Demolition and masonry
The demolition part includes the ground demolition of the office building corridor, the original ceiling demolition and the original wall demolition; The new wall should be laid according to the parts shown in the design drawings.
Second, the exterior wall decoration
(1) Exterior wall fluorocarbon coating finish
(2) Install aluminum alloy air conditioning hood and aluminum alloy ventilation hood.
(3) Reconstruction of storm sewer
(4) Install the air conditioning condensate pipe.
(5) Cantilever external wall bricklaying
(6) A layer of external walls and columns are paved with granite.
(7) Manufacture and installation of stainless steel grid ceiling for gate.
(8) Manufacture and installation of all-glass automatic induction door and door cover.
(9) Install 15 mm tempered glass French window.
Third floor ground
(1) Granite Paving of Steps Outside the Hall
(2) Granite paving for the lobby and corridor on the first floor
(3) 2; Laying of vitrified brick in nine-story corridor
(4) 1 Granite paving for stair tread
(5) laying vitrified bricks in step 2.
(6) Anti-skid bricks shall be laid on the floor of each bathroom.
(7) Vitrified bricks are laid in the conference room and symposium room on the first floor.
(8) Carpet laying in the reception hall on the first floor
(9) The general manager's office, the secretary's office, the conference room and the living room are on the third floor, the leadership office is on the fifth floor, the office is on the eighth floor, and the gym is on the ninth floor. The adjacent rooms are paved with composite floors.
(10) Nine-layer cement mortar leveling