Summary of assistant engineer's work

Time passes quietly in a snap of your fingers. We must have a lot of inspiration during this time. Let's take a good look and write a summary. So, how to write a new schema for abstracts? The following are the sample essays (7 selected sample essays) I collected for you. Welcome to read, I hope you will like it.

Assistant Engineer 1 Work summary time flies. It's been a long time since graduation. During this period of work, I not only deepened my understanding of the original knowledge, but also got a better understanding of the knowledge that I didn't touch or didn't touch deeply in previous books. Since my work, I have made great progress and gained great gains in my thoughts, studies and work through my own continuous efforts under the careful training and teaching of the unit leaders. The work is summarized as follows:

Ideologically, we should use Scientific Outlook on Development's guiding ideology, respect practice, go deep into practice, seriously study and solve problems in practice, and constantly improve our ability to understand and solve problems. Insist on seeking truth from facts, constantly improve their political and ideological awareness and level, and constantly explore and pursue. In xx, I joined the China * * * Production Party and became a China * * * party member.

In learning, I have been strict with myself since I joined the work, taking my work seriously and positioning myself well. Although the working conditions are very difficult, it is also an opportunity for us young people to exercise ourselves and challenge ourselves. Theory comes from the fact that life is higher than life and should be reduced to life. In this environment, there are still many good things worth discovering and studying. I always keep in mind that I should keep learning in my work and combine theory with practical work well. Constantly change yourself at work, put forward different requirements for yourself at the right time, constantly sum up experience at work, improve work ability, learn at work, and grow up gradually at work.

At work, the first task to the company is to lay the optical cable connecting urban and rural areas and work with the staff on the spot. During this period, I have been working diligently, cooperating with the field staff and obeying the arrangement. Good help and complete the task at the same time, I also have great gains. Today, with the rapid development of science and technology, the competition is becoming more and more fierce. In order to get into the best working condition in the shortest time, so as to finish my job better in the future, I personally realize that only by constantly learning new knowledge, mastering new skills and constantly improving my professional level and working skills can I meet the needs of my work and adapt to the development of society. In the course of my work, I will constantly learn from my experienced colleagues skills or techniques that I have never really mastered, and apply them. I will also collect and sort out some information during my work and turn it into information for future use. In my spare time, I read some professional books and websites to learn and master some advanced professional and technical knowledge. I also read some management books or other websites to learn all kinds of knowledge and improve my comprehensive ability. In my future work, I will improve my quality through continuous study and practice, so that my progress can be synchronized with the development of society to meet the needs of my work. I know that as an engineer, I should have a correct attitude and a rigorous scientific style in my work.

At present, my job is to provide technical support for the overall transformation of digital TV in various township sites. As a direct participant in the overall transformation of digital TV, I am actively preparing for the next task. As a technician, I have the responsibility and obligation to make full preparations for the smooth progress of construction. In order to complete the task better, I am actively working with my colleagues to complete the task with good quality and quantity. In this period of work, I deeply feel that the responsibility is more important than Mount Tai. It's really my pleasure to be involved. During this period, I paid a lot, but I also gained a lot, and I enjoyed it.

After working for nearly ten years, I have become more and more clear about the operation of digital TV, more and more familiar with instruments and equipment, and closer to other colleagues. In addition, I have an overall understanding of all links in the process of engineering construction and technical support. While understanding, I am gradually improving my understanding and learning of instruments, equipment and theories. During my work, my personal working ability has been improved to a certain extent, which is inseparable from the concern of the leaders and the help of colleagues around me. In the future work, I will continue to work hard, make persistent efforts, be strict with myself, be realistic and innovative, constantly temper myself and do my best.

Summary of Assistant Engineer's Work 2. I have been working in Ningxia Hengmai Engineering Consulting Co., Ltd. since xx, 20xx, and have been working as a budgeter. With the support and encouragement of company leaders and the assistance and cooperation of colleagues, my work can be better completed. The work is summarized as follows:

Since I became a budgeter, I have been able to complete the operation and management of the company on time according to the rules and regulations of the state and the company. According to the requirements of the company, submit attendance records and monthly work progress status table at the end of each month. Attend the meeting on time and make an analysis report on the work in the self-stage

Work attitude:

1. Obey the work arrangement of the company leaders and do all the work carefully. I always put the overall situation first in my work. Participate in all the work of the company with your heart. Always finish the work arranged by the company on time with good quality and quantity.

2. Adapt to and abide by the reform of various management systems of the company, and further strengthen the sense of post responsibility. Since the beginning of this year, the company's rules and regulations have been improved or further improved. I always adapt to this situation with my heart, strengthen my sense of responsibility, do my work well in time and try my best to serve the enterprise on the basis of the current rules and regulations of the company and the professional ethics of budget officers.

3. Use the rest time after work to strengthen study. Usually pay attention to collecting relevant current quota data files, and strengthen the study of business knowledge such as engineering quantity calculation skills. Study computer knowledge hard to improve my work efficiency. In the future, we should study harder and improve our own quality, so as to do our work better.

The construction drawing budget is the basis for determining the project cost, signing the construction and installation contract, implementing the investment contract between the construction unit and the construction unit, handling the project settlement, implementing economic accounting and assessing the project cost. When calculating, you should be careful, you can't calculate less and you can't omit it. At the same time, we should respect reality, don't over-calculate, don't overestimate risks, and don't take chances. When editing, it varies from person to person according to the object of editing and their own interests, or personal reasons. We should obey the truth, not stick to our own opinions, and continue to maintain good professional ethics and our own reputation. On the above basis, ensure the accuracy and rationality of "quantity" and "price" and make a good budget for construction drawings.

The above is a summary of my work since my probation period. During this period, I constantly improve my professional and technical knowledge through study, accumulate experience in practice, learn from the strengths of others to make up for my own shortcomings, and make great progress by my own analysis and thinking. In my future work, I will redouble my efforts to improve my comprehensive quality and professional and technical level and meet more challenges.

Work summary of assistant engineer. I have a job in xx. I have been engaged in electricity meter calibration, electricity inspection and so on. Now I am the deputy director of the sales department, responsible for line loss management, measurement management, electricity inspection and so on. In several years of practical work, the professional and technical level has been significantly improved by studying with an open mind, exercising hard and combining book knowledge with practical work. Now I will report my personal work.

First, strengthen the management of standard equipment to ensure the accuracy of value transmission.

We often say that the electric meter is the "weighing beam" in the business activities of electric power enterprises, and the standard measuring equipment is a tool for calibrating the "weighing beam", which is of extraordinary importance to electric power enterprises. Our bureau has 19 sets of standard equipment. In order to ensure the stable and healthy operation of these equipment, I presided over the establishment of a standardized accounting of measuring equipment, clearly defined the management of special personnel, and sent them for inspection regularly to avoid overdue service.

For the portable single-phase watt-hour meter calibration table with unstable performance, we maintain it once a year by the manufacturer, and compare it with other standards irregularly, so as to solve the problem in time and avoid serious consequences. A total of 2 sets of standard equipment/kloc-0 were submitted for inspection in xx years. Due to the work in place and effective measures, the qualified rate of inspection reached 100%, which was well received by the leaders of the Electric Power Research Institute.

Second, do a good job in meter management and safeguard the legitimate rights and interests of both parties.

Through business investigation, we have established an electric meter account and brought the electric meter into standardized management. We have determined the work flow of electricity meter verification, and the account is dynamically managed by a special person to ensure that the account is consistent with the fact. Before instrument calibration, check the accounts and register the work records. During the calibration process, the microcomputer will automatically record the error data, and after the calibration, a special person will change the meter account. If it is necessary to replace the meter, the replacement record of the metering device shall be issued, and the charging report of the metering device shall be issued according to the actual situation.

The consequences of this effectively curb the bad behavior of individuals who make a fuss about electricity meters and seek personal gain. In order to ensure the quality of meter calibration, we implement the lifelong responsibility system for meter calibration. As long as it is determined that the unqualified error is artificially adjusted, no matter how long it takes, the verifier should be held accountable and will not be tolerated. In xx years, 474 meters/kloc-0 and 48 current transformers14 were inspected, exceeding the planned task by 56.7%, which provided technical support for global loss reduction and energy saving.

Third, pay close attention to bus balance management and eliminate the blind spot of line loss management.

Generally speaking, line loss consists of high-voltage line loss and low-voltage line loss, both of which have strict assessment systems and are widely valued; Bus balance between high and low voltage line losses is easily overlooked. In fact, the bus balance can not be ignored. For example, our bureau completed power supply of 299.7 million kWh in xx. If the global bus balance rate rises from 0.5% to 1%, the overall annual power loss will be 1.49 million kWh.

The balance rate of bus mainly depends on the accuracy of metering device. In order to ensure the accuracy of the measuring devices in the station, in July of xx, we replaced all the measuring instruments in the station with multifunctional electronic instruments, and checked them on site once every quarter according to the measurement regulations to ensure the stable operation of the instruments. Through this work, the bus balance rate has been greatly reduced, and the balance rate of Mibei and Bandong Station has been reduced from more than 1.5% to less than 0.5%, and the effect is particularly obvious. In order to know the balance situation in the station timely and accurately, we set up special personnel to pay attention to the balance situation of each station every day and check it once a week. As long as the balance rate of a station exceeds 0.5% for two consecutive days, we will immediately rush to the scene to find out the reason.

For metering faults reported by each station, we guarantee that personnel will be in place within 12 hours to solve the problem as quickly as possible. In xx years, we replaced 46 meters, conducted on-site inspections 146 times, and handled three metering failures in the station, ensuring that the overall annual bus balance rate was within 0.5%. In order to achieve the power supply target and ensure economic benefits, we set out early in the morning to replace the electronic watch and try to work during the low power consumption period. This is the first "zero point project" of our bureau.

Fourth, pay attention to on-site management and fully cooperate with the loss reduction work.

On-site management includes positioning, acceptance and various forms of on-site investigation. Every positioning or acceptance, I ask team members to be serious and responsible, not limited to taking notes, to really participate, and to strictly control. In September of xx, when we accepted the capacity expansion project of Bao Si Leather Plastic Co., Ltd. 1000kva, we carefully checked the wiring, found the measurement wiring error of the manufacturer, and prevented a serious measurement accident.

For other field work, whether it is a general survey of electricity consumption, a key survey of some lines and substations, or a survey of the load of public distribution transformers, I insist on seeking truth from facts, and strive to investigate the real first-hand information clearly, so as to provide a reliable basis for leadership decision-making. In addition, I also regard field research as a rare opportunity for me to go deep into the grassroots and get in touch with the front line. Through on-the-spot investigation, we can solve practical problems for comrades in power supply stations, enrich our own experience and supplement our own knowledge. In xx, we investigated 30 lines and 8 stations, and corrected 1 1 wrong connections.

5. Optimize reactive power configuration to provide technical support for loss reduction.

Reactive power management is an important link in line loss management. For reactive power management, I am not satisfied with reporting several forms and filling in a few figures in the power supply station, but devoted myself to this work. On the one hand, I have visited Beisha, Dongyang, Dabucun and other places for many times, starting with correcting the wiring of reactive power meters, helping power supply personnel to measure the reactive power of users, determine the reactive power compensation scheme for users, and check the reactive power compensation effect.

On the other hand, access to relevant information, understand the latest trends of reactive power compensation, constantly fill the brain, and seek practical working methods of reactive power compensation in our bureau. Through unremitting efforts, comrades in power supply stations and many power users have continuously improved their understanding of this work. Last year * * * reactive power compensation was nearly 1 10,000 kvar.

Summary of Assistant Engineer's Work 4 20xx65438+February 1, which was sent back to the factory for maintenance due to the failure of the capacitor height regulator of messer CNC cutting machine, but there were many tasks in equipment production. In order to ensure the temporary operation of the equipment, I used two 24v relays to form a forward and reverse circuit to realize the lifting of the cutting machine. However, because there is no deceleration component in the lifting mechanism, the speed of the lifting motor is relatively fast at this time, which brings some inconvenience to the operator. At that time, we couldn't find a high-power potentiometer, but it suddenly occurred to me that the heating wire in the soldering iron we usually use is so powerful that it can completely replace the potentiometer. I got a section of electric heating wire by measuring the speed many times and put it in the ceramic shell of the modified fuse to achieve better insulation and heat dissipation. After installation for a period of time, the effect is good.

On April 8, 20xx, the distributor of the discharging table of tba/me400 iron core transverse shear line often failed in operation. Manual test after shutdown found that the inductive switch x98 in front of the distributor works normally, and so does the distributor. So I asked the operator to keep the equipment running normally. After the fault occurs, log in to Mitsubishi plc to check the ladder diagram. When the inductive switch x98 senses the material, the cloth delay timer t30 starts counting. After 2 seconds, the distributor controls the working distributor to move up or down to achieve the purpose of cloth distribution. When the equipment fails, the timer is too long, which leads to the line being in working state and unable to be disconnected, thus leading to the distributor not working normally. So I changed the timer time to 1. After 5 seconds, after debugging, it was found that there was no such fault.

On June 16, 20xx, during dry heydrich pouring, the indicator light on the indicator panel kept flashing, and some functions could not work normally. I logged into abplc on the Internet and found that the external signal input was normal, but the internal signal did not appear. I suspected that there was something wrong with the ab digital input module 177 1-IA. I found that the input module could not transfer data to the cpu for processing by replacing the module equipment.

On July 20xx 1 day, the insulation controller of dry RJ- 1400 foil winding machine could not be tightened. After searching the circuit, it was found that the original tension coil had no power input and its power electronic module was damaged. Use another set of power supply to load the equipment and run normally for the time being. The pcb board of the power supply was removed. After careful inspection, it was found that the 240 Ω resistor connected in series with the second pin of lm3 17t regulator was burnt out, resulting in no power output. After replacing the resistor, it was found that the voltage could not be adjusted from 0-24V, but only from 6- 12V, which could not meet the original design requirements. So after the second test, it was found that the voltage adjustment was not obvious.

From the above things, we can easily find that there are many subtle places in life that need attention. Because most electrical circuits are an organic whole, a small resistance problem may lead to the failure of the whole equipment. Through one year's study experience, I have matured a lot, but I also found many shortcomings of myself. I believe that I will redouble my efforts in the future work to make up for my own shortcomings, and at the same time strengthen cultural study and work hard to make my due contribution to the development of the enterprise!

Assistant Engineer's Work Summary 5 My name is xx. I have been engaged in the project budget and final accounts since I graduated from the Institute of Engineering Cost in 20xx. For two and a half years, I have been working hard, taking every detail seriously and gaining a lot from grassroots work. I slowly combined theoretical knowledge with practical experience, and made great progress from professional technical knowledge to working ability through continuous study, continuous summary and continuous exploration. I summarize here as follows:

1, the ideology has been greatly improved. When I first left school, I entered the Department of Engineering Budget. Budget work is often short of time, with many projects, detailed requirements and clear thinking. When receiving the budget work, I often have to work overtime or even stay up all night. It's hard. I also thought about quitting my job and changing careers, but I persisted all the way. Until now, when I was in trouble, I stopped giving up. I am completely independent in working thoughts and have a good ability to deal with general emergencies. When encountering problems, I stopped sighing, learned to be calm, and used my knowledge and experience to analyze the budget differences of each building, which further improved the work efficiency. Great progress has been made in my ability, and I no longer have the idea of giving up halfway in my work. In view of the tight time and heavy task, I can finish it smoothly.

2. Keep learning professional knowledge and improve professional skills. The' step by step' in the project left sweat on every detail, but all I learned was professional knowledge. I kept learning, which combined the knowledge in books with reality, and also found many blind spots in the process of budgeting, which made me make progress step by step. I just graduated in xx, and applied for the undergraduate course of civil engineering in adult education of Jiaotong University, constantly enriching my theoretical knowledge. At this time, I will never forget to thank my master and leader.

Don't do what you don't expect. While working, I learned to be a man. In the same office, we all have many colleagues. When colleagues work together, they will inevitably encounter contradictions. At this time, I learned to reflect on myself. When asking others to do the same thing, first think about whether you can do it. If you can't do it yourself, you can't ask others to do it. Treat people around us with more tolerance and smiles, so that our work will be more enjoyable and efficient. Be a man before you do anything. Only a good personality will make it easier for others to get in touch with you, work can be better coordinated and communicated, and problems can be solved through mutual help. There is only an eternal team, not an eternal individual.

After working for more than two years, I have analyzed the price of the project budget in detail from every list and quota to the local market price. My pragmatic working attitude has exposed me to the project budgets of various structural forms, large and small, and I can complete the work well as required every time.

I will continue to learn and improve my comprehensive quality, exercise my personal character, constantly improve my professional and technical ability, improve my on-site management ability, and be a technically comprehensive manager.

Summary of Assistant Engineer's Work 6 I 1993 graduated from Anhui Civil Engineering School, and worked in dongzhi county Hydropower Construction and Installation Engineering Company for 20xx, mainly responsible for the survey and setting out of the construction site and the design of the construction scheme of the construction project. In 20xx years, I worked in dongzhi county Yaoshun Water Conservancy Construction Co., Ltd. During my tenure, all the tasks assigned by the leaders and all the work within the scope of my post were successfully completed in time, and I was proactive, not afraid of hardship and fatigue, diligent and practical. The main achievements are summarized as follows:

1.20xx participated in the comprehensive building construction of dongzhi county Yanghu Central School. In the process of construction, organize the construction in strict accordance with the scheme and requirements of construction organization design. Mainly for construction survey, site positioning and setting-out, elevation control, etc. In the construction survey, first of all, I should be familiar with the construction drawings, which also cultivated my ability to read and understand the drawings and laid a solid foundation for the future work. In addition, in the process of engineering construction, the construction records should be collected and sorted, and the quality evaluation of the unit project should be done in time to ensure the authenticity, integrity and timeliness of the engineering data. This project has passed the acceptance of relevant units, with complete information and qualified acceptance.

2.20xx 12 to 20xx 12, participated in the preparation of the construction organization design of dongzhi county Longquan Family Planning Service Complex, and was responsible for the survey and lofting review of the construction site to ensure that the project was constructed in strict accordance with the requirements of the construction plan, so that the project quality reached the qualified standard.

3.20xx May to 20xx July, participated in the preparation of the construction organization design of dongzhi county Mobile Communication Complex, designed the construction scheme, prepared the construction progress plan, and was responsible for the quality control of the construction site. This project was rated as a municipal "safety and civilization demonstration" site.

Four. From May of 20xx, I worked out the construction organization design of the teaching building project of Huangjing Primary School in Longquan Town, dongzhi county, made technical disclosure and was responsible for the project quality management, but I was appointed as the project quality inspector, and now I am under construction.

Verb (the abbreviation of verb) has worked in dongzhi county Yanghu Town Comprehensive Market A # B # Building Project (three-story frame structure with a building area of 2289m2), dongzhi county Nanshan Primary School Teaching Building Project (two-story brick-concrete structure with a building area of 450m2) and dongzhi county Yanghu Comprehensive Market C # D # Building Project (two-story frame structure, Construction inspectors of dongzhi county Yanghu schistosomiasis control brigade office building project (three-story frame structure, construction area of 970m2) are responsible for compiling the construction organization design and controlling the quality of the construction site, ensuring that the construction of each sub-project meets the specification requirements and quality standards, especially the quality control of special projects, such as formwork, reinforcement and concrete projects, and making acceptance records of concealed projects in time. The above projects have passed the acceptance of dongzhi county Quality Supervision Station, and the visual quality is excellent!

The above is my 15 years of major working experience in engineering. As an engineer, I study while working and develop step by step. Although I have done some work and accumulated some useful work experience, I will further strengthen my study, work hard, actively participate in professional theory study, and constantly improve my professional skills, so as to make positive contributions to the survival, reform and development of the enterprise in the future.

At 7 o'clock, the assistant engineer's work summary waits for no one, and he graduated for one year in a blink of an eye. Looking back on the past year, from looking for a job to now, there are many people to thank, many gains and many regrets. "The past can't be blamed, and those who come can still be chased." For the harvest, we still want to thank those teachers who are silent. We can only learn more about regret in our future work and strive to do nothing wrong in Meiji.

The following are some experiences from two construction sites last year: The first construction site after graduation was Kunming No.8 Sewage Treatment Plant, and the water supply was stopped from July 23rd to February 28th, 20xx. It is one of the national key projects listed in the national five-year plan, and it is also one of the Dianchi Lake management projects. The daily processing capacity of this project is 654.38 million tons, and AAO process is adopted. The project mainly includes long-pile bored pile foundation. 4.5 ~ 5m deep foundation pit excavation, main civil construction, equipment installation, green planting and trial operation, as the first project after graduation, I was fortunate to be with a "teacher" with rich practical experience and strong coordination ability who really understood our subordinates.

As one of the water conservancy projects, elevation control, seepage prevention and leakage prevention are the key and difficult points of sewage treatment plants, especially the construction of rubber water stop at expansion joints, because there is only one rubber water stop at construction joints, which is the weak point of water-bearing structures. In this regard, according to the principle of pre-control, the supervision department made technical disclosure to the engineering department of the construction unit by issuing the contact list of supervision work, so as to improve the attention of the construction unit to this part. During the construction process, the irregular installation of water stop shall be corrected in time through patrol, and the position of expansion joint shall be mainly checked in the process inspection, and the concrete pouring quality at the expansion joint shall be controlled through patrol measures.

Because this project is close to Dianchi Lake, the elevation stratum of the basement is mainly silty sand. When steel pipe is embedded, the bearing capacity of the basement is reduced due to the narrow working face, which makes the pipeline basement difficult to harden, and the narrow excavation face also brings hidden dangers to the safety of foundation pit. Therefore, the strategy of short, flat and fast excavation is adopted. After the foundation pit excavation, the basement treatment and pipeline hoisting and installation are carried out in time, and the sides of the foundation pit are reinforced with steel sheet piles to ensure safety, because the working faces in the factory area are compact and parallel. Cross-construction is carried out at the same time, with many construction units, great interference between processes and great resource disputes among construction units. Therefore, the supervision department organized a meeting of civil engineering (main body, pipeline, road, anti-corrosion), equipment installation and greening construction units, staggered the construction positions of each construction unit according to the actual progress, concentrated on solving the construction affecting the construction access road first, and asked the greening construction unit to enter the site after the plane layout was completed. With the joint efforts of all participating units, Kunming won the eighth place.

The second site is also one of the Dianchi Lake treatment projects, which is the construction of the sewage interception main canal on the south bank of Dianchi Lake in Kunming. The commencement date is 20xx years 1 1. So far, the project plans to invest 470 million yuan. The main body of the project is a rain and sewage diversion box culvert, with specifications of 3x3m, 1x3m, with a total length of 8km and BT financing. There are 9 participants, including the owner, the construction owner and the project.

Due to the large number of contractors, especially when BT's financing is blocked by the financial crisis, the contradictions among the parties involved in the construction are prominent, which brings great challenges to supervision and coordination. The technical difficulties in construction are mainly the excavation and support of deep foundation pit, and the depth of local foundation pit reaches 9 meters, which has become one of the key points of work. Foundation pit support is divided into bored piles and Larsen steel sheet piles. When the owner hired a third party to monitor the foundation pit, combined with the test results of the third party, the site was treated with large deformation in time, and the deformation of the foundation pit was inspected daily. The two projects were accepted. It is known that most of the supervision work is actually on site, and the project supervision department is not the technical department of the construction unit in terms of office work and coordination. Project management is one of the key points of supervision work. To manage a project well, the first task is to manage several leaders of the construction unit, convince people by reasoning and convince people by virtue, and provide quality services for the owners, but also help the construction that needs help most.