I just bought a house of 168 square meters to be renovated. LG gave me the right to decorate it, but I don't know how to do it (which step to take first, then which step to take).

Decorative process

1 pre-design -2 main body demolition and reconstruction -3 hydropower reconstruction -4 carpentry -5 tiling -6 wall painting -7 kitchen and bathroom ceiling -8 cabinet installation -9 wooden door installation-10 floor installation-165438 wallpaper laying -65448 5 hardware and sanitary ware installation-16

1. Pre-design: mainly design according to your own living habits and make a detailed measurement for your room. Don't be lazy, you'd better do it yourself. The measurement contents mainly include:

Clean up the areas involved in the renovation process. Especially tile area, wall paint area, wallpaper area and floor area;

Determine the main wall size. Especially it is necessary to design the wall size of furniture in the future.

2. Demolition and transformation of the main body

In the construction stage, the demolition and reconstruction of the main infilled wall is the first project, which mainly includes wall demolition, wall building, wall peeling, heating removal and replacement of plastic-steel windows. To put it bluntly, the main body demolition is to put up the framework of the construction site first.

3. Hydropower transformation

Before the water circuit reform, the main structure should be basically completed. Between hydropower transformation and main demolition, the first test of the cabinet should also be carried out. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers. Mainly includes:

See if the position of the lampblack machine socket affects the installation of the lampblack machine in the future;

See if the location of the water meter is appropriate;

See if the location of the water inlet is convenient for installing the sink in the future.

The first measurement of cabinets can be done by experienced friends themselves. After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately. The kitchen generally does not need to be waterproof, so it is recommended to be waterproof.

4. Woodworking

Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil. The basic entry principle is-whoever is dirty goes first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement.

In fact, carpentry, such as vertical pipe, decorative ceiling and plaster line, can also be considered as the fine link of main demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs some cooperation.

5. Gaiwa

During the operation of "bricklayer's second child", the installation of the following three links is also involved:

Installation of lintel and marble window sill. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue.

Install the floor drain. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. So when friends start shopping for building materials, they should buy a floor drain as soon as possible.

Installation of range hood. The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood.

"The second child of the bricklayer" left the scene. At this time, you can measure the cupboard for the second time. Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, the second measurement of the cabinet can be carried out.

whitewash a wall

The "Third Oil Worker" enters the site, mainly completing the basic treatment of the wall surface, painting the top coat and painting the furniture that the "carpenter" hits. Students who are ready to paste wallpaper only need to let the "third oil worker" do basic treatment on the wall surface where wallpaper is planned. As for whether I left my coat for the last time, I personally don't think it is necessary to take this question too seriously. From my experience in decoration, it is of little significance to leave the top coat, because the operation behind is not dirtier than painting.

7, kitchen and bathroom ceiling

As an installation link, the cabinet ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. Friends had better install the kitchen ceiling lamp and the exhaust fan (Yuba) at the same time, otherwise it will leave threads and holes.

8, kitchen cabinet installation

After the ceiling is completed, you can make an appointment to install the cabinet at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.

9, wooden door installation

The second day after the cabinet was installed, as early as more than a month ago, after the wooden door was measured, it can be installed now. If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed. Related hardware should be prepared in advance.

If you want the wooden door manufacturer to install the window cover and pass it, you should also measure it when the wooden door manufacturer measures it, and install it at the same time on the day when the wooden door is installed. At the same time, you should consider putting the installation time of marble windowsill backward after the window cover is installed.

Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period closely connected, wooden door manufacturers should go to the door to measure the size of the door opening as soon as possible after the main body is demolished and rebuilt. Regarding the treatment of the doorway, it should be noted that if the height of the doorway at home is inconsistent, workers need to treat it at the same height-beautiful.

X) floor installation

The floor can be installed the day after the wooden door is installed. If all goes well, it will take a day. The floor installation needs to pay attention to the following issues:

1. Before the floor is installed, it's best to let the manufacturer visit to inspect whether the floor needs leveling or partial leveling. Some decoration companies or decoration teams will suggest ground leveling or partial leveling, which shall be subject to the actual investigation of the floor manufacturer;

2. Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process.

3. When installing the floor, if possible, the floor must be cut in the corridor. Clean it up after you finish. Cutting the floor indoors has serious pollution to the wall, and cutting the artificial stone countertops of cabinets.

(1 1) Laying wallpaper

The next day after the floor is installed, the home is ready, and you can make an appointment to paste wallpaper. If it goes well, the same day will do. If possible, the floor should be protected on the day of wallpaper pasting; It doesn't matter if there are no conditions, and it's no problem to give the wallpaper glue left on the floor to the cleaner. Before pasting the wallpaper, try to make the wall "nothing".

(12) Installation of radiator

The day after the wallpaper is laid, the person who replaces or removes the radiator can hang the radiator on the wall in a down-to-earth manner. It's also a day.

Wooden door-floor-wallpaper-radiator, which is recognized as the correct installation sequence. Install the wooden door first to ensure that the skirting line of the floor can be closely connected with the door cover of the wooden door; After installing wallpaper, the main reason is that the floor is dirty and dusty, which seriously pollutes the wallpaper. Here I use the principle of "whoever is dirty first" again. Finally, install the radiator, because the radiator can only be installed after the wallpaper is laid on the wall.

XIII) Installation of switch socket

We should have a detailed understanding or record of the number and location of switch sockets in various natural rooms at home, especially wallpaper pasting workers. Sometimes the wallpaper worker is irresponsible, and the wallpaper is laid at once, and there is no need for wallpaper knife to mark the position of your switch socket. So, you still need to know for yourself.

(14) Installation of lamps and lanterns

Install the lights. There is nothing to say. After the lights were installed, the house lit up, saying goodbye to the dazzling light of 100 watt incandescent bulbs during decoration-it felt really good.

(15) Installation of Hardware Sanitary Ware

Before buying pipe fittings, bathroom fittings, toilets, clothes hangers, etc. , are all installed. After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware sanitary ware are installed, the home will be "alive", really "alive". It is no exaggeration to say that it will be beautiful to open the dragon water for the first time and watch the water flow out. Convenient, the newly installed toilet at home for the first time will have a great sense of accomplishment.

(16) Installation of curtain rod

The installation of curtain rod marks the basic end of home improvement.

(17) cleaning

Don't install curtains before cleaning. When cleaning, don't have furniture and unnecessary household appliances at home. Leave as many "planes" as possible, so that the cleaning can be thorough.

(18) Furniture comes into play

As for the purchase time of furniture, it should be after the completion of water circuit decoration at the earliest, so as to get a general understanding of the basic size range of furniture. Therefore, some friends have been eager to book all the furniture before the renovation, and personally feel that it is not necessary.

(19) Home appliances enter the site

At this time, it's time for home appliances to enter the market. It's time to install and prepare to move in!

(20) Home accessories

Home decoration, the last step of home improvement, has changed from decoration to decoration, including the installation of curtains. As for buying curtains, it is best to book furniture first to avoid style conflict. Home accessories also include buying some green plants, hanging murals, decorative handicrafts and so on ... in short, you can play freely after staying!