The supervision service fee is charged according to the investment amount in the project budget, and the amount of the fee is the sum of the construction and installation project fee, equipment purchase fee and joint trial operation fee in the project budget.
The contract part, including quality control and safety production supervision and management service fees, should not be less than 70% of the total construction project supervision service fees.
Jointly undertaken, the construction unit entrusts one of the engineering supervision units to be responsible for the engineering supervision service, and pays the overall coordination fee of 4%-6% of the supervision service fee.
Construction supervision is a high-tech service work, and the supervision unit carries out supervision business in the form of paid service.
(1) The construction supervision fee shall be calculated in one of the following ways according to the business scope, depth, engineering nature, scale, difficulty and working conditions of the entrusted supervision project:
1 Calculated by the average number of people participating in supervision work every year 10000 yuan/person/year.
2 according to the proportion of project cost:
If the project cost is 5 million yuan or less, it shall not be less than 5 million yuan to 65.438+million yuan, if the project cost is 6.5438+million yuan to 50 million yuan, if the project cost is 50 million yuan to 65.438+0 billion yuan, it will be collected to 500 million yuan. If the project cost is more than1000 billion yuan, it shall not be greater than the standards for collecting supervision fees in the preceding two paragraphs, including the supervision fees from the construction stage to the warranty period, but excluding the supervision fees in the construction bidding stage.
(2) The supervision fee can be charged in the quality supervision of the total project budget, the management fee of the construction unit or the unforeseen expenses of the construction project.
(3) The basic supervision fees for Sino-foreign joint ventures, cooperation and wholly foreign-owned construction projects shall be determined by both parties through consultation with reference to international standards.
Two, the following construction projects must be supervised
(1) National key construction projects;
(2) Large and medium-sized public utility projects;
(3) Development and construction of residential district projects;
(4) Projects using loans or aid funds from foreign governments or international organizations;
(five) other projects that the state must supervise.
Three, other projects that must be supervised by the state.
(a) the following infrastructure projects involving social interests and public safety with a total investment of more than 30 million yuan:
(1) coal, petroleum, chemical industry, natural gas, electric power, new energy and other projects;
(2) Railway, highway, pipeline, water transport, civil aviation and other transportation projects;
(three) postal services, telecommunications hubs, communications, information networks and other projects;
(four) flood control, irrigation, drainage, power generation, water diversion (supply), beach management, water resources protection, soil and water conservation and other water conservancy construction projects;
(five) urban infrastructure projects such as roads, bridges, subway and light rail transportation, sewage discharge and treatment, garbage disposal, underground pipelines, public parking lots, etc.;
(6) Ecological environment protection projects;
(seven) other infrastructure projects.