Safety standard analysis of mold handling and maintenance?

First, the mold processing

(1) Forklift handling should follow the forklift safety operation procedures;

(2) Crane hoisting shall comply with crane safety operation procedures;

(3) The bearing capacity of the tooling car should be considered when loading the car for manual work. Place the mold smoothly and gently, and pay attention to the surrounding conditions and road conditions to prevent the mold from slipping and hurting people due to vehicle vibration. Some molds should be equipped with special mold bases for overall handling.

(4) Manual handling shall ensure the stability of the mold and sufficient manpower. Feel reliable.

(5) Forklift trucks, tooling trucks and other vehicles are not allowed to pile up and be over-high when transporting large molds to prevent people from slipping.

Two. die setting

Before installation, check whether the mold is in good condition and whether the connecting bolts are fastened reliably. Confirm before installation:

(1) is installed on an oil press.

(1) Before installation, check whether the equipment is in good condition and whether the safety devices are complete and reliable.

(2) Confirm that the equipment is in good condition, support the top wood, and ensure the stability and reliability of the top wood. (The top wood should be fastened to the column of the hydraulic press).

(3) When two or more people * * * install molds at the same time, one person shall be appointed to direct and coordinate the actions. Personnel should stand in a safe place to avoid accidents.

(4) The mold should be fixed evenly and reliably.

(2) Install on the vertical punching machine:

(1) Before installation, stop the machine, cut off the main power supply, and check whether the mechanical devices of the equipment are in good condition.

(2) Under the condition that the equipment is in good condition, manually adjust the height of the slider and install the mold. When two or more people operate, one person shall be designated to command and coordinate.

(3) the mold should be fixed evenly and reliably.

(3) Installation on other equipment:

No matter how to install the mold on the high-speed automatic punch, side plate forming machine or straightening shear, two or more people should work at the same time when stopping, and a special person should be appointed to take charge of the command and coordination.

3. Die debugging

Be sure to proceed slowly and carefully observe the process of mold action. If problems are found, stop the machine immediately and make adjustments.

Four. Mold maintenance

The maintenance of in-use molds must be carried out under the shutdown state. If there is a major fault, it can be disassembled and repaired in the maintenance workshop.

Verb (abbreviation for verb) Dismantle the mold.

(1) Before ripping, the upper and lower dies should be closed and fastened if necessary.

(2) Stop the power supply first, and then loosen the bolt.

(3) When starting the machine (oil press) to unload the upper die, the top wood must be added.

(4) Others can be installed and transported as required.

Note: (1) Tools used for mold loading, unloading and adjustment shall be carried out according to the safe operation requirements of relevant tools.

(2) The climbing and standing parts of personnel shall be safe and reliable.

I believe that after the above introduction, everyone has a certain understanding of the safe operation procedures for mold handling and maintenance. Welcome to Zhong Da for more information.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd