A, the project must be provided by the construction unit intends to design construction drawing seriously came to prevent unreasonable design or design documents have omissions and lead to construction safety accidents.
Second, the project should be based on the scale and characteristics of the project, intends to formulate targeted and effective safety technical measures or schemes in the construction organization design or construction scheme.
Three, safety technical measures and programs must comply with the relevant laws and regulations of the state and the relevant standards, norms and procedures of the industry; The actual situation, engineering characteristics and working environment of the construction site must be fully considered.
Four, safety technical measures and programs must be designed, calculated, refined and written according to the needs, and the implementation of grading examination and approval system.
5. Before the safety technical measures and schemes are prepared or approved, the corresponding work shall not be carried out.
In the process of engineering construction, the original safety technical measures and schemes should be revised and changed according to the actual changes of the site and external environment.
Seven, the original safety technical measures and the revision of the scheme must be in accordance with the examination and approval procedures in a timely manner for revision and approval procedures, otherwise the construction work should be stopped.
Eight, the greater the risk and more than a certain size of the greater the risk of subdivisional work should be in accordance with the provisions of the greater the risk of subdivisional work safety management measures ","China Construction Sixth Bureau Co., Ltd. greater the risk of subdivisional work safety management measures ","China Construction Sixth Bureau Co., Ltd. greater the risk of subdivisional work reporting system "before the construction, prepare a separate safety special construction plan, and organize experts to carry out the corresponding demonstration work.
Nine, the project safety production supervision and management departments should keep the attachments of various safety technical measures and programs.