Summary of quality engineer's probation work

Summary of quality engineer's probation work

Summary is a kind of written material to review and analyze the performance of study, work and life in a certain period, which can effectively exercise our language organization ability. Let's sum it up. What kind of summary should you have read? The following is a summary of my work as a quality engineer during the probation period. Welcome to read the collection.

Summary of work of quality engineer during probation period 1 Since joining the company, I have worked as a technician in _ _ _ _. In my work, I respect leaders, unite colleagues, be modest and prudent, be sincere and responsible, have good team spirit, pay attention to group interests and have a strong sense of collectivity. Can fully cooperate with others, fully listen to their opinions and suggestions, self-motivated, easy-going, easy to communicate, and can quickly integrate into the work team.

In learning, make progress hard, actively participate in grid training and learning, temper business and improve. Actively participate in the training and study of related knowledge of this major, paving the way for the smooth work in the future and laying a good foundation.

In my life, I have good living habits, a full and organized life, a rigorous attitude, a good style of life, enthusiasm and generosity, honesty and trustworthiness, helpfulness, good working principles, being able to live in harmony with everyone, being hardworking and independent.

In short, over the past year, I have done some work and made some achievements, but there are still many gaps from the requirements of leaders and comrades, mainly due to insufficient systematicness and depth of study, weak sense of innovation in work and insufficient creativity. In the future work, I will carry forward my achievements, overcome my shortcomings, do my work and career well with a down-to-earth and conscientious attitude, strengthen my enthusiasm, live up to the expectations of leaders and comrades, and make my due contribution to the development of the enterprise!

Summary of probation period of quality engineer II. First of all, I am very grateful to the company leaders for trusting me and giving me the opportunity to express myself and improve myself. Thank the leaders of the unit and colleagues around me for their guidance and help in my work. The relaxed and harmonious working atmosphere of the unit and the United and pragmatic cultural background helped me to integrate into the big family of the company and enter the work role. It is a great honor to join this long-term team responsible for enterprise development. Now I will summarize my internship, the shortcomings of my current work and my work plan as follows.

One: My main gains and skills in my work:

1 Basic understanding of the production process of products; Process arrangement, personnel status, grouping, division of labor methods, and job responsibilities.

2. Have a preliminary understanding of product technical standards; National and industry standards, some basic information about the company's industry.

3. Make a clear distinction according to the requirements of the executive company and the positioning of product grades in the market and customers.

4. Mastered the product quality requirements and other related working knowledge; And have the job skills required for product quality audit and quality control positions. Can carry out reasonable process quality control according to customer's requirements for product performance. And can make correct cause analysis and judgment on the problems in the process of quality control, and deal with the process quality accidents in time; So as to guide the implementation of inspection and test.

Two. Through this period of work, I found that the work I am responsible for at this stage has the following shortcomings and areas worthy of improvement:

1 inspection document; There is no written inspection work instruction. At present, production line inspectors only carry out inspection according to the items on the inspection list. Most of the ways and means come from past experience and mutual information transmission. Such an operation will lead to the fragmented inspection, which is not conducive to the management of inspectors.

I plan to draft the inspection operation guidance document used by this department for production after further mastering the detailed information.

2. There are no detailed data and records about the actual quality of the production process; Statistics without data and records are not conducive to analysis, guidance and control of production.

I will plan to establish complete record control for the first, second and last inspection of the process in my future work. Strive to carry out and implement this work, strengthen supervision and inspection, and ensure that the quality control work is implemented.

At present, our inspectors don't have a good understanding of quality work, and some new employees didn't receive corresponding education and training when they joined the job. So that some inspectors can't complete product inspection and product performance test alone.

I plan to suggest that this department organize relevant education and training (such as AQL application, mechanical knowledge, hardware knowledge, process equipment cognition, tool use, instrument knowledge, mechanical drawing recognition, quality concept, etc.). ), and combined with the skill status for assessment and appraisal.

4. Management of nonconforming products; At present, there is no detailed record or accounting system for the management of nonconforming products, which is not conducive to the development of quality control, and often causes the same problem to recur, which can not fundamentally solve the generation of nonconforming products.

Summary of probation period of quality engineer 3 Time flies and time passes. On this day when we bid farewell to the old and welcome the new, we look back on the work of the past year, and with the support and help of the company's leaders and colleagues, rely on our professional foundation and work experience, follow the company's unified deployment and requirements, closely focus on the "eternal" construction project, and fully perform the management functions of the engineering department with the goal of low consumption, high efficiency, quality assurance and on schedule. Be brave in innovation, coordinate and cooperate, work hard, do everything possible to ensure the realization of all the established goals throughout the year and better complete all the tasks assigned by the company. The overall construction of the engineering department has also jumped to a new level. The work of the past 20 years is briefly summarized as follows:

I. Completion of tasks throughout the year

1. It is both an opportunity and a challenge for me to get in touch with ground source heat pump at the beginning of the year, and it is more important for me to meet such a challenge. To this end, I use my spare time to collect and learn more about ground source heat pump, so as to consolidate my professional knowledge and meet the challenge.

2. Since mid-March, I have assisted General Ye and Coral Sand Community in more than ten rounds of negotiations on site leveling. Finally, the two sides decided to implement it in the following three steps:

1 Both parties determine the earthwork quantities of A30, A29 and A33, in which A30 is 120_0M3 and A29 and A33 are 60000M3.

Both parties shall specify the construction contents: drainage, dredging and earthwork construction.

3 Both parties have made it clear that the unit price of earthwork leveling is 18 yuan /M3.

Finally, the two sides decided that the total price was 3.5 million yuan (paid in one lump sum).

3. In mid-March, the bidding work of pile foundation construction unit and supervision unit was ready.

4. The measured municipal elevation provided by zhijiang city Construction Bureau is inconsistent with the actual municipal road elevation, and the four-line diagram provided by the plan is inconsistent with the actual surveying and mapping data of the parcel, which is then reflected to the design institute, which adjusts the overall evaluation with the measured data.

5. Draft the supplementary agreement and earthwork leveling contract between the supervision unit and the pile foundation unit.

6. In the process of cooperating with Pan Xiao in applying for the construction permit, in the early stage of bidding, I conducted a comprehensive understanding and research on the bidding work and became familiar with the policies and regulations of key links.

7. Solve the water and electricity problems at the construction site.

In mid-August and mid-July, due to the tight time and heavy workload of site leveling in A30 Bid Section, I arranged all the work of site earthwork leveling, and adopted the methods of stubble pressing, interlocking and overall promotion, and timely connected the upper and lower links to ensure the normal development of pile foundation construction.

9. In the process of pile foundation construction, due to the complicated geological conditions, the design length of pipe pile does not meet the actual geological requirements. I organized personnel to carry out geological exploration again, which overcame the difficulties of water cut, power cut and temporary construction, helped the exploration unit complete the geological exploration task on time, and ensured the smooth progress of pile foundation work.

At the beginning of 10 and 12, the foundation pit support and earthwork will be carried out. Due to the tight construction period and the heavy tasks of foundation pit support and earthwork, the construction unit has to carry out a lot of night construction besides daytime construction. In order to ensure the construction progress, I often go to the site to follow up the construction under unfavorable natural factors such as 12 winter night and rainy day, and track it day and night to coordinate and solve it for the construction unit at any time.

Because of the complexity involved in the construction, I haven't had a day off since the project started. I have to leave the construction site after 9: 00 every night, giving up the opportunity to rest on holidays, and always insisting on timely coordination and solving various problems encountered in the construction.

Second, the work plan for next year

1. Strengthen self-study and improve professional level.

Years of accumulated work experience have made me feel a heavy burden on myself, and also made me deeply feel the importance of learning. Only by constantly maintaining and improving one's work and study ability can one have sustained fighting capacity and work innovation ability. Over the past year, I have worked hard to broaden my personal knowledge, strengthen my study of real estate specialty and related legal knowledge, strengthen my understanding of the context and trend of real estate development, as well as the surrounding environment and the development of the same industry, deeply understand the overall planning of the company, and know all kinds of situations of the company like the back of my hand. In the coming year, I will continue to take study as an important work plan to improve my practical working ability and professional quality, adapt to the development of the times and the company, and contribute my due strength to the development of the company.

2. Strive to grasp the engineering quality of the "Eternal" business center project.

"Eternal" business center project is a key project in the city, and it is particularly important to grasp the quality of the project. In management, I always adhere to the concept of "carving by digging", comprehensively implement refined and scientific management, conscientiously implement various measures to create excellence, carefully do every working procedure and every link, and strictly supervise and control. While assisting the engineering supervision company, it has gradually formed its own engineering quality supervision system. With supervision as the main task and self as the supplement, we will strive to build the "eternal" business center project into a provincial excellent project.

3. Complete the basic project of "Eternal" business center project.

In the next year, in order to successfully complete the main project of the "Eternal" business center project, especially the basement and waterproof layer construction in the main construction stage, considering the rainy weather in Hangzhou, we will improve the company's capital utilization rate and save the company's resources, such as using small well point precipitation to overcome the problems of high groundwater level and rainy season construction during the construction process, and successfully complete the foundation project.

Looking back on the work in the past year, although some achievements have been made and affirmed by the company leaders, these achievements can not be achieved without the support and help of the company leaders, the encouragement and help of various brother departments and the efforts of the engineering team to sum up the achievements. I still see many shortcomings, such as strengthening the on-site management experience and better improving the company's resource utilization. The summary of the results only makes me face the actual work situation more objectively, and also encourages me and my team members to make persistent efforts to achieve better work results next year and make progress and growth together with the company. I hope leaders and colleagues will criticize and correct me.

Summary of quality engineer's internship 4 Time flies. In a blink of an eye, I graduated from university for more than a year. During this period, I was engaged in engineering quality management in the gravel branch of the Eighth Hydropower Bureau. In my work practice, I not only deepened my understanding of the theoretical knowledge I learned in school, but also got a better understanding of the knowledge that I didn't touch or didn't touch deeply in previous books.

As a project quality manager, I first received quality management training. Through training, I learned the key points of engineering quality management, engineering quality management norms and other related professional knowledge. Quality control is the core of engineering construction. Engineering quality is a systematic process formed by design quality, construction quality and acceptance quality, and it is a comprehensive quality formed by cascade influence. The construction unit carries out the construction according to the design documents, and the quality is formed after our acceptance. Therefore, in terms of quality control, as far as my personal work experience is concerned, the following aspects should be adhered to in engineering quality management to achieve the quality control goal of civil construction management.

1, design quality, first of all, we should start from the source and pay attention to the control of design quality. Our design management department is the competent department of design quality control, and they have done a lot of work for this. However, due to their heavy workload, it is impossible to check it very carefully. Therefore, as a construction management department, it still takes a lot of time to carefully review the design documents before the start of construction, and at least ensure that the mistakes on the drawings are disposed as much as possible half a month after the start of construction. If the upstream design documents are of good quality, there will be no mistakes in architecture, structure and coordination with other disciplines, and many changes will be reduced in the construction process.

2. Construction quality is the center of on-site quality control and the top priority of construction management. The influencing factors of construction quality include personnel, mechanical equipment, construction scheme, materials and environment. Therefore, the construction quality control should also start from the following aspects.

Because the on-site construction personnel are not professional quality inspectors, there are some deficiencies in the preliminary understanding and quality awareness of engineering construction. We will ask the builders to attend the weekly meeting, directly or indirectly point out the importance of quality problems, instill engineering quality consciousness in them, and make them have a basic understanding and clear understanding of the quality requirements and quality objectives of engineering construction. In addition, at the weekly meeting, the representative problems in construction, such as concrete defects and positioning deviation of embedded parts, were analyzed together with subcontractors, and the deficiencies were clearly pointed out and rectified within a time limit, thus prompting subcontractors to continuously improve management and raise quality awareness and nuclear power awareness.

In addition, adhere to the policy of "prevention first", strengthen the control of construction quality in advance and process, change the construction quality inspection after completion into the quality inspection of construction process and working procedure, attach importance to the post-event control of construction quality, and feed back relevant experience to the next work to continuously improve the quality level. In the aspect of pre-control, it is necessary to formulate practical and detailed construction plans for important parts of the construction, especially for the difficulties and possible quality problems in the construction, and to clarify the specific treatment methods; In the arrangement of manpower, mechanical equipment and construction scheme, clear requirements should be put forward to facilitate the subcontractor's preparation before construction. After the construction plan is formulated, the subcontractor shall promptly make technical disclosure to the specific implementers, clarify the requirements and responsibilities, and check the construction preparation process.

In the aspect of process control, by setting witness points, the quality control of the main construction procedures on site is carried out. At the same time, often patrol the site, check the site construction situation, and correct the situation that does not meet the construction technical requirements in time. In addition, in the process of concrete pouring, adhere to the sidelines, pay attention to the observation of concrete pouring time, concrete supply, weather changes, steel protective layer trampling and other issues, and carefully check the whole construction process.

In order to improve quality control, post-event control is also an indispensable part. In the process of civil construction, subcontractors often pay insufficient attention to this aspect. Post-event control requires that on the one hand, the quality after construction should be checked in time; More importantly, it is necessary to sum up what always happens during or after construction in time and feed it back to the relevant departments to improve the subsequent related construction, which is conducive to the further improvement of the project quality.

3. Check the quality. Before construction, witness points shall be set for key processes in the construction process. When the construction reaches these steps, the contractor will inform the construction party in advance. For witness points, the construction team shall conduct self-inspection first, and the follow-up work can only be carried out after the quality plan of the builder, quality inspector and supervision engineer is signed and released. As long as these four-level quality inspections can effectively perform their duties, the quality of the project can be guaranteed. However, because the quality control personnel at the team level are all technicians and team leaders of subcontractors, there is the builder himself, who is not only the concrete executor of the construction, but also the verifier of its construction results, lacking the independence required for quality verification. Therefore, quality acceptance mainly depends on quality inspectors and supervision engineers.

In the process of acceptance, we should adhere to the quality standards and strictly implement the standards stipulated in the design documents and contracts. Standards are the yardstick for testing the quality of construction, and databases are the foundation. Whether the construction quality meets the requirements must undergo strict inspection and be based on data. In the process of construction inspection, we often meet the requirements of the contractor to relax the standard for one reason or another. In this case, every quality inspector should clearly support the requirements of quality standards and strictly control the quality. If the design is really problematic and cannot be implemented on site, it must be changed or clarified normally before implementation.

The longer I work, the more I feel that I lack knowledge and ability, such as understanding and applying the contract, predicting and controlling the construction progress, and coordinating the construction of various units on site as a hub, and I feel that I am not doing very well. Fortunately, after consulting my colleagues, I understood the direction of my efforts; As for schedule control, it should be carried out as soon as possible. As long as there is no problem with the design documents, the on-site personnel, mechanical equipment and materials are in place, and the construction progress is pre-programmed, the progress control can be basically guaranteed; For the training of on-site coordination ability, on the one hand, we should pay more attention to how other engineers deal with problems and learn more, on the other hand, we should think more, try more and consult more, and establish our own ways and methods to deal with problems.

Working in accordance with contracts and procedures is only the most basic requirement for an engineering quality manager. How to use contracts and procedures flexibly and solve many unclear or out-of-contract things reasonably is the real consideration of work ability. By observing and learning how to solve such problems in the work of other engineers and leaders, my working ability has been improved to a certain extent. I know that only by constantly learning and accumulating, constantly reflecting on progress, avoiding arrogance and rashness, working hard and improving my ability to deal with problems can I grow into a qualified construction quality management engineer as soon as possible.

Summary of quality engineer's internship work 5 According to the unified deployment and requirements of the company, closely surrounding the "eternal" construction project, with the goal of low consumption, high efficiency, quality assurance and on schedule, fully fulfilling the management functions of the engineering department, being serious and responsible in project management, being brave in innovation and coordination, it is really solid.

Completion of work tasks throughout the year

The beginning of 1 and X is both an opportunity and a challenge for me, and it is more important for me to meet such a challenge. To this end, I use my spare time to collect and learn more about ground source heat pump, so as to consolidate my professional knowledge and meet the challenge.

2. Since mid-March, I have assisted General Ye and Coral Sand Community in more than ten rounds of negotiations on site leveling. Finally, the two sides decided to implement it in the following three steps:

1 Both parties have defined the earthwork quantities of a30, a29 and a33, in which a30 is 1_0m3, a29 and a33 are 60000m3.

Both parties shall specify the construction contents: drainage, dredging and earthwork construction.

3 Both parties have made it clear that the unit price of earthwork leveling is 18 yuan /m3.

Finally, the two sides decided that the total price was 3.5 million yuan (paid in one lump sum).

3. In mid-March, the bidding work of pile foundation construction unit and supervision unit was ready.

4. The measured municipal elevation provided by zhijiang city Construction Bureau is inconsistent with the actual municipal road elevation, and the four-line diagram provided by the plan is inconsistent with the actual surveying and mapping data of the parcel, which is then reflected to the design institute, which adjusts the overall evaluation with the measured data.

5. Draft the supplementary agreement and earthwork leveling contract between the supervision unit and the pile foundation unit.

6. In the process of cooperating with Pan Xiao in applying for the construction permit, in the early stage of bidding, I conducted a comprehensive understanding and research on the bidding work and became familiar with the policies and regulations of key links.

Do everything possible to ensure the realization of the set goals throughout the year and better complete the tasks assigned by the company, and the overall construction of the engineering department has also jumped to a new level.

;