How to find a new house decoration designer? House decoration steps?

When we buy a new house, we must design the new house first, and then decorate it. But our ability is limited, so we will invite professional designers to help us, but designers also pay attention to conditions. We must find a good designer to build a good home for us. When we buy a new house, we must design the new house first, and then decorate it. But our ability is limited, so we will invite professional designers to help us, but designers also pay attention to conditions. We must find a good designer to build a good home for us. Let me share with you how to find a new house decoration designer. House decoration steps?

How to find a new house decoration designer

Where can I find a designer: Generally, we are looking for a local decoration designer, so we can find a decoration designer in a local decoration company, but there are also many owners who want to find an independent decoration designer or design studio and don't want to get involved with the decoration company. This is more troublesome to find.

It's really difficult to find someone who can't lead the way. In this case, I suggest that you can decorate the app with big fish. This mobile phone application software can help us find these decoration designers who are usually not easy to find. The method is simple. After downloading and installing the Big Fish Decoration app, directly register and log in, select the local decoration design button to view the local decoration designers, and select the design studio to view the local design studio. If you want to find a foreign decoration designer, you can find a foreign decoration designer as long as you switch the location to another place. The operation is convenient, quick and simple. Friends who don't know where to find designers can try.

House decoration steps

I. Preparations

1, be familiar with drawings, communicate with designers in time, and provide reasonable suggestions for designers' schemes, so as to save materials and labor. Understand the designer's design ideas and have a clear understanding of the scheme.

2. Get familiar with the owner, know the owner's schedule, personal preferences, family members, education level and professional knowledge in detail, and keep the owner's contact information and current address, so as to facilitate the communication, coordination and cooperation between the customer and the company and the project manager and make the work more smoothly.

3, familiar with the foreman, have enough understanding of the foreman's ability, and make communication and corresponding guidance.

Tips: Don't underestimate the design scheme. A good design can help you save money and avoid detours!

2, approach preparation

Prepare image and engineering data. Entry documents: construction permit, number plate; Secretary's tools: pen and notebook; Door cover tools: door cover, scissors, transparent glue; Measuring and positioning tools: level meter, tape measure and chalk; Site layout tools: image cards, ruler cards, hammers, line cards, nails, etc. Sanitary appliances: broom, shovel, garbage bag.

3, in the construction

(a), plumber comes into play

1, water and electricity disclosure, disclosure for half a day in the morning, material preparation in the afternoon.

A, design, project manager, plumber, supervisor and owner should be present at the same time for disclosure and witness the commencement.

B, the designer guides the plumber to locate, including the position, quantity and use of switch sockets, and explains with various elements such as home room type, and the plumber marks the wall with chalk.

C, plumber blanking shall be purchased by the owner, and the whole package shall be purchased by the company, and the plumber shall be responsible for the matters needing attention, and the materials shall be prepared frequently in the afternoon to facilitate the plumber to formally start work tomorrow.

D, design or supervision should use level to locate horizontal and vertical lines, and post them? Switch unified elevation? 、? Horizontal alignment? Wait a minute. This trip is only for reference and site image building, and it is not afraid of practical significance. Construction personnel in each process shall be subject to their own measurement results.

E. The on-site project manager shall protect the user's finished doors and other articles, and post protective plastics. Hang the image card on the wall, and post the construction instructions, project progress, contact information of each person in charge, employee guidance, etc.

F. posting advertisements, photos, etc. Promote in a prominent position in the customer's home.

G, remind customers to choose ceramics, wall tiles and other supplies as soon as possible, so as to facilitate bricklayer's construction and reduce the preparation time.

2, plumbers in construction (about 3 days, and make an appointment with water and water pipes)

A, slotting the day before, slotting the wall positioned the day before, so as to facilitate the embedding of the conduit. Before grooving, use a spirit level to stretch the line vertically and horizontally, and the grooving depth should exceed the diameter of the conduit 1 cm or more.

B, the next day, arrange the pipelines, arrange the required pipelines in advance, and then slot at the intersection of pipelines to ensure that there is only one pipeline height on the ground, so that the pipelines will not squeeze each other and the appearance will be guaranteed.

C, threading on the third day, threading in turn. Paste the front tank with cement mortar, and then reinforce it with cement mortar where the pipeline is dense, so that the sand cement on the mud tile will not damage the pipeline.

D clean up the garbage bags at the designated place before leaving.

3, hydropower process quality inspection (1 day)

A, the water pipe supplier suppresses the water pipe, detects the water pipe pressure, and checks whether the water pipe leaks. 15 it is normal to drop a pressure, and there will be problems if it drops too much. After the attack, a warranty certificate should be issued to clarify the responsibility.

B, the supervisor checks whether the water and electricity direction is horizontal and vertical, whether the wire diameter can meet the power of the electrical appliances used (such as whether the air conditioning socket is a 4mm wire), whether the wires in the conduit are pulled, whether the use of the yellow wax tube is reasonable, whether the wires are connected, whether the exposed wires are neatly wrapped with electric tape and placed in the electric box.

C, please check the water and electricity, check the water and electricity construction and contract, put forward reasonable suggestions to meet or change, and explain the unreasonable requirements.

D show the owner the water and electricity acceptance sheet and ask the owner to sign it. After signing, take photos of the water circuit and file it.

E inform sand and cement suppliers to load sand and cement according to the area, tile size and leveling size. Pay the sand and cement if you don't sign it, and pay the money after filling it out.

(2), waterproof material comes into play (1 day)

1, waterproof to the specified position (height), balcony with water pipes should also be done.

2. Notify the arrival of ceramics and sanitary ware (squatting pan, water tank, floor drain), sort out the ceramic classification codes, sign and accept them by the owner, and accept the overall packaging by the supervisor.

(3), bricklayer comes into play (depending on the size of the house and the number of ceramic masonry period)

1. On-site disclosure of bricklayers, rules and methods for laying ceramic tiles, and leveling thickness.

2. Stick the kitchen wall tiles or balcony floor tiles first, and check the drainage of the bathroom. After 24 hours, please ask the property to open the downstairs door to check the waterproof effect.

3. Keep the water pipe close to the water pipe. The water pipe wrapping method needs the guidance of clay bricks to facilitate the laying of clay brick ceramics and ensure the beauty of ceramics.

4, the quality inspection of mud tile, first check whether diagonal laying level off, with or without dislocation, whether level off between edges and corners, with or without step feeling, caulking whether processing and cleaning. When leveling bubbles, it is necessary to deal with them smoothly, and whether the floor drain in the bathroom and balcony can be unblocked.

5. Domestic garbage can be bagged and stored in the designated place before leaving.

6. Please ask the owner to accept the mud tile project and sign the mud tile completion acceptance form for confirmation. And inform the owner to buy cabinets, doors, etc. Place an order and go to the company to choose the panel color.

(4), carpentry comes into play

1, woodworking preparation (1 day)

A, carpentry approach for disclosure, ceiling shape, height, shoe cabinet, wardrobe, background wall style for disclosure.

B, carpentry blanking, and notify the plate supplier delivery.

C, protect the finished product, lay protective foam on the ceramics, and lay carpet on the floor of the woodworking operation room.

2. Woodworking construction. (The construction period depends on the quantity of work)

3. Woodworking quality inspection

A, horizontal and vertical direction, carpentry must be straight and flat.

B. When the cupboard door is opened, it moves lightly and has no abnormal sound.

C, touch everywhere by hand without burr and smooth.

D, seam edge is smooth, no obvious sense of splicing.

E, if the design has no special requirements, the rotation angle must be 90 degrees.

F, clean up before leaving, bag and put in the designated location.

4. Invite customers to visit the site, because it is difficult to make changes after carpentry is completed, as long as it meets the design requirements and standards, it will not change. Please sign the woodworking acceptance form to confirm the next preparation.

(5), the painter comes into play

1. The painter shall cut the material and notify the paint supplier for delivery. (1 day)

2, the painter caulking first, then stick kraft paper, and then blow be bored with child. Putty should be scraped twice, dried and polished, and then scraped twice with latex paint.

3. Wood should be caulked first and then painted.

4, paint quality inspection

A, whether the wall, top and other parts are flat.

B. whether the latex paint is fully covered and whether there are any omissions.

C, whether the wood is shiny, whether the nail is convex or concave.

D, whether the panel is smooth.

5. Invite the owner to accept the painting and sign for confirmation. The painter can't leave until he has cleaned it up.

(6), finished product installation

1, notify the door, cabinet, wardrobe and other finished products to enter the site for installation.

2. Electricians should install non-main lights, such as switches and spotlights.

3. Arrange cleaning work and remove all construction waste.

Such detailed house decoration step four, general acceptance and delivery.

1. Invite the owner to conduct overall acceptance of the house and sign for confirmation.

2. Video archiving can be used for publicity.

3. Ask the owner to settle the final payment.

4, the construction party issued a warranty.

All the above knowledge about how to find a new house decoration designer and the steps of house decoration, I hope I can help you. When we are looking for designers, we must look at word of mouth and evaluation, find more designers and compare them. At the same time, we must have a certain understanding of the decoration steps of the house in order to better decorate the house.