According to the basic goal of building energy-saving development in China: starting from 1986, the energy consumption of new heating residential buildings will be generally reduced by 30% on the basis of the local overall design level19865438, which is the first stage; Starting from 1996, 30% of energy is saved on the basis of meeting the requirements of the first stage, that is, 50% of the total energy is saved as the second stage; Since 2005, the third stage is to save energy by 30% on the basis of meeting the requirements of the second stage (that is, the total energy saving is 65%).
According to reports, these measures include: vigorously developing green buildings, promoting the construction of national-level green ecological urban areas, continuing to carry out provincial-level green ecological urban areas and community assessments, promoting the rapid development of green buildings, conscientiously implementing the green development concept of "energy-saving, water-saving, land-saving, material-saving and environmental protection", and reporting and accountability to backward areas. Steadily promote the development of prefabricated buildings, realize the transformation and upgrading of building methods, form a market mechanism and environment suitable for the development of prefabricated buildings, establish perfect laws, regulations, technical standards and supervision systems, and cultivate demonstration industrial bases and demonstration projects for prefabricated buildings.
In the future construction industry of Guizhou Province, we must speed up the development of new wall materials to adapt to new buildings. Support new wall material production enterprises to implement energy-saving and emission-reduction technological transformation, further improve the comprehensive utilization level of new wall material industrial resources, accelerate the elimination of backward products, technologies and equipment, and develop new wall material products suitable for new buildings.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd