Knowledge of hydropower decoration of blank houses:
1, in the process of construction, try to reduce unnecessary joints of the pipe body in the wall, and there is no way to connect the faucet, bathroom and basin. All threads of pipe connection joints are wrapped with hemp yarn and white paint, tightened and distributed in place vertically and horizontally. When there is a ground pipeline crossing, the secondary pipeline must be installed under the main pipeline to keep the whole water pipe distributed on a horizontal line.
2. Precautions for the decoration of rough houses: sewer pipes and floor drains must be installed in all places where water flows, and pvc pipes must be coated with special pvc glue when connected. And pay attention to the horizontal drop connected with the main sewer pipe embedded in the original blank house, and keep it still for 6 hours.
3. Precautions for the decoration of rough houses After the pipes are allocated in place, the pipes must be clamped with pipe clamps at the corners or places with vertical taps to prevent looseness. Special pipe clamps are required for water pipe fixing.
Find Hu Jia to decorate when decorating. Hu Jia adheres to the principle of customer satisfaction and is guided by brand reputation; Based on outstanding talents and green home improvement; With excellent engineering quality as the guarantee and honest service as the support, we will create a high-quality living environment for decoration owners.