Model labor contract for electric power engineering

The signing of the contract is to protect the interests of both parties, and it is also the terms after negotiation between the two parties. The following is the "Model Labor Contract for Electric Power Engineering" compiled by me for your reference only. Welcome to read it.

Model labor contract for electric power engineering (I) Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Planned working hours: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

As one of the contractors in charge of power grid projects, Party A has established a labor contract relationship with Party B for the specific needs of some projects. In order to clarify the safety responsibilities of both parties to the labor contract, ensure the safety of engineering construction and prevent accidents, Party A and Party B have reached the following agreement through consultation:

I. Party A's Safety Responsibility

1. According to the Regulations on Safe Production issued by _ _ _ _ Power Grid Corporation and the Regulations on Safety Management of Outsourcing Projects, Labor Subcontractors and Temporary Workers issued by _ _ _ _ Power Grid Corporation, Party A is responsible for reviewing the construction safety qualification of the projects contracted by Party B.. Review the construction business license and construction qualification certificate issued by relevant government departments, the qualification certificate of legal representative (organization code certificate), the construction resume held by Party B, and the configuration of relevant project managers, responsible persons and technicians of the construction unit and the safety construction records in recent three years. After passing the qualification examination, Party A shall issue a safety construction qualification certificate to Party B in time.

2. Before the project starts, Party A shall make a comprehensive safety technical disclosure to Party B's responsible person and engineering technicians, and have complete records or materials. Safety Technical Disclosure According to the Provisions on Investigation of Electric Power Production Accidents of China Power Grid Co., Ltd., please make a comprehensive safety technical disclosure to the contractor's responsible person, engineering technicians and safety supervisors before the construction starts.

3. Party A is responsible for reviewing the technical quality of project construction leaders, engineering technicians and workers. Review and confirm the qualifications of the project working ticket issuer and working person in charge.

4. Party A is responsible for reviewing the organization and construction design of the project, and formulating safety measures in advance according to Party B's operation requirements in dangerous power production areas.

5. Party A is responsible for inspecting and supervising the implementation of the Regulations on Safety Production in Construction Projects (the State Council Order No.393), the Regulations on Safety Production in Electric Power Industry and the Regulations on Safety Production in Electric Power Construction by the construction unit in safety management.

6. Party A shall inspect the safety and quality of engineering institutions on _ _ _ days every month, and conduct random checks from time to time. Focus on the on-site safety management and safety measures such as special operations personnel holding certificates and on-site safe electricity use. In particular, check the safety situation at the site, fill in the safety inspection notice in time for the problems found in the inspection, issue the rectification notice for serious problems and impose corresponding economic penalties.

7. Use the standard evaluation system of safety, health and environment management in power grid construction to inspect and evaluate the management of the project department and the construction site, and diagnose and judge Party B's safety, health and environment management behavior accordingly.

8. Other safety and labor protection matters agreed by Party A in this Agreement.

II. Party B's Safety Responsibility

1. Seriously implement the laws, regulations, rules and regulations of the state and the electric power industry on safety in production and occupational safety and health, and formulate detailed implementation rules according to the actual situation, but it shall not conflict with the provisions of the higher authorities and shall not lower the safety standards.

2. Party B shall establish and improve the safety management organization and implement the post safety production responsibility system according to the relevant regulations of the state and the power industry.

3. Workers who recruit, employ and change jobs must go through three-level safety education, emergency rescue training and professional technical training, and put on record after passing the examination, and can only enter their production site after being examined and approved by Party A. Party B shall conduct safety technical disclosure, safety education and safety publicity for the construction personnel, and strictly implement the safety technical plan.

Personnel who belong to special operations and dangerous operations stipulated by the state must receive professional training at the same time and hold the operation certificate issued by the competent government department before taking up their posts.

4. Arrange the project department and the construction site according to the Specification and Application Manual of Safety and Environmental Management Facilities for Power Grid Construction Projects, formulate various safety and civilized construction management systems and emergency plans, and require Party B to equip with sufficient safety appliances and safety books. Clear signs must be set up on the construction site, indicating the construction permit approval number, project name, names of all contractors, project management organization chart, project construction objectives (safety, quality and construction period) and main management systems. The site operation area is clearly marked, and special construction equipment storage places, material storage stations and garbage storage points are set up. The construction unit is responsible for protecting the signs on the construction site.

5. Abide by the labor discipline and rules and regulations on site, and strictly implement relevant regulations when entering the construction site. All personnel entering the construction site should wear work permits to prove their identity and ensure safe construction. Party B shall ensure that the safety protection facilities and safety warning signs on the construction site are complete.

6. According to the actual construction situation, Party B shall do a good job in wind and flood prevention, heatstroke prevention and cooling, fire prevention, electric shock prevention, falling prevention, etc. , safety measures should be in place.

7. Party B shall formulate corresponding labor protection articles distribution standards according to national laws and regulations on safety production and labor protection and relevant health regulations; Provide construction personnel with personal labor protection articles that meet the safety and health requirements of this type of work; According to the production characteristics of different posts, provide safety protection articles and safety appliances, and guide, supervise and check their use. All kinds of safety facilities and labor protection devices on the construction site must be inspected and maintained regularly to eliminate hidden dangers in time and ensure their safety and effectiveness.

8. All personnel entering the construction site must dress in accordance with "Electric Power Safety Regulations" and "Electric Power Construction Safety Regulations". Construction personnel shall wear various safety protection tools as required.

9. Use and management of safety appliances, safety protection facilities, hand-held power tools and electrical equipment. Must strictly implement the relevant provisions of the state and industry, must have the factory certificate, can be used after inspection, and establish the distribution, use and management system and ledger.

10. Party B shall use the evaluation system of safety, health and environmental management standards for power grid construction to conduct self-inspection and self-evaluation on the project department, construction site and team management.

1 1. Party B has a labor contract relationship with Party A, and it is strictly forbidden for Party B to subcontract the construction project.

12. Take legal responsibility for the authenticity of all documents and materials provided.

13. Other matters related to safety and labor protection agreed by Party B in this Agreement.

Three. Rules that Party A and Party B shall abide by.

After signing the construction safety agreement, Party A and Party B must strictly abide by the laws and regulations of the state, the rules and regulations of the electric power industry and the regulations of the electric power enterprises on infrastructure installation. * * * Abide by the Safety Regulations for Electric Power Industry, the Safety Regulations for Electric Power Construction and the Safety Regulations for Construction Projects promulgated by the former Ministry of Electric Power Industry (the State Council Decree No.393rd). * * * Abide by the Regulations on Safety in Production, Regulations on Safety in Production Rewards and Punishment, Regulations on Safety in Production Supervision, Requirements for Safe and Civilized Construction of Power Transmission and Transformation Projects, Detailed Rules for the Implementation of Safety, Health and Environment Management Measures for Power Grid Construction, Application Manual of Safety, Health and Environment Management Facilities for Power Grid Construction Projects, Safety Management Regulations for Outsourcing Projects, Labor Subcontractors and Temporary Workers, etc.

Four. Default handling

During the validity period of this agreement, if any of the above clauses are violated, resulting in safety accidents or potential safety hazards, the notice on printing and distributing the construction site management regulations of _ _ _ _ Power Grid Corporation (_ _ _ Power Grid Construction [XX] [XX]168) and _ _ _ _ Power Grid Corporation's Measures for Rewards and Punishment of Power Grid Construction Projects will be strictly followed.

Verb (short for verb) others

1. Party A shall provide Party B with necessary construction technical data and try its best to provide convenient construction conditions.

2. In the process of construction, if Party B suffers from accidental personal injury or death for which Party B is responsible, Party A shall do its utmost to help the wounded and people in danger in the spirit of humanitarianism, but all expenses required shall be borne by Party B. ..

3. According to the Single-phase Metering Device Rotation Reconstruction Project Contract signed by both parties, Party B shall pay a security deposit of RMB yuan for each single project (or one-time). The deposit shall be managed in a special account. Party A shall punish Party B for violating site safety regulations and notify the other party in writing. After the completion of the project, it shall be returned to Party B after deducting the total liquidated damages, and the insufficient part shall be made up by Party B..

The term of validity of this agreement is from _ _ _ _ to _ _ _ _ _.

Seven. This agreement is made in duplicate, with each party holding one copy.

Party A: _ _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Authorized representative of Party A: _ _ _ _ _ _ _ Authorized representative of Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Agent of Party A: _ _ _ _ _ _ Agent of Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model labor contract for electric power engineering (II) Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, both parties sign this contract on the basis of voluntary consultation on the construction of this building project for mutual compliance.

I. Overview of the Project

1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

3. Project content: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Second, the contract period

Construction period: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Three, the project cost determination, settlement and payment methods

1. The total project cost (including tax) is the transaction price of _ _ _ _ _ _ _ (RMB), in words (RMB) _ _ _ _ _ _ _ _.

2. Pay the advance payment in RMB only, in words: the balance shall be paid by both parties through negotiation.

Fourth, the engineering quality standards

1, which conforms to the relevant national standards and the drawing requirements of the work content agreed in this contract.

2, combined with the actual project to decide whether to agree with the quality objectives of this project as excellent. The index is _ _ _ _ _% of the completion acceptance rate, and the excellent rate is above _ _ _%, and the project acceptance has been successful for _ _ _ times.

Verb (abbreviation for verb) The responsibilities and obligations of both parties.

Responsibilities and obligations of Party A:

1. Cooperate with Party B to handle relevant work procedures within the scope of this agreement.

2, responsible for engineering technical disclosure, organization, the blue prints.the design unified arrangement of technical archives collection and submission.

3. Pay the project cost to Party B according to the contract.

4. Be responsible for cooperating with Party B to coordinate relevant working relations on site.

5. Supervise and manage the construction period and quality of the project.

Responsibilities and obligations of Party B:

1, do a good job in the exploration and protection of underground pipelines and adjacent buildings and structures on the construction site. Obey the safety management of the construction site by Party A and the supervision unit. If the underground pipelines and adjacent buildings are damaged due to Party B's reasons, Party B shall be responsible for repairing, compensating and taking corresponding responsibilities.

2. Ensure that the construction site is clean and civilized.

3. Before organizing the construction, Party B shall provide Party A with the construction plan and progress, which can be implemented only after being approved by Party A. ..

4. This project is constructed according to the acceptance standard of electrical equipment of State Power Company. Party B shall be responsible for the rework caused by construction quality problems, and the expenses shall be borne by Party B. ..

5, responsible for engineering safety management, site construction personnel shall not smoke.

Social insurance of intransitive verbs

Through negotiation between Party A and Party B, Party A shall handle accident insurance for Party B in accordance with national and local regulations on social insurance, and both parties shall pay accident insurance premium in full and on time at the rate specified in the overall planning area.

Seven. responsibility for breach of contract

Party A's liability for breach of contract:

1. Party B shall receive economic compensation for the losses caused by project stoppage, delay, rework, demolition and rework due to Party A's reasons.

2. Party B violates this contract and fails to pay labor remuneration to Party B on time.

3. Other agreed non-performance or non-performance of the contract.

4. If Party B fails to verify the engineering quantity completed by Party B as agreed or fails to pay the labor remuneration or the final payment of labor remuneration as agreed, it shall pay Party B the interest on overdue labor remuneration according to the loan interest rate of Party B to the bank for the same period, and pay Party B the liquidated damages according to the overdue amount.

5. If Party B fails to perform other obligations under this contract or fails to perform as agreed, it shall pay liquidated damages to Party B, compensate the losses caused to Party B due to its breach of contract, and postpone the delayed working hours of Party B. ..

6. Party A appoints Comrade _ _ _ _ _ _ _ to be responsible for the relevant management and coordination on site.

Party B's liability for breach of contract:

1, the completion of the project was delayed due to its own reasons.

2, because the construction quality does not meet the quality standards agreed in this contract.

3. Party B shall be responsible for compensating the economic losses caused by the unqualified project quality or disputes with other parties due to the failure to carry out the construction according to the drawings, specifications and work instructions of this project.

4. After obtaining the project, Party B shall not subcontract or subcontract the project. If the project is subcontracted or subcontracted, Party A has the right to terminate the contract immediately and order it to leave, and Party B shall compensate Party A for all losses caused thereby.

5. Due to Party B's reasons, the quality, safety, progress, environmental protection and civilized construction of this project failed to reach the targets and indicators specified in this agreement. During the construction process, Party B's personnel do not obey the management of Party A's personnel, and do not comply with the requirements of Party A's personnel in terms of dress, project department placement, external liaison, on-site safety fence, civilized construction signs, etc. At the time of settlement, Party A shall punish Party B according to _ _ _% of the settlement fees of both parties.

6. If Party B fails to resume the work on the construction site on time or fails to resume the work on the construction site, resulting in other damages or accidents, Party B shall bear the responsibilities; Although the on-site repair work was carried out, due to other factors or accidents, Party B failed to produce and save the on-site image data as required, and could not clearly explain the situation involved, and the consequences shall be borne by Party B..

7. When Party B fails to perform other obligations or agreements in this contract, Party B shall still compensate Party A for the economic losses caused by its breach of contract, and the delayed working hours of Party B shall not be postponed.

8. Party B appoints Comrade _ _ _ _ _ _ _ to be responsible for the relevant management, coordination and cooperation on site.

Eight. Dispute resolution method

Both parties agree to bring a lawsuit to the people's court in case of any dispute arising from the performance of this contract.

Nine. supplementary terms

1. This contract shall come into effect after being signed and sealed by both parties. This agreement shall come into force as of the date of signature by both parties, and shall automatically become invalid after the project is completed and accepted and all the terms of the agreement are fulfilled.

2. During the execution of this agreement, the construction period delay or other accidents caused by force majeure shall be handled according to the general terms and conditions related to the contents of this agreement.

3. This Agreement is made in duplicate, with each party holding one copy.

4. Matters not covered in this Agreement shall be settled by both parties through consultation.

Party A: (signature) _ _ _ _ _ _ _ _ _ _ Party B: (signature) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B.

Legal Agent: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Address: _ _ _ _ _ _ _ _ _ _ _ _ Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Fax: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Date: _ _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model labor contract for electric power engineering (III) Party A: (hereinafter referred to as Party A) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: (hereinafter referred to as Party B) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Due to the shortage of Party A's own labor force in the project construction, Party B needs to be hired to provide labor support and services. According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, Party A and Party B agree to sign this Agreement through equal consultation.

First, the nature of labor cooperation

Short-term temporary employment

Second, the use of labor cooperation

Limited to power engineering construction.

Three. workplace

_ _ _ _ _ _ _ _ _ _ _ _ _ _ (the work area designated by Party A).

Fourth, the work content

Auxiliary work such as earthwork excavation, substation installation, distribution line erection, material transfer and labor cooperation.

Verb (abbreviation for verb) The validity period of the agreement.

1. This agreement is valid for _ _ _ days and takes effect on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. The validity of this Agreement may be extended accordingly in the following circumstances:

A. The construction period is postponed due to Party A's reasons;

B. the construction period is delayed due to force majeure;

On-site representation of intransitive verbs

1. The on-site representative appointed by Party A is _ _ _ _ (post) of the power supply station.

2. The field representative appointed by Party B is (name) _ _ _ _ _ _ _, and the ID number is _ _ _ _ _ _.

Seven. Rights and obligations of Party A

1. For those who violate Party A's management system and discipline or disobey Party A's work arrangement, Party A has the right to leave the work site in time and suspend their labor cooperation relationship.

2. Party A is responsible for power failure, safety supervision and coordination at the work site.

3. Submit relevant drawings and documents to Party B in a timely manner, and make necessary disclosure before commencement.

4. Visa and accept the completion of Party B's work.

5. Pay the contract price to Party B at the time agreed in this contract.

Eight. Rights and obligations of Party B

1. Party B must purchase personal accident insurance for all personnel participating in labor cooperation.

2. Party B's climbing workers and skilled workers must have corresponding qualification certificates and work experience.

3. Before entering the work site, Party B shall investigate the work site and get familiar with the environment and site.

4. Party B shall strengthen the safety education of field personnel, take safety measures in strict accordance with the Electric Power Safety Work Regulations, correctly wear and use safety instruments and labor protection articles, do a good job in safety protection, and make inspection records.

5. Work in strict accordance with the design drawings, building installation specifications and technical disclosure requirements to ensure work efficiency and quality.

6. Party B shall carry out the construction in a safe and civilized manner, and shall not cause personal and property losses to Party A and the third party.

Nine, safety responsibility

1. If a safety accident occurs during working hours due to Party B's reasons, Party B shall bear all economic losses and handle the accident according to relevant state regulations.

2. During the validity of the agreement, Party B shall be fully responsible for all safety accidents of Party B's personnel in the non-working area.

X. Project quality acceptance and warranty period

1. Basis for project quality acceptance: design drawings and national acceptance specifications.

2. Before applying to Party A for project acceptance, Party B shall provide complete data and documents according to Party A's requirements. ..

3. Warranty period: calculated from the date of acceptance, the warranty period is _ _ _ _ years.

XI。 Contract amount and payment method

1. Agreement price: _ _ _ _ _ _ _ _ Yuan only (¥).

2. After Party B completes the agreed work content and is accepted by Party A, Party A shall pay _ _ _ _ _% of the agreement price in one lump sum, and the rest shall be paid when the warranty period expires.

Twelve. Dispute resolution method

Disputes arising from the performance of this agreement shall be settled by both parties through consultation. If negotiation fails, both parties agree to bring a lawsuit to the people's court.

Thirteen. others

This Agreement was signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A (official seal): _ _ _ _ _ _ _ _ _ _ Party B (official seal): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _ Legal representative (signature): _ _ _ _ _ _

Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _