It starts from Gong Hu Wetland Park Station in the south and ends at Shixin Station in the north. The total length of the line is 32.5km, and it is laid underground. * * * There are 23 stations with an average distance of 1.450m, which mainly pass through Wuhu Avenue, Hubin Road, Xueqian West Road, Chongning Road, Yongle East Road, Xueqian East Road, Youyi Middle Road and Dongting Road. Gong Hu Wetland Park parking lot is set at the southern end of the line, and Dongbeitang depot is set at the northern end.
Wuxi subway construction;
1.In 2002, the Wuxi municipal government put forward the idea of building a subway.
2. In May 2004, Japan Central Reconstruction Engineering Consulting Co., Ltd. compiled the Planning and Design of Wuxi Rail Transit Network (Final Report).
3. In 2005, China Railway Fourth Bureau compiled the Report on Deepening Planning of Wuxi Rail Transit Network. Later, Wuxi Planning Bureau integrated the above two reports into the planning of Wuxi rapid rail transit network.
In June, 2006, Wuxi municipal government officially approved the construction of subway. In June 5438+ 10 of the same year, Jiangsu Provincial Development and Reform Commission organized an expert group to pre-evaluate the urban rapid rail transit construction planning in Wuxi. At the end of February of the same year, the report was officially submitted to the National Development and Reform Commission. Since then, Wuxi has further completed the examination and approval procedures such as environmental assessment of network planning, pre-examination of land use, geological disaster assessment and seismic safety assessment.
5. In March, 2007, the plan was jointly approved by Wuxi Construction Department and Provincial Construction Department.
6. In April 2008, the State Council approved the start of the second batch of urban rapid rail transit system construction planning approval, and Wuxi was included in the approval list.
7. In September 2008, the recent construction plan of Wuxi urban rapid rail transit was formally submitted to the State Council for approval.
8. In June, 2008, 165438+ 10, with the approval of the State Council, the National Development and Reform Commission officially approved the recent construction plan of urban rapid rail transit in Wuxi, and Wuxi Metro was officially approved by the state.
Reference to the above content: Baidu Encyclopedia-Wuxi Metro Line 6
Reference to the above content: Baidu Encyclopedia-Wuxi Metro