Kelin Expressway, namely Kelan-Linxian Expressway. The highway network planning of Shanxi Province "three verticals, twelve horizontals and twelve rings" is a part of the longitudinal highways in western China. Zhong Da consults the information of CBI Construction Network to obtain the relevant information of Kelin Expressway:

Kelin Expressway is an important part of the national G59 Hubei Expressway. Connecting the fourth horizontal (Wutai Changchengling-Baode) and the fifth horizontal (Pingding Yangshuzhuang-Linxian Kehuzhai) and Jingle Feng Run-Xingxian Heiyukou connecting line in Shanxi expressway network planning. The expressway number in Shanxi Province is S85.

Brief introduction of engineering

Maolin Expressway was approved by Shanxi Provincial Development and Reform Commission in document [20 10] 1346. The project owner is Maolin Expressway Construction Management Office. The construction of this project will greatly improve the traffic environment along the line, play a greater role in diverting provincial roads, effectively relieve the traffic pressure of S2 18 and S3 13 in kelan county, Xingxian and Linxian, make the highway traffic in this area smoother, give full play to the advantages of natural resources and tourism resources, and greatly promote the rapid economic development of kelan county, Xingxian and Linxian.

investment scale

The total length of Kelin Expressway is125km, including 35km in Kelan, 64km in Xingxian and 26km in Linxian. It starts from Xi Hui Village, Gaojiahui Township, kelan county, crosses Xinbao Expressway, passes through two cities, three counties, 12 townships and 65 natural villages, and connects with Linli Expressway in Chenjiazhuang Village, Linquan Township, Linxian County. The design speed is 80km/h, and it is built according to the standard of two-way four-lane expressway. The construction and installation cost of the project is 8.7 billion yuan.

quantity

The main works of the whole line are: subgrade earthwork 48 1.5 million cubic meters, large and medium-sized bridges 1.06, 23 tunnels and 225 small bridges and culverts. There are 4 interchanges, 1 hub, 2 service areas, 1 parking area, 3 tunnel management stations, 3 maintenance work areas and 4 toll stations. The subgrade bridge and tunnel project consists of *** 12 construction contract section and 7 supervision contract sections.

job schedule

Kirin Expressway started construction at the beginning of 20 1 1;

Complete the pavement construction task at the end of 20 12;

On June 25th, 2065438+0/KLOC-0, Yuan, secretary of Shanxi Provincial Party Committee, went to CCCC No.1 Bureau to inspect and guide the hub.

On June 201410/6, Kirin Expressway was officially opened to traffic.

The above is the introduction of Zhong Da Consulting to Kelin Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.