How to write the power engineering quality assurance contract?
Employer: Contractor: In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, both parties have entered into this contract on this construction project through consultation for mutual compliance. I. Project Overview 1. Project name: 2. Project location: 3. Scope of work: (see the construction drawings for details); 4. Contract method: _. 5. Supplementary explanation of materials and technology (see the construction drawing for details). 2. The contract duration and the delay of the duration are 1. Commencement date: year month day, completion date year month day, total days of contract period (from actual commencement date); 2, due to the responsibility of the contractor failed to complete according to the date stipulated in this contract, the contractor shall pay _ _ _ _ _ _ _ _ 3. The construction period is delayed due to the following reasons: a. The Employer fails to provide (or confirm) the construction drawings and commencement conditions as agreed; B the employer fails to pay the project advance payment and progress payment on the agreed date; C the owner's representative (or supervision engineer) fails to provide instructions, approvals, etc. Agreement, so that the construction can not be carried out normally; D. design change or increase of engineering quantity; E. Water supply, power failure and gas stoppage caused by reasons other than the Contractor have accumulated for more than hours; Force majeure; G. the shutdown caused by other reasons other than the contractor has accumulated more than hours. 4. The contractor shall report the delayed construction period to the employer's representative (or supervision engineer) in written form within the day after the above-mentioned situation occurs; The employer's representative (or supervision engineer) shall confirm the report within the day after receiving it. If it is not confirmed within the time limit, it shall be deemed as agreeing to postpone the construction period. Three. Quality standard Engineering quality standard: It is qualified according to the Code for Acceptance of Construction Quality of Steel Structure Engineering. Four. Total contract price (in words) (RMB), in figures ¥. V. Settlement and payment of project funds 1. Within days from the date of entry of the main steel structure, the Employer shall pay the progress payment of the total contract price of the project to the Contractor; 2. Within days from the date of completion of the main structure, the Employer shall pay the progress payment of the total project contract price to the Contractor; 3. Within days from the date of project completion, the Employer shall pay the progress payment of the total project contract price to the Contractor; The contractor shall issue a bank guarantee for the total contract price of the project to the employer as the warranty money, and the employer shall return it to the contractor within one year; Intransitive verb construction preparation 1. The contractor shall complete the design and improvement of drawings free of charge within the day after signing the contract. After the completion, the owner shall submit it to the design institute, and the contractor shall cooperate to participate in the technical disclosure to make the drawings pass. 2. Before construction, the owner shall be responsible for the work of "three links and one leveling", provide benchmark measuring points and provide water and electricity for construction free of charge; 3. The employer shall complete the formalities of project submission and drawing signing, and coordinate the relationship between the surrounding areas and relevant departments; 4. The contractor shall complete the processing of the main components and transport them to the construction site within the day after receiving the drawings that have passed the examination. 5. The contractor shall purchase and process materials in strict accordance with the construction drawings, and provide quality assurance for main steel and color steel plates; Seven. Safety construction and inspection 1. The contractor shall abide by the management regulations on safety production in engineering construction, organize the construction in strict accordance with safety standards, and accept the supervision and inspection carried out by industry safety inspectors according to law at any time, and take necessary safety protection measures to eliminate hidden dangers of accidents; 2. The employer shall provide safety education to its employees on the construction site. The employer shall not require the contractor to carry out the construction in violation of the safety management regulations, and the employer shall bear the corresponding responsibilities and expenses if a safety accident is caused by the employer; 3. In case of a safety accident, the contractor shall immediately report to the relevant departments, and notify the employer in accordance with relevant regulations, and handle it according to the requirements of relevant government departments, and the expenses incurred shall be borne by the party responsible for the accident; 4. When the employer and the contractor have disputes over the responsibility of the accident, they shall be handled according to the determination of the relevant government departments. Eight. Project completion acceptance and warranty 1. Within three days before the completion of the project, the contractor shall notify the employer in writing of the acceptance date. If the Employer is unable to attend the acceptance on schedule, it shall notify the Contractor in advance, and agree on the acceptance date with the Contractor separately, but the Employer must acknowledge the completion time of the Contractor. If the Employer delays the acceptance, the losses such as management fees incurred during this period shall be borne by the Employer; 2. If the Employer fails to raise any objection after receiving the acceptance notice from the Contractor, but fails to organize the acceptance on schedule or the Employer uses it in advance, it shall be deemed as qualified; 3. The project shall be handed over within three days from the date of acceptance of the completed project. If the Employer fails to take over, the project losses shall be borne by the Employer; 4, the project has been basically completed, in case of a certain material or equipment can not be solved by both parties, resulting in the project can not be completed on schedule, can be reduced to completion, and the completed project for completion acceptance and handover procedures; 5. Within one year from the date of project completion acceptance, the contractor is responsible for the free warranty of the project. After the warranty period expires, the contractor shall provide lifelong preferential services. Nine. On-site representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ X. When the defaulting party breaches the contract, unless otherwise agreed in the preceding paragraph, the defaulting party shall pay RMB10,000 yuan as liquidated damages. XI。 Dispute Resolution Both parties agree that in case of any dispute arising from the performance of this Contract, both parties shall settle it through negotiation in time; If negotiation fails, either party shall bring a lawsuit to the people's court. 12. Supplementary clauses For matters not covered in this contract, both parties can negotiate supplementary clauses according to specific conditions and relevant regulations, which are attached to this contract and have the same effect as this contract; This contract shall come into effect after being signed and sealed by both parties, and shall be made in quadruplicate, with the Employer and the Contractor holding two copies respectively, with the same legal effect. The documents constituting this contract include: 1, this contract 2, standards, specifications and related technical documents 3, drawings 4, and written agreements or documents related to project negotiation and changes between the two parties. This contract is concluded on page _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _