Introduction of jingtu Huaihe river bridge?

The Jingtu Huaihe River Bridge was completed and opened to traffic in August 2004. Located in the southeast of Huaiyuan County, on the Huaihe River section between Jingtu Mountain and Tuer Mountain. The bridge has a total length of 8 18m, a width of 23m and four lanes in both directions. The bridge approach is 9.02km long and the main bridge spans 3 spans. The bridge type is prestressed concrete continuous rigid frame. The total investment of the project is about 200 million yuan.

The Jingtu Huaihe River Bridge is located in the Jingshan Gorge, which is known as the "Three Gorges of Huaihe River" and spans the Huaihe River. Anhui Huaiyuan Jingtu Huaihe Bridge Construction Co., Ltd., jointly funded and invested by a number of private enterprises in Zhejiang Province, was designed by Anhui Highway Survey and Design Institute and undertaken by Tianjin Urban Construction Group Third Engineering Company. It was completed in 2004 with a total investment of 229 million yuan. It is a four-lane city highway bridge with a width of 23 meters. The main bridge is a three-span prestressed concrete continuous steel structure, which is the longest bridge on the Huaihe River. Jingtu Huaihe River Bridge connects Jingshan Mountain and Tushan Mountain, a provincial scenic spot in Anhui Province, ending the history of confrontation between Jingtu and Ershan across the river. At the same time, the organic connection of G206 National Road, Anhui S307 Provincial Road and S225 Provincial Road in Huaiyuan County has further improved the road network layout on both sides of the Huaihe River, making it faster and more convenient to cross and cross the Huaihe River, especially shortening the mileage of G206 National Road around Bengbu City by more than 20 kilometers, which is of great significance to promoting the economic development of Huaiyuan County and even the surrounding areas of Bengbu City and facilitating people's lives.

The Jingtu Huaihe River Bridge (hereinafter referred to as Jingtu Bridge), which spans the Huaihe River and connects Yuhui District of Bengbu City and Huaiyuan County, was officially opened to traffic on February 27, 2004, further narrowing the distance between transportation and economy and having a far-reaching impact on the economic integration of Bengbu City.

Jingtu Bridge spans the Huaihe River, connecting Jingshan Mountain and Tushan Scenic Area, organically combining the 206 national highway, 307 provincial highway and 225 provincial highway passing through Huaiyuan, and perfecting the road network layout on both sides of the Huaihe River. Han, vice chairman of Jingtu Huaihe Bridge Construction Co., Ltd., introduced that Jingtu Bridge is located at the gap of National Highway 206, and the total length of the bridge and its wiring is about 1 1km. It is connected to National Highway 206 in the north and Provincial Highway 307 in the west, which largely diverts short-distance transit vehicles within 200 kilometers of Hexu Expressway, Fu Jie-Bengbu Expressway, National Highway 206 and Provincial Highway 307. According to experts' assessment, the daily traffic volume after the bridge is opened. The opening ceremony and passage time of the bridge are on the 27th, but the toll station of the bridge was officially charged on New Year's Day in 2005.

Jingtu Bridge was built by Zhejiang private entrepreneurs in March 2002, with a total investment of about 230 million yuan. The bridge was officially started at +00 on June 25th, 2002 and completed in early February this year. The length of the bridge body is 818m, the width of the bridge deck is 23m, and the total wiring length exceeds 1 1 km. The design load of the bridge is more than 20 cars, 120 trailers, and the design speed is 60 kilometers per hour, which is a first-class urban expressway. 65438+February 65438+July, the bridge and wiring all passed the acceptance.