About 700- 1500, depending on the material selection and design;
General food factory workshop decoration to do color steel partition wall, part of the color steel ceiling; Some areas can have dust-free ceilings;
The ground, if the ground foundation is good, can be solidified, dustproof and self-leveling by purification workshop.
In terms of heating and ventilation, the general purification area must have air conditioning, and other areas can be based on the actual situation of customers.