The method of setting budget quota for frame structure;
1. Earthwork: site leveling, earthwork excavation (manual and excavator), earthwork transportation (site and transportation) and earthwork backfilling (earthwork excavation, transportation and backfilling). Pile foundation, taking vibrating cast-in-place pile as an example: piling (pay attention to the empty part), pile tip embedding, reinforcing cage and pile head drilling.
2. Cushion: Cushion and waterproof. Foundation and structure: beams, slabs, columns (whether there are arcs, slopes, etc. ). This part of the main structure should be fine.
3. Masonry project: what kind of brick, mortar type, one brick and a half brick or more bricks. In some places, lighting fees are added to meet certain conditions in the basement. Note that some foundations are covered with brick membranes.
Classification of construction project budget:
1, investment estimation.
Investment estimation generally refers to the economic documents prepared by the construction unit to determine the corresponding total investment of the construction project at different stages such as planning, project proposal and design task book when the construction unit applies to the state for the proposed project or the state makes a decision on the proposed project.
2. Design budget.
Design budget refers to the budget quota or budget index prepared by the design unit according to the preliminary design stage or the expanded preliminary design drawings. The cost quota or charging standard, the natural, technical and economic conditions of the construction area and the budgeted price of equipment, etc. , as well as the documents to estimate and determine the total construction cost of the construction project from preparation to completion acceptance.
3. Revise the budget estimate.
Revising the budget estimate means that in the technical design stage, with the deepening of the design content, it may be found that the construction scale, structural nature, equipment type and quantity are different from the original content. Therefore, the design unit establishes the regional natural, technical and economic information and equipment budget price according to the technical design drawings, budgetary estimate indicators or budgetary estimate quotas, and various fee charging standards.