What are the steps for developers to build houses?
First of all, the construction site should be leveled, that is, the water and electricity should be connected and the road should be leveled. Then after the foundation is dug, the cushion is laid, and the foundation is laid before backfilling. Then began to build the main body, the main content is to start from the ring beam and then tie the steel bar, then support the template, and finally pour it until it is capped.
It is best to operate according to the specific construction drawings. Then we began to build a wall, and when the wall was built, it was the floor. Behind the floor, it is waterproof. After waterproofing is completed, water and electricity pipelines can be made. What should Gai Lou pay attention to?
1, cast-in-place floor slab
With the development of economy, cast-in-place structure is widely used in rural housing at present. Attention should be paid to the placement of plate reinforcement in cast-in-place slab: the reinforcement at the top and bottom of slab should be placed evenly according to the design distance. In the process of steel bar binding, the steel bar at the top of the slab usually bends down due to trampling, so it is necessary to correct the position of the steel bar at the top of the slab before pouring concrete. The reinforcement at the bottom of the slab should be padded with pebbles about 30mm in size, so that there is a corresponding gap between the reinforcement and the formwork to prevent the reinforcement at the bottom of the slab from being exposed.
Step 2: walls
Wall is the load-bearing and maintenance structure in the house. There are holes left by external scaffolding Rachel on the external wall. Be sure to block the holes with bricks before painting. , and then painted with cement mortar, otherwise this part is easy to seep. Masonry should be staggered up and down, internal and external masonry, brick masonry alternately. Masonry mortar joint should be full, head joint should be full, can not have bright holes.
3, cast-in-place structure template support demolition time
Formwork support of cast-in-place structure must be removed after cast-in-place reinforced concrete reaches a certain strength. Cantilever structure can only be dismantled when the cast-in-place reinforced concrete reaches 100% (generally more than 28 days).