In order to ensure that our efforts are effective, we need to make a plan in advance, which is the method plan obtained before filing the case. What formats should I pay attention to when writing a scheme? The following is the construction project quality planning scheme I compiled for you, for reference only, and you are welcome to read it.
Construction Project Quality Planning Scheme 1 In order to strengthen the civilized construction management of construction sites in Chenggong District, improve the level of standardized construction sites and maintain a clean and tidy city appearance and environment, this scheme is formulated according to the Regulations on Safety Management of Construction Projects (Order No.393 of the State Council), the Regulations on Urban Construction Management in XX Province, the Regulations on Construction Sites Management in XX Province and the Regulations on Civilized Construction of Construction Sites in XX City, etc. , and combined with the actual situation:
I. Guiding ideology
In order to improve the overall level of civilized construction management, in line with the idea of "emphasizing key points, adhering to standards, grasping strict management and overall improvement", we will strengthen the supervision and management of construction sites, focus on standardizing the management of site enclosure, civilized construction, road hardening, "three pools and one standby" and environmental sanitation, and establish a long-term, standardized and standardized management mechanism for civilized construction management of construction sites to achieve a clean and beautiful city appearance and environment.
Second, organize and lead.
In order to strengthen the organization and leadership of this rectification work, a leading group for special rectification work on construction sites was established. Wang Bing, deputy head of the district government, served as the team leader, Zhang Minghua, director of the District Housing and Construction Bureau, and zhangyan, director of the District Urban Management Bureau, served as deputy heads, and leaders of the District Housing and Construction Bureau, Chenggong Branch of the Municipal Public Security Bureau, District Safety Supervision Bureau, District Environmental Protection Bureau, District Health Bureau, District Urban Management Bureau and Urban Management Law Enforcement Brigade served as members. There is an office under the leading group, which is located in the District Housing and Construction Bureau, and the director of the office is Li Guirong, deputy director of the District Housing and Construction Bureau. The office is responsible for the organization, coordination and daily work of this rectification work.
Third, the rectification content
(1) The construction units and construction units of all newly built, rebuilt and expanded housing construction projects, municipal infrastructure projects (urban rail transit) and demolition projects within the administrative area of Chenggong District are within the scope of this rectification, and the construction sites along Cai Yun Road, Shilong Road and North-South Central Avenue are the focus of rectification.
(2) Renovation of civilized construction management of the construction site, including standardized management of the construction site such as fence, material stacking and transportation, temporary facilities, safety facilities, construction dust, noise control, muck transportation, sewage discharge and surrounding environment.
(3) Through a month's clean-up and rectification work, the standardized management level of construction sites in Chenggong District will be improved, and the construction units in the jurisdiction will be promoted to carry out standardized and civilized construction in strict accordance with the requirements of the Regulations on Civilized Construction of Construction Sites in XX City and the Notice on Further Standardizing Construction Management of XX Urban Management Bureau. In a short time, the city appearance, environmental sanitation and construction site management level of the whole area have been significantly improved.
(4) The District Housing and Construction Bureau is responsible for the rectification of the internal management of the construction site, including the setting of engineering bulletin boards, the stacking of building materials, the management of civilized construction, and the construction of temporary facilities.
(5) The District Urban Management Bureau is responsible for the external management of the construction site, including the setting of enclosure, the setting of "three pools and one equipment" at the entrance and exit of the construction site, and the transportation of muck.
(VI) Sub-district offices, District Safety Supervision Bureau, Chenggong Branch of Municipal Public Security Bureau, District Health Bureau, District Environmental Protection Bureau and other departments shall, according to their respective responsibilities, implement their responsibilities, strengthen supervision and do a good job in civilized construction management on the construction site.
Fourth, the method steps
The rectification action will be implemented in three stages.
(1) Bottom-up investigation stage: From July 25th to July 30th, members of the district leading group deployed personnel to form an inspection team to conduct a bottom-up investigation of 67 construction sites in the whole district, so as to ensure a clear base and a clear situation.
(II) Implementation stage of rectification: From July 3 1 day to August 15, on the basis of preliminary investigation, the construction sites in the whole region were rectified by means of centralized inspection and key spot checks, with emphasis on the construction sites along Cai Yun Road, Shilong Road and North-South Central Avenue. Those who do not conform to the Provisions of XX Municipality on Civilized Construction of Construction Sites and the Provisions of XX Urban Management Bureau on Further Standardizing Construction Management are more prominent. Penalties will be imposed according to relevant laws and regulations. If the construction is still not carried out according to the specifications after investigation, the work will be stopped for rectification.
(III) Consolidation and promotion stage: from August 16 to August 25, a long-term management mechanism for remediation work will be formed to solve the problems found in time, consolidate the remediation results, prevent landslide rebound and ensure the normalization of standardized management on the construction site.
Verb (abbreviation for verb) job requirements
(a) all relevant departments and units should act in a unified manner, carefully organize and do a good job in implementation. Through rectification, the management level of construction site in Chenggong District has been greatly improved. Projects that have started construction should strictly implement management norms and build according to standards, and the existing problems should be rectified in the shortest time. After the rectification work, all new construction, expansion and reconstruction projects should be strictly supervised. Those who do not meet the requirements of the specification and have not been rectified shall be punished according to relevant laws and regulations, and those who have not been constructed according to the specification after investigation shall be stopped for rectification.
(two) all relevant units and departments should attach great importance to it, through a month of centralized rectification, to achieve mandatory norms, mandatory into the track, to achieve practical results, to ensure that the rectification work is implemented.
(3) All relevant units and departments should do a good job in strict accordance with the plan, strengthen the daily management of the construction site and its surroundings, require the construction unit to strengthen the study and understanding of relevant laws and regulations, carry out safe construction and civilized construction, and * * * maintain the integrity of urban infrastructure and the cleanliness and order of the city.
The second plan of construction engineering quality planning is to effectively carry out the three-year action of quality and safety of housing construction and municipal engineering in xxxx, continuously improve the quality and safety level of engineering in our city, ensure the safety of people's lives and property, and promote the sustained and healthy development of the construction industry in our city. This plan is formulated according to the relevant work deployment requirements of the Ministry of Housing and Urban-Rural Development, the Ministry of Housing and Urban-Rural Development and the Municipal Housing and Urban-Rural Development Bureau, combined with the reality of xxxx.
I. Guiding ideology
Thoroughly implement the spirit of Several Opinions of the Central Committee of the State Council on Further Strengthening the Management of Urban Planning and Construction, Opinions of the General Office of the State Council on Promoting the Sustainable and Healthy Development of the Construction Industry (Guo Ban Fa [20xx] 19) and the Notice of the Municipal Housing and Construction Bureau on the Action Plan for Improving the Quality and Safety of Housing Construction and Municipal Engineering in xxxx, and consolidate the achievements of two years of quality management. Focusing on "implementing the main responsibility" and "strengthening government supervision", we should pay equal attention to enterprise management and project management, enterprise responsibility and personal responsibility, quality and safety behavior and quality and safety of engineering entities, deepen the reform of the construction industry, improve the quality and safety management system, strictly supervise and manage, strictly implement the responsibility, strictly investigate the responsibility, strive to build a long-term mechanism for improving quality and safety, and comprehensively improve the quality and safety level of our xxxx project.
Second, the work objectives
Under the leadership and instructions of the central, provincial and municipal superior departments, it will take about three years to further rationalize and improve the quality and safety management system of xxxx project from top to bottom, and establish and improve the legal system, guarantee system and supervision system. Strictly implement five normative documents, such as "Yunnan Province Housing Construction and Municipal Infrastructure Engineering Quality Supervision Institutions and Personnel Management Assessment Methods" issued by the ministries and agencies, implement the theme responsibility of project quality and safety, strengthen the supervision of project quality and safety, improve the management level of project quality and safety, improve the ability of engineering technology innovation, effectively control the common quality defects of residential projects, and significantly improve the overall level of quality and safety of xxxx projects.
Third, organize and lead.
In order to effectively carry out the three-year project quality and safety improvement action in the city, xxxx set up a work leading group to strictly implement the division of labor responsibility system in accordance with the requirements of "Party and government share responsibility, one post and two responsibilities, and accountability for dereliction of duty" and "three musts".
Team leader:
Deputy team leader:
Members:
The office of the leading group is located in the office of the Planning and Construction Bureau, and the director of the office is xx, who is responsible for coordinating and summarizing the special rectification work. Do a good job in quality and safety management within the scope of responsibilities, and effectively improve the quality and safety level of xxxx project.
Fourth, the task
(1) Strictly implement the main responsibility of project quality and safety.
1. Strictly perform their duties and supervise the implementation of the quality and safety responsibilities of all construction parties. Xxxx All relevant departments should conscientiously implement the normative documents on engineering quality and safety, such as "Measures for Assessment of Quality Supervision Institutions and Personnel Management of Housing Construction and Municipal Engineering in Yunnan Province" and "Measures for Assessment of Safety Supervision Institutions and Personnel Management of Housing Construction and Municipal Engineering in Yunnan Province", and comprehensively use legal, economic and administrative means to urge construction, survey, design, construction and supervision units to strictly implement the main responsibilities of enterprises, especially to strengthen the main responsibilities of construction units and establish self-discipline, self-discipline and restraint mechanisms.
2. Strictly supervise the project and strengthen the quality and safety responsibility of the project leader. In the process of engineering construction, strictly implement the quality and safety responsibilities of the project leaders of the five main parties, such as construction, survey, design, construction and supervision, and strengthen the quality and safety responsibilities of the project leaders. It is necessary to strictly follow the requirements of the Ten Provisions on Quality and Safety Responsibilities of Construction Project Managers, and urge construction enterprises to earnestly implement the quality and safety responsibilities of project managers.
3. Strict education and training, and increase the accountability of employees. Strictly implement key positions and special operators such as project manager, technical director, builder, quality engineer, safety officer and mechanic on the construction site, and gradually establish and explore the information disclosure mechanism, vocational skill appraisal system and worker skill classification management system of construction workers in the city, so as to effectively improve the initiative and enthusiasm of construction workers to participate in training. In particular, we urge all parties to strengthen the management of personal practice ability, implement the quality and safety responsibilities of registered practitioners, strengthen the education and training of quality and safety related knowledge of engineering construction, standardize practice behavior, promote the establishment of personal practice insurance system, and increase the investigation of practice responsibility.
4. Strict law enforcement inspection and lifelong responsibility system for project quality. Further improve the lifelong responsibility system for project quality, strictly implement the system of signing the commitment letter of lifelong responsibility for quality by the heads of the five major projects, setting up permanent signs for newly completed projects, and archiving information on lifelong responsibility for quality. Strengthen the supervision and law enforcement of engineering quality, and punish those who violate the relevant provisions and cause engineering quality accidents according to law.
(B) improve the level of project management
1. Promote the standardization of engineering quality management. Carry out standardized demonstration activities of engineering quality management, popularize refined quality management, and comprehensively promote model guidance, standardized quality behavior management and standardized quality control of engineering entities on the construction site. Popularize and apply the concise, applicable and easy-to-implement post standardization manual, refine the responsibilities of key quality posts, and implement the quality responsibility to people. Continue to promote household acceptance of residential buildings and improve the quality of residential construction. Strengthen the quality supervision of municipal engineering, give play to the demonstration and leading role of high-quality engineering, and guide enterprises to actively carry out the creation of high-quality engineering.
2. Improve the level of construction safety production. It is necessary to strictly implement the Measures for the Dynamic Management of Safety Production of Construction Enterprises and Supervision Enterprises in Yunnan Province, carry out in-depth evaluation of safety production of construction enterprises and projects, promote the standardization of safety behavior and safety management of construction enterprises, enhance the safety awareness and skills of construction workers, urge construction enterprises to actively carry out emergency drills on the construction site, continuously strengthen the awareness of safety production red line of construction workers, and improve the ability of emergency avoidance and self-rescue of accidents.
(3) Improve the supervision and management mechanism.
1. Implement the quality and safety supervision responsibility of the competent department. Xxxx Planning and Construction Bureau should strengthen the quality and safety supervision in the whole process of project construction, focusing on the supervision and inspection of the foundation, main structure and completion acceptance of public safety projects. Further improve the engineering quality inspection system, strengthen the supervision of the inspection process and inspection behavior, and resolutely crack down on the behavior of issuing false reports according to law. Starting with the treatment of common quality problems in housing construction engineering survey and design and residential engineering, practical and effective measures are taken to standardize the drawing review after design change. Promote the construction of quality and safety credit system, supervise and improve the credit evaluation and punishment mechanism, and strengthen credit constraints. Pay close attention to the management of outstanding problems in the quality of engineering entities, strictly implement standards and norms, actively promote the standardization of quality behavior and quality control of entities, implement the standardized evaluation system for construction safety production, and comprehensively improve the quality and safety level of projects.
2, innovative engineering quality and safety supervision mode. Actively promote the "double random and open" inspection method, innovate and reform the existing supervision method, change the inspection method of prior notice and greeting, and adopt random and flight inspection methods to effectively supervise the project. Intensify spot checks and inspections, strengthen supervision and law enforcement inspection of project quality and safety, focus on dangerous sub-projects such as deep foundation pit, high formwork and hoisting machinery, and carry out in-depth special rectification of construction safety and fire safety inspection on construction site. Strengthen the supervision and inspection of municipal engineering projects, organize and carry out special inspection of seismic fortification of new projects to ensure the quality of engineering entities and production safety.
3. Strengthen team building. Xxxx Planning and Construction Bureau should conscientiously implement the requirements of the Measures for the Management and Assessment of Quality Supervision Institutions and Personnel of Housing Construction and Municipal Engineering in Yunnan Province and the Measures for the Management and Assessment of Safety Supervision Institutions and Personnel of Housing Construction and Municipal Engineering in Yunnan Province, strengthen the construction of supervision teams, and co-ordinate the supervision forces of market access, bidding, contract filing, construction permit, quality and safety, administrative law enforcement and other links, and establish a comprehensive law enforcement mechanism. Provide adequate protection in terms of personnel, funds and equipment. , maintain the stability of the supervision team, strengthen the professional skills training of supervisors, and comprehensively improve the supervision and law enforcement level of the construction market and project quality and safety. Encourage local governments to purchase services and entrust qualified social forces to conduct supervision and inspection.
Verb (abbreviation of verb) implementation steps
(1) Mobilization and deployment (before 20XX May 1 day)
Xxxx All relevant departments should attach great importance to it, improve their ideological understanding, and actively deploy and mobilize to carry out promotion actions.
(2) Organizing the implementation (May 20XX to February 2065438 +09 19)
Xxxx All relevant departments should strengthen supervision and inspection, and strengthen the implementation of responsibilities. On the basis of strengthening daily supervision and inspection, spot check and sampling inspection, we will conduct a thorough investigation on the projects under construction in this area every quarter.
(3) Summary and analysis (65438+ February every year)
Xxxx Planning and Construction Bureau should summarize the work of improving project quality and safety in stages, and carry out the next work according to the instructions of leaders and superiors if the analysis is insufficient.
Work requirements of intransitive verbs
(A) attach great importance to and strengthen leadership
Xxxx All relevant departments should attach great importance to the quality and safety promotion activities of this construction project, adhere to the people-oriented, people-oriented, and stand at the height of safeguarding the fundamental interests of the people to further improve their understanding of the quality and safety promotion activities of the project.
(2) Strengthen inspection and strive for practical results.
Xxxx All relevant departments should strengthen the guidance, coordination, supervision and inspection of project quality and safety improvement actions. Inspection should be combined with daily supervision and special action requirements, and illegal acts in rectification actions should be punished according to laws and regulations.
(3) Overall coordination and orderly progress.
Xxxx Planning and Construction Bureau should coordinate the work of all relevant departments and arrange the promotion action, so as to organically combine it with the daily supervision of quality and safety, construction market supervision, bidding management and seismic fortification review, promote each other and advance in an orderly manner. According to the key tasks and time schedule of this plan, we will advance in an orderly manner to ensure that the promotion actions are completed on schedule with high quality and achieve the promotion effect.
(4) Pay attention to publicity and create an atmosphere.
Vigorously carry out the propaganda work of quality and safety improvement activities of construction projects, make full use of local newspapers, radio, television, internet and other media, and widely publicize the significance, progress and achievements of the improvement actions at multiple levels, through multiple channels and in all directions.
Construction project quality planning scheme 3 I. Theme, time and activity organization
The theme of "Quality Month" in 20xx is "Innovation improves quality, and famous brands promote development".
(2) Activity time: September 1 to September 30th.
(3) Organizational structure
1, leading group of "Quality Month" activity of Kaiping Construction Bureau
Team leader: ×××××
Deputy Chief: xx years × months × days × months × days × months × days × months × days × months × days × months × days × months × days × months × days × months × days × months × days × days × months × days × months × days × months × days × months × days × months × days × months × months × months × days × months × months × days × months × months × months × months ×
Member: ××× year × month × day × month × day × month × day × month × day × month × day × month × day × month × day × month × day × month × month × day × month × day × month × month × day × month × month × month × day × month × month × month × month × month × month × month × day × month × month × month × month × month × month
2. Kaiping City Construction Bureau's "Quality Month" activity office is located in the construction management unit, with the director of ××××××××, and the deputy directors of ××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××
Second, the main tasks of "Quality Month" in 20xx
(1) Strengthen the quality responsibility of the construction drawing review organization. Conduct special inspections on the quality behavior of the construction drawing review organization and the quality of drawing review;
(two) to further standardize the engineering quality testing market and testing behavior. To carry out special inspections on the testing behavior and testing ability of testing institutions;
(three) to strengthen the supervision and management of supervision enterprises to fulfill their quality responsibilities. Focus on the inspection of the project supervision institutions and personnel in place, as well as the performance of supervision duties in construction quality control;
(4) Strengthen the quality supervision of residential projects. Carry out inspections on the prevention and control of common quality problems in residential projects and the handling of engineering quality complaints in construction enterprises.
Three. Arrangement of "Quality Month" in 20xx
(1) Do a good job in publicity and create an atmosphere of "Quality Month" activities.
Before September 20th, large-scale publicity slogans and quality banners of "Quality Month" with the theme of "Innovation improves quality, famous brands promote development" were hung on all construction sites in the city, especially on both sides of main streets. The publicity column of "Quality Month" was set up in each construction site, and all construction workers were organized by each enterprise to carry out the knowledge education on engineering quality, hold a lecture on "Twenty Technical Measures to Prevent Common Quality Diseases in Guangdong Residential Projects", carry out publicity and education activities to eliminate common quality diseases, improve the engineering quality awareness of construction managers and front-line production workers, and vigorously create the atmosphere of "Quality Month" activities.
(two) seriously carry out inspections, implement quality responsibilities, and standardize quality behavior.
Before September 20, all construction enterprises should conduct a construction quality inspection on all construction sites of the enterprise in accordance with relevant standards and specifications, focusing on the residential projects under construction, eliminating common quality defects such as hollowing, cracking and leakage, and immediately rectifying the problems found; Each supervision enterprise shall inspect the performance of quality control responsibility and supervision work, and take effective measures to implement rectification for existing problems; All drawing inspection agencies and inspection agencies shall, in accordance with the provisions of the state on the responsibility for drawing inspection quality or the management of engineering quality inspection, inspect the quality behavior, quality inspection or inspection market, inspection behavior and inspection ability of their own units, and immediately rectify any problems found.
(3) From September 18 to September 23, the Municipal Construction Bureau organized a general inspection of the quality of construction projects (combined with the general inspection of quality and safety in the third quarter). On September 25, our bureau held a summary meeting of the "Quality Month" activities in 20xx, praising the enterprises that implemented the work requirements of the "Quality Month" activities, carefully checked themselves, put corrective measures in place, and ordered them to improve the engineering quality rapidly.
Four. Activities require
(a) the construction, supervision enterprises, engineering quality inspection institutions, drawing review institutions should strengthen leadership, elaborate organization, elaborate arrangements, around the theme of this year's "quality month" activities, combined with the actual situation of the department, formulate specific activity plans, and effectively implement the 20xx "quality month" activities. Through the "Quality Month" activities, around the national requirements for quality work, we will vigorously implement the strategy of winning by quality, mobilize and guide managers at all levels and construction workers to improve their quality awareness, establish a correct concept of quality honor and disgrace, form an emphasis on quality progress, advocate independent innovation, continuously improve the quality level of construction projects, and create a harmonious and stable social environment.
(3) All construction, supervision, engineering quality inspection institutions and drawing review institutions should take the "Quality Month" activity as an important task to solve the current engineering quality problems, and take this opportunity to seriously analyze the main problems existing in the current quality management, put forward suggestions to strengthen quality management, and report the summary of the "Quality Month" activity to the construction management unit (Quality Month Activity Office) of our bureau before September 22nd. By the "Quality Month" activity office of the city, according to the work situation of the "Quality Month" activity in our city and the materials submitted by various departments, a summary of the work of the 20xx "Quality Month" activity in our city was formed and submitted to the Construction Management Office of Jiangmen Construction Bureau before June 9 10.
In order to actively respond to the 23rd "Quality Month" activity in China, according to the notice of the implementation plan of the "Quality Month" activity of Ningbo Municipal Engineering Safety and Quality Supervision Station on 20 12, the project department plans to organize the "Quality Month" in September of 20 12 to implement the spirit of the "Quality Month" of the group company and improve the quality management level and the quality of the project entity.
I. Guiding ideology
Guided by Scientific Outlook on Development, with brand, standard, service, reputation and benefit as the core, and around the spirit of "Year of Quality Improvement" and "Year of Quality Management", we will vigorously implement the strategy of winning by quality, strive to create a good atmosphere in which all staff attach importance to quality, comprehensively improve quality awareness, and strive to improve the quality management level of the project department.
Second, the theme of the event
Improving quality level and promoting scientific development
Third, the activity time
September 20xx1~ September 30th 20xx.
Fourth, organize and lead.
In order to strengthen the organization and leadership of the "Quality Month" activities of the project department, the 20 12 "Quality Month" activities leading group is specially established.
Team leader: Bao Fangfang
Deputy Team Leader:, Yang
Members:, Zhang, Lin Meng, Hu Yunhua, Zhu Feng and Chen Yingkai.
Verb (abbreviation of verb) activity content
All activities during the "Quality Month" are carried out in accordance with the company's activity requirements and combined with the engineering practice of the project department. The whole activity is divided into three stages, and the schedule is shown in the attached table 1. The specific process is as follows:
The first stage: mobilization and publicity stage
1. Vigorously create a strong atmosphere of "Quality Month"
(1) Before the launch of the "Quality Month" activity, the project department should first organize a mobilization meeting around the theme of the "Quality Month" activity, mobilize and deploy the "Quality Month" activity, and guide all employees to actively participate in the "Quality Month" activity.
(2) Office and living quarters of the project department, main construction roads, entrances and exits of main construction buildings, etc. Hang banners and slogans, make exhibition boards, publicize quality regulations and quality culture, and create a good atmosphere in which all staff attach importance to quality.
The second stage: the activity implementation stage
1. Carry out special knowledge lecture learning activities.
The project department will take the "Quality Month" activity as an opportunity to give a lecture on the construction quality knowledge of reinforced protective layer thickness in combination with the construction practice of the project department. The training targets are the on-site construction personnel, quality inspectors and steel bar staff of the project department. The main content is the relevant specifications, standards and construction technology for the construction of steel bar protective layer thickness.
In addition, the project department will actively organize quality management personnel to learn the company's quality, environment and occupational health and safety management system documents and quality management manuals to ensure the smooth realization of annual quality objectives and indicators.
2. Organize on-site inspection and appraisal.
In order to show the achievements of the "Quality Month" activity, the Quality Inspection Department organized the activity leading group, each operation team and main construction management personnel to check and compare the completed operation surfaces according to the inspection plan listed by the quality control risks, and form a text. Reward those with good quality, punish those with poor quality and put forward rectification measures, and order the operation team to carry out rectification.
3. Carry out special quality inspection activities.
In response to the company's call, the project department actively carried out the "Seven Checks" activities with the main contents of "checking quality awareness, quality level, quality system, standard implementation, measurement and testing guarantee, site management and quality loss", and conducted comprehensive quality inspection and hidden danger investigation on key control contents and key points of project quality through special inspection and comprehensive inspection.
4. Theme activity of "Quality Innovation, Leading First"
The project manager organizes, guides and drives the members of the project department. The activity is divided into two parts.
(1) Organize quality-centered learning and training activities in the project department.
(2) The project manager personally formulates an experienced technical director to explain the common quality defects and corresponding measures among the construction site management personnel, so as to let everyone know how to minimize the incidence of common quality defects and how to prevent them in the best way.
;