The Heilongjiang section of Beijing-Harbin Expressway adopts half-width two-way traffic guarantee time from 0: 00 on June 10 to 24: 00 on June 10 and 3 10. The reconstruction and expansion project of Jingha Expressway was completed under the repeated demonstration and supervision of the Research Institute of the Ministry of Communications. In order to ensure the safety of life and property of traffic participants under abnormal road conditions, the speed limit standard of 60 km/h is formulated.
After two-way traffic, some newly-built pavements and unfinished pavements are "diverted", "narrowed" and "height difference", especially reminding drivers to pay attention to traffic warning signs, control the speed and drive carefully.
Extended data:
From June 65438+1October 65438+0: 00 in June 2020, the direction of Jingha Expressway from Changchun to Harbin was officially opened. At that time, a four-lane two-way guarantee mode will be adopted, with a speed limit of 60 km/h, and vehicles with dangerous chemicals and exceeding the limit and exceeding the length will be prohibited. Two-way vehicles will use the newly-built half-width four-lane traffic.
Because this expressway reconstruction and expansion project belongs to the "four-lane to eight-lane" project, the construction nature is special, the construction organization and traffic organization are different from conventional projects, and the opening conditions of some interchange areas are limited by demolition and reconstruction factors. In order to ensure the smooth and safe progress of related projects, the toll stations and service areas along the line do not have the opening conditions. Drivers who need refueling, parking and rest, vehicle maintenance and other related services. We must pay attention to reasonable planning and early arrangement.
References:
People's Network-Jingha Expressway Changchun-Harbin direction will be opened at 0: 00 on June/KLOC-0.