First of all, please note the following points:
1. Before filling in this application form, please read the instructions carefully and fully understand the meaning of relevant contents;
2. The parties must fill in the form correctly, clearly and truly in Chinese characters;
Please fill it in black ink with a signature pen and a brush. If there are any changes, please sign the changes and confirm with your finger. Modifying with correction fluid is not allowed.
4. The parties concerned shall be responsible for the truthfulness, legality and validity of the information filled in and sign it in person; 5. If quantity, date and serial number are involved in the table, Arabic numerals should be used.
Second, how to fill in the columns
(a) how to fill in the "applicant information column":
1. Name: fill in the name of the applicant.
2. Identity: the applicant for the initial registration of ownership shall fill in the "applicant" himself, and the "agent of the applicant" if not himself.
3. Type of certificate: fill in the type of certificate to be used in the application, such as "resident ID card" and "passport".
4. Certificate number: fill in the number of the certificate used in the application, such as the ID number.
5. Share: fill in "individual ownership" and "* * * with * * *". If it is * * *, fill in the specific share in the form of scores, such as 1/3, 1/2, etc.
6. Household registration: natural persons should fill in "this city", "outside this province", "other provinces and cities", "Hong Kong, Macao and Taiwan" and "overseas" according to the type and location of the industrial and commercial registration of the institution.
(2) How to fill in the "Contact Information of the Applicant"
1. Contact name: fill in the name of the contact person determined by the applicant, one or more people can be filled in, and the first line is the default contact person.
2. Contact telephone number: fill in the mobile phone or fixed telephone number that is easy to contact during working hours.
3. Contact address: fill in the contact address of the applicant.
4. Postal Code: the postal code of the contact address.
(three) how to fill in the "application content column":
1. Project name: fill in the project name.
2. Completion time: fill in the completion time of the project.
3. Location of the house: fill in the specific geographical location of the house, specifically referring to the location of the house determined by the relevant departments (such as the public security department) according to law, generally including the street name and house number. Such as "No.4 Chengmen West Road, Chancheng District, Foshan City".
4. Building structure: According to Appendix A5 of People's Republic of China (PRC) * * * "Classification of Building Structures" and China Property Survey Code (GB/T 17986. 1-2000), the building structure can be divided into steel structure, steel and reinforced concrete structure, reinforced concrete structure and mixed structure.
5. Planned use: fill in the construction project planning permission document and the house use specified in the attached drawings.
6. Real estate: fill in the real estate, including: market-oriented commercial housing, resettlement housing, supporting commercial housing, public rental housing, low-rent housing, price-limited ordinary commodity housing, affordable housing, fixed-sale commercial housing, fund-raising housing, welfare housing and others.
7. Total floors of the building where the house is located: fill in the natural total floors of the building where the house is located. There are underground or semi-underground floors, which are included in the total number of floors. If there are 10 floors above ground and 2 floors underground, the total number of natural floors is 12.
8. Floor above ground: Fill in the natural floor above ground of the building where the house is located.
9. Underground floor: fill in the natural underground floor of the building where the house is located.
10. Total construction area: Fill in the house surveying and mapping report and record the total construction area of each basic unit applying for registration.
1 1. Total interior construction area: Fill in the house surveying and mapping report and record the total interior construction area of each basic unit applying for registration.
12. Land use right certificate number: fill in the land use right certificate number of the house where the application for registration is made.
13. Building proprietary information: If you need to list the specific information of each proprietary part, check "See Building proprietary information for details" and fill in the list of building proprietary information.
14. All conditions of building zoning: If a house has all conditions of building zoning, check "See the list of building zoning for details" and fill in the list of building zoning.
15. According to the actual situation, choose to apply for the initial registration of house ownership on the grounds of "self-built house by unit", "newly built commercial house", "self-built house by individual" or "others". If "other" reasons are selected, the reasons for applying for registration shall be indicated at the back. 16, Remarks: Fill in the contents that the applicant needs to make remarks.
17. Signature of the applicant (agent): The applicant (agent) shall sign the contents of the application for confirmation. According to the requirements of 4.2.7 of the Technical Specification for the Registration of Real Estate, a natural person shall confirm with his signature or the fingerprint of his right thumb or forefinger, a legal person shall confirm with the seal of the legal person, and other organizations shall confirm with the seal of the organization.
18. application date: the date of filling in the form, with the format of "XX, XX, XX", such as "2065438+July 4, 2005".