After many investigations, Yang decided to abandon the traditional bricks and choose a new building material EPS module to build a new house with cast-in-place concrete structure. "It is not easy for farmers to build houses. Newly built villas must be durable, safe and comfortable. "
The so-called EPS module is actually a component made of special foam, just like a building block, which is hollow inside and covered with dovetail grooves outside. Several workers used EPS modules to "build walls" and then poured reinforced concrete into the modules.
There is no need for tool calibration in the construction process, and the wall is naturally horizontal or vertical. Three workers worked easily for a day, and the wall height was 1 meter. The house built with EPS module has good thermal insulation performance, which is warm in winter and cool in summer, and the construction speed is about twice as fast as that of red brick wall. The cost per square meter is about 1000 yuan, and the service life is several times that of red bricks.
The building model used by Yang family is an assembly building technology that Fuyang City is actively promoting. According to the plan of the municipal government, by 2025, the proportion of prefabricated buildings in the city will reach more than 30%.