What are the design requirements of the cleaning and purification project?

The cleaning and purification project is to discharge the toxic and harmful air polluted by bacteria indoors to meet the requirements of our production process or work.

There are four requirements for the design of clean engineering.

1, clean purification workshop design must be carried out in strict accordance with the relevant national policies and guidelines, so as to achieve scientific design, quality assurance, safety and applicability, energy conservation and environmental protection.

2. When using the original building to carry out clean technical transformation, the design of dust-free purification workshop must be adapted to local conditions and make full use of existing technical facilities according to the requirements of production technology.

3. Clean purification workshop design should create necessary conditions for construction, installation, maintenance and management, testing and safe operation.

4. The design of clean purification workshop should not only be implemented according to this specification, but also meet the relevant requirements of current international standards and specifications.

For the design proposal of clean purification workshop, please consult Jiangsu Shi Sheng Huawei Engineering Technology Co., Ltd., where my former leader worked and was very serious and responsible.