Bid filing materials?

What information is needed for bid filing? How to deal with it? The following is the introduction of the main contents of the bidding filing materials brought by Zhong Da Consulting for your reference.

Process and required information

Preliminary design review (5 working days)

1. Application:

2, the Planning Commission for the record notice or approval (copy);

3, planning approval plan general plan (original inspection, a copy must be stamped with the official seal of the construction unit);

4, survey and design contract (copy);

5. Preliminary design documents: two elevation renderings, one preliminary design description and one set of preliminary design drawings (including general plan 1, preliminary design drawings 1, final design drawings 1, preliminary design drawings 1, preliminary design drawings 1.

TV

Preliminary design drawing of broadcasting system 1 copy (weak current design drawing is used to replace the preliminary design drawing, and there is no special TV broadcast), lightning protection drawing 1 copy (project with building height of 80m), ground water supply plan of transfer water tank (pool) and geological survey report 1 copy.

6. Electronic documents of preliminary design documents include a full set of preliminary design drawings, design descriptions and renderings.

7 residential projects should be reported to the household statistics.

Two, building energy efficiency review for the record (5 working days)

Building Energy Conservation Review Record Form

Building energy-saving design drawing

Calculation sheet of building thermal design

Three, construction drawing design review for the record (3 working days)

(), administrative reconsideration

Notice of project establishment (copy)

Administrative review opinions issued by fire protection, planning, environmental protection, radio and television departments (copy)

Original design contract and qualification certificate (copy)

Original survey contract and qualification certificate (copy)

(2) Technical review

1, 3 originals of the report on the examination and filing of construction drawing design documents of construction projects.

2. The original certificate and the original construction drawing review report 1 copy.

3, review the original contract and qualification certificate (copy)

4, the original "building energy efficiency design review registration form".

5. construction site plan (with the seal of the censor) (copy)

Four, bidding supervision for the record

(a) the state (government) investment project comparison and supervision for the record (that is, to be done)

1, valid project approval document of the project approval department (original or stamped with the candidate's fresh stamp)

2, construction drawing design documents review notice (copy)

3. Comparison and selection of original agency contracts (provided by comparison and selection)

4. Entrustment contract for the preparation of bill of quantities and tender control price (original or stamped with fresh seal of the candidate)

5 comparison or prequalification announcement or election invitation (original or stamped with a new comparison seal)

6. Full set of prequalification report (original or stamped with the new seal of the candidate)

7. Pre-qualification and election invitation or election invitation (original or stamped with the fresh seal of the candidate)

8. Full set of comparison documents (original or stamped with the new seal of the candidate for comparison)

9. Notice of submission of comparison and selection documents (copy)

10, full set of selection report (original or stamped with fresh seal of candidate)

1 1. Proof of notification materials for selecting candidates.

12. Select the original notice (another volume)

13, original construction contract (another volume)

14, full set (fascicle) copies of ancestral election documents.

(two) the national (government) investment project bidding supervision record information (that is, to do)

1, valid project approval document of the project examination and approval department (original or stamped with the new seal of the tenderer)

2, construction drawing design documents review notice (copy)

3. Original bidding agency contract (provided by entrusted bidding) (original or stamped with the new seal of the tenderer)

4, the bill of quantities and tender control price preparation of the entrustment contract (original or stamped with the fresh seal of the tenderer)

5, tender announcement or prequalification announcement or invitation to bid (original or stamped with the fresh seal of the tenderer)

6. Full set of prequalification report (original or stamped with the new seal of the bidder)

7. Pre-qualification and bid invitation letter or bid invitation letter (original or stamped with the new seal of the bidder)

8. Full set of bidding documents (original or stamped with the new seal of the bidder)

9, the tender documents for the record notice (copy)

10, complete set of bid evaluation report (original or stamped with the new seal of the tenderer)

1 1. Proof of notification materials for bidding candidates (original or stamped with the new seal of the tenderer)

12, original bid-winning notice (another volume)

13, original construction contract (another volume)

14, the bidder's complete set of (another) bid documents.

(3) Non-state-owned investment objectives for the record (i.e. to be done)

1, valid project approval document of the project approval department (original)

2, construction drawing design documents review notice (copy)

3. Original bidding agency contract (provided by entrusted bidding) (original or stamped with the new seal of the tenderer)

4, the bill of quantities and tender control price preparation of the entrustment contract (original or stamped with the fresh seal of the tenderer)

5, the bidding agency qualification certificate (copy)

6, the composition of the bid assessment committee (original or stamped with the fresh seal of the tenderer)

7. Bidder's qualification certificate (copy with new seal of the tenderer)

8, the project manager qualification certificate (copy and stamped with the fresh seal of the tenderer)

9. Original bid notice (another copy)

10, original construction contract (another volume)

(4) Exemption from bidding for filing information (that is, to do it)

1, valid project approval document of the project approval department (original)

2, construction drawing design documents review notice (copy)

3, the contractor qualification (copy)

4, contracting project manager qualification certificate (copy)

5, the contractor's safety production license (copy)

6. Exempt from the original bid report (another volume)

7, the original construction contract (separately)

Five, the new wall materials review opinions (that is, do)

1, construction drawing review notice

Six, the construction fee approved (that is, do)

1, construction drawing design document review notice (copy)

2. The construction unit applying for reduction or exemption of construction fees shall also provide written materials that meet the statutory conditions and standards.

3, according to the specific circumstances of the construction project, require the construction unit to provide its information.

Seven, construction engineering quality and safety supervision and supervision for the record (that is, do)

1, general plan for planning approval

2. Project approval

3. Tender announcement: (1) national (government) investment projects; Notice of bid filing and bid-winning notice (2) Non-state investment projects; Receiving the reply of bidding report and bid-winning notice (3) exempting the bidding project; Notice of exemption from bid filing

4. Construction contract

5, building materials testing contract

6, fire review opinions

7, supervision contract

8. Design contract

9. Survey contract

10 notice and report on review of construction drawing design documents

1 1, construction contract filing form of construction project

12, payment of construction fees for construction projects, notice of charges for some administrative toll stations or unified charge letter for new project procedures (Development Zone)

Eight, safety record (5 working days)

1, civilized construction responsibility book 1 in duplicate (for each building) Note: The signing date of the responsibility book shall be filled in by the safety supervision station.

2. Safety Supervision Filing Form 1 in triplicate (for each building) Note: The filing date shall be filled in by the safety supervision station.

3, construction safety conditions audit table 1 in duplicate (each building)

4, the construction unit safety production certificate (copy)

5.65,438+0 agreements on increasing the cost of safe and civilized construction and safety measures.

6. 1 safety supervision filing project information sheet (each building)

7. The construction unit that has completed the filing must be equipped with a site according to the requirements of safety supervision and filing instructions.

Nine, the issuance of construction permits (5 working days)

1, fill in the "construction permit application form" project owner unit seal,

2, the bid-winning notice (original) bidding (filing) information receipt reply notice (original)

3, construction land procedures (copy)

4, the construction project planning permit and accessories (including a copy of the permit and the general plan.

5, "construction drawing design documents review qualified book" and "review notice" (copy)

6, supervision contract, chief supervision engineer post certificate (copy), project manager qualification certificate (copy) construction contract (original copy)

7, the construction unit, construction unit, supervision unit sign and seal the construction organization design countersign (original)

8, migrant workers wage deposit or guarantee

9. Proof of construction project funds issued by the bank (original)

10. Bank statement (copy) of the construction unit for prepayment of project funds (note: 25% of the annual project funds for prepayment of project funds are calculated as 365 days per year).

1 1, family planning responsibility book (this responsibility book is signed and sealed by the construction unit in triplicate)

12, enterprise safety production license (copy)

Note: construction commitment letter; (1) The qualification certificate of the project manager must be written to the project manager specified in the tender and contract.

(2) The builder's post certificate shall be calculated according to the scale of 3000㎡ for which the builder is responsible, and the number of certificates shall be issued.

(3) The project scale must be equipped with full-time security officers, and the post certificate of security officers exceeds 10000㎡.

Note: On the premise that the information is complete and meets the requirements, set the commitment time limit.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd