According to the agreement reached by MasterCard, venue owner Huaxi International Investment Group Co., Ltd. and AEG, the world's leading sports and entertainment promotion company headquartered in the United States, Wukesong Stadium with 65,438+08,000 seats will be renamed "MasterCard Center" with a naming right of five years. As important strategic partners of the owner Huaxi International Investment Group Co., Ltd., NBA and AEG will continue to cooperate with the owner's venue operating company to provide comprehensive consulting and support services for the management and sponsorship of MasterCard Center.
The title of this Olympic Stadium marks another milestone in China's rapidly developing sports and entertainment industry: it is the first 2008 Olympic Stadium with a commercial title and the first one in Beijing. Here, China's local ownership and practical experience, international competition management expertise and international sponsors are combined for the first time, * * * presenting the best entertainment experience for Beijing. Wukesong Cultural and Sports Center is located at the intersection of Fuxing Road and West Fourth Ring Road, the extension line of Chang 'an Avenue in Beijing, adjacent to Wukesong Station of the first-line subway. Located at the intersection of Haidian, Fengtai and Shijingshan, Wukesong Cultural and Sports Center is the core of the "Western Ecological Belt" and "Sports Cultural Zone" in Beijing's planning, which is consistent with the development concept of "two axes, two belts and multiple centers" in Beijing.
* * * The periphery of the sports center involves 10 urban expressway and primary and secondary trunk roads. From west to east: Yongding Road, West Fourth Ring Road, Cuixi Road, Dongcui Road and West Third Ring Road; From north to south: Fushi Road, Jingou Road, Yuyuantan South Street, Wanshou Road West Street and Fuxing Road. The transportation is extremely convenient. Wukesong Gymnasium, as the basketball preliminaries of the 2008 Beijing Olympic Games, has a construction area of 63,429 square meters, an underground area of about 10000 square meters, and its structure is lower than the ground 10 meter. The first and second floors above the ground are competition floors and mezzanine floors, which have complex structures, large quantities of work and great height changes. Although the elevation of the two floors is10m, there are both viaducts with a height of10m and small mezzanines with a height of only1.2m.. Local 1 layer or even 3-layer design is very common. Beijing Urban Construction Company II, as a participant, overcame difficulties, concentrated superior forces, conducted scientific command, and conducted on-site checks, and launched the labor competition of "carrying forward the Olympic spirit and contributing to excellent projects", successfully completed the construction task of the sixth floor of the concrete structure of Wukesong Gymnasium, and successfully passed the preliminary inspection of the Great Wall Cup of Beijing Structure. The error of reinforced concrete structure and processing is less than 3mm. Civilized construction was rated as a civilized model construction site in Beijing. Wukesong Gymnasium has six floors above the ground, and the existing reinforced concrete frame-shear wall-steel supporting structure will be adopted for the completed concrete structure above the second floor. The roof will be a bidirectional orthogonal spatial steel truss with an area of 14400 square meters and a square side length of 120 meters. When completed, the museum can accommodate18,000 Olympic visitors.