibilities for safety casualties caused by ineffective safety protection measures or illegal command in the construction process, and the employer shall not bear any legal and economic responsibilities arising therefrom.

Nine, the contractor's responsibility:

1. Operators in this group must be restrained. Whoever takes things from the construction site without the consent of the person in charge shall be punished according to the theft value 100 times. Fighting between operators is not allowed in the construction site, which will affect the company's image. Offenders are fined 2000 yuan, and are not allowed to urinate anywhere on the construction site. Offenders are fined 2000 yuan.

2, the contractor must obey the employer's arrangement and command, abide by and implement the employer and supervision of the relevant management rules and regulations and measures.

3. Employees led by the contractor must abide by local government departments and relevant laws and regulations. If any personal accident occurs locally and outside the construction site, the contractor shall be responsible for it.

Eleven, reward and punishment system:

1. If the contractor causes engineering quality accidents and rework in the construction process, the employer will punish the contractor according to three times the total cost of the physical objects.

2. If the construction progress is not carried out under normal circumstances, the penalty will be 1000.00 yuan for each day of delay.

3. The actual time limit for a project shall be implemented according to the requirements of the Employer, and the Contractor shall comply with it.

XI。 Related matters:

1. If the contractor subcontracts the contracted project to others without permission, the contract will be charged. There is no contractual relationship between the contractor and the employer.

2. The contractor must have replacement personnel to manage the construction site during daily working hours and deal with problems in the construction process.

3. This contract is made in duplicate, each party holds one copy, which has legal effect from the date of signing and will automatically become invalid after completion.

Employer: Contractor:

Tel: Tel:

Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Water and electricity contract sample 6 Party A:

Party B:

In accordance with the provisions of the Economic Contract Law of the People's Republic of China, the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties have reached an agreement on the civil engineering contracting of the hydropower station in _ _ _ _ _ _ _ _ _, and concluded this contract:

I. Overview of the Project

1, project name: _ _ _ _ civil engineering

2. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Project cost: about _ _ _ _ _ ten thousand yuan (subject to actual settlement).

Second, the scope of contracting.

General contracting of civil engineering.

Third, the way of contracting.

This project is based on the construction drawings provided by the construction unit, and the actual contracted materials, construction period and safety.

Four. Commencement and completion dates

1. The start date is _ _ _ _ _ _ _ _. (Subject to Party A's written notice)

2, the contract period, according to the provisions of the national time limit for a project, the effective time limit for a project is 300 days.

Verb (abbreviation of verb) engineering quality and acceptance

1, this project is qualified according to the design requirements and acceptance specifications. The pursuit of Excellence.

2. The contractor must carry out the construction in strict accordance with the construction drawings and the construction project specifications and standards promulgated by the state, strictly implement the construction specifications and operating procedures, and accept the supervision of the employer and the supervisor.

3. The materials purchased by the contractor must provide quality certificates or pass the inspection according to relevant regulations before they can be used in the project. Materials shall be purchased by Party B and signed by Party A. ..

4. The basis of project completion acceptance is the Interim Provisions on Acceptance of Capital Construction Projects promulgated by the state, the Code for Acceptance of Project Completion and the completion acceptance provisions formulated by relevant state departments. Party B shall submit a written report on the acceptance time of the project and complete and complete acceptance materials. Party A shall organize the acceptance within the time specified by the state.

5. Before the project is completed and handed over to Party A, Party B is responsible for protecting all facilities of the new project. Quality problems or improper protection, rework or delay in construction period or economic losses caused by Party B shall be borne by Party B. ..

6. If the project is excellent, Party A will reward Party B with% of the total project cost.

Settlement method of intransitive verbs

1. The contract project shall be settled according to the actual situation, and the budget quota for water conservancy and hydropower construction projects in Hunan Province shall be implemented for settlement. If there is a new water conservancy and hydropower budget quota in Hunan Province, it shall be implemented according to the new quota.

2. The adjustment of labor wages and materials shall be carried out according to the latest relevant documents of Hunan Province and the quarterly documents of _ _ county quota station.

3. The project settlement of this contract is reduced by _ _ _% according to the above quota (labor wages are not reduced).

Seven, project payment

After the contract comes into effect, Party A shall issue a written notice of mobilization, and Party B shall pay _ _ _% of the startup project cost as mobilization fee within three days after mobilization. Within three days after Party B improves the temporary facilities, Party A will allocate _ _% of the cost of the started project as the reserve fund, and then allocate 75% of the monthly progress payment. And so on. Pay _ _ _% of the total cost of the construction project within 30 working days after the completion acceptance settlement, and the remaining _ _ _% shall be used as the warranty fund, and the warranty period shall be implemented according to the provisions of the state. The wage security deposit and work-related injury insurance for migrant workers shall be implemented in accordance with the relevant provisions of Hunan Province.

Eight. Responsibility of both parties

1, Party A's responsibility

Be responsible for organizing Party B's technical personnel to make disclosure and joint review of technical documents such as construction drawings of this project; Assist Party B in selecting temporary facilities and sites for the project construction; Accurately provide leveling points and elevation control points used in construction; Provide geological data, drawings, electricity and water for construction; Assign the site representative to assist the supervisor in checking the progress, quality and safety of the project and concealed works, handle the acceptance and technical visa in time, and issue a change notice to Party B in time for the changes in the construction process; Responsible for coordinating the relationship between all parties, handling construction application, construction permit, site temporary facilities removal and other related procedures to ensure the normal construction; Be responsible for solving the living places and building materials storage places of Party B's migrant workers, and do a good job in safety; Pay the project payment in time according to the contract.

2. Party B's responsibilities

Organize capable personnel to carry out construction; Submit the construction organization design and project progress plan to Party A within the specified time; Prepare the construction plan and construction safety measures; Submit concealed engineering acceptance notice, monthly progress report, completion acceptance report, completed settlement book and related materials within the specified time; Carry out construction in strict accordance with the specifications, pay attention to civilized construction, and do a good job in the investigation of potential safety hazards. The contractor shall bear all safety accidents caused by the contractor; The contractor shall not subcontract the whole project to others; Complete the construction task with good quality and quantity on schedule.

Nine. responsibility for breach of contract

1. After the signing of this contract, if the project cannot be started or the contractual obligations cannot be fulfilled due to Party A's reasons, it shall bear the liability for breach of contract according to the Economic Contract Law of the People's Republic of China.

2. After the signing of this contract, if the project can't be started and completed as scheduled, can't be completed according to the agreed quality standards, or can't perform its obligations according to the contract, Party B shall be liable for breach of contract according to the Economic Contract Law of the People's Republic of China.

X. Supplementary provisions:

1. Matters not covered in this contract shall be implemented with reference to the general contract terms.

2. Party B shall pay Party A the performance bond of RMB10,000.00 Yuan. This contract shall come into effect after being signed or sealed by both parties, and the remaining RMB _ _ _ _ _ _ _ _ _ _ _ _ _

3. After this contract comes into effect, if there are any matters not covered, both parties can sign a supplementary agreement as an annex to this contract through negotiation, and the supplementary agreement has the same legal effect.

4. In case of disputes arising from the performance of the contract, both parties can negotiate and mediate. If negotiation fails, a lawsuit may be brought to the people's court.

5. This contract is made in quadruplicate, with each party holding two copies.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _