The tenderer shall entrust a qualified tendering agency to handle the bidding matters. Article 5 A tenderer shall prepare tender documents according to the characteristics and needs of thermal power, wind power and photovoltaic projects. The tender documents include all substantive requirements and conditions such as the technical requirements of the construction project, bidder qualification examination standards, bid quotation requirements and bid evaluation standards, and the main terms of the contract to be signed.
The tenderee shall publicly release the tender announcement to the public. Article 6 A bidder shall prepare the bidding documents in accordance with the requirements of the bidding documents. The bidding documents shall respond to the substantive requirements and conditions put forward in the project bidding documents. Article 7 The development and reform department of the autonomous region shall, in accordance with the provisions of relevant laws and regulations, establish an expert database for bid evaluation of power projects, including experts, scholars, engineering technology and management personnel with rich experience in power planning, engineering construction and operation and maintenance. Article 8 The bid evaluation committee established by the tenderer according to law shall be responsible for bid evaluation. The bid evaluation committee is composed of technical and economic experts and representatives of the tenderee, with an odd number of members of more than five, of which the technical and economic experts shall not be less than two thirds of the total number of members.
The bid evaluation experts are randomly selected from the power project bid evaluation expert database. Article 9 The bid evaluation committee shall evaluate and compare the bid documents according to the bid evaluation standards and methods determined in the bidding documents. After completing the bid evaluation, the bid evaluation committee shall submit a written bid evaluation report to the tenderer and recommend qualified candidates for winning the bid. The tenderer shall determine the winning bidder according to the written bid evaluation report put forward by the bid evaluation committee and the recommended candidate winning bidders. The project bidding related business stipulated in Article 10 of the Interim Measures shall be carried out on the public resource trading platform of the autonomous region. Eleventh in violation of the provisions of the Interim Measures, should bear legal responsibility, in accordance with the provisions of relevant laws and regulations. Twelfth autonomous region development and Reform Commission in accordance with the "People's Republic of China (PRC) Bidding Law", "People's Republic of China (PRC) Bidding Law Implementation Regulations", combined with the actual situation of thermal power, wind power, photovoltaic project construction, formulate specific implementation rules. Thirteenth the Interim Measures shall come into force as of September 30th, 20 16.