Electric street lamp construction contract

In the society where people pay more and more attention to contracts, contracts appear more and more in our lives, which is also the link to realize professional cooperation. So what is a formal contract? The following is a template of electric street lamp construction contract (generally 5 copies) that I have compiled for you. Welcome to share.

Electric Street Lamp 1 Construction Contract Party A:

Party B:

According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, Party A and Party B reached an agreement on the construction and installation of street lamps in XXX Industrial Park on the principles of equality, voluntariness, fairness and honesty, and signed this contract.

I. Overview of the Project

Project name: street lamp installation in XXX industrial park

Project location: XXX industrial park

Project content: installation and construction of street lamps in the factory.

Source of funds: self-raised funds

Two. working range

Contents required in the layout of factory street lamps.

Three. construction period

Commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Four. quality standard

According to the national construction engineering quality acceptance standards and Party A's requirements, it passed the one-time acceptance.

Verb (abbreviation for verb) contract payment and payment

The total contract price is: 86,900.00 yuan, in words: XXX yuan only.

Payment method: After passing the acceptance, deduct the quality deposit, which is 5% of the total contract price, that is, 4,345 yuan, in words: 43,450 yuan only.

Warranty period of intransitive verbs

After the acceptance, the warranty period of Party B is _ _ _ _ _ _ _ _.

Seven. responsibility for breach of contract

If the project quality fails to meet the one-time acceptance requirements due to Party B's reasons, Party B shall be responsible for rectification until it is qualified. If the construction period is delayed, Party A shall be fined RMB 3,000.00 per day.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Electric Street Lamp Construction Contract 2: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

In order to speed up the construction of new countryside, provide rural flavor and facilitate villagers' life, Party A decided to install lighting projects in the village after discussion by the two village committees. In order to ensure the quality of the project, recommended by the power supply department, the two village committees agree that Party B shall undertake the installation and construction of the project, and both parties reach an agreement through consultation, and hereby sign this contract:

1. Project Name: Songyang County Poverty Alleviation Project Zhunao Village Street Lamp Project in Xinxing Town. Construction site: Zhunao Village

Second, the way of contracting: contracting for work and materials, taking responsibility for its own profits and losses and risks.

Three. The project cost shall be settled according to the actual engineering quantity of Party B. The unit price refers to the relevant quota and Lishui market information price.

4. Project payment: the project payment shall be paid within 15 days after the project is completed.

5. Engineering quality requirements: The materials shall be purchased by the distribution unit designated by Gushi Power Supply Bureau, and the installation standard shall be subject to the acceptance of the power supply department.

The construction period of intransitive verbs is xx years, the commencement time is xx years x months x days, and the completion time is xx years x months x days. If the project cannot be completed on time due to special reasons such as weather during the construction period, the construction period may be postponed accordingly.

Seven. Construction safety responsibility: Party B shall take safety construction protection measures during construction to prevent safety accidents. All * * * accidents in the construction shall be borne by Party B, and the expenses shall be paid by Party B. ..

Eight. Project acceptance: After the project is completed, Party B shall notify Party A to organize relevant personnel to carry out the project acceptance, and Party A shall carry out the project acceptance within 7 days. Party B's unqualified acceptance shall be reworked unconditionally.

Nine. For other matters not covered, both parties may negotiate separately and sign a supplementary agreement.

X. Liability for breach of contract: If Party A breaches the contract and fails to pay the project payment on schedule, it shall pay a late fee of 2% of the overdue payment date. If Party B breaches the contract and fails to complete the project on time, it shall pay Party A the liquidated damages 200 yuan on a daily basis according to the overdue date.

XI。 This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Power Street Lamp Construction Contract 3 Demander (Party A):

Supplier (Party B):

In accordance with the Contract Law of People's Republic of China (PRC) and relevant national regulations, combined with the specific conditions of this project, the Contract is signed by both parties through full consultation.

I. Projects

1, project name:

2. Delivery and installation location:

Second, the total project cost

1. The total cost including tax of this street lamp project is RMB:

2. The whole street lamp project must meet the functional requirements of the design scheme approved by Party A, and the design and construction scheme approved by Party A shall prevail. On this basis, the price will not be adjusted (except for the items required by Party A).

Third, payment

1. Within _3_ days from the date of signing the contract, Party A will arrange 30% of the total project cost as the production advance payment.

2. Party A shall pay 85% of the total project payment within _3_ days after the goods arrive at the construction site;

3. After all the projects are completed and accepted by Party A and relevant departments, 95% of the total project cost shall be paid.

4. Set aside 5% quality deposit, and pay the project quality deposit within 5 days after the expiration of one year.

Four. Supply and installation:

1. The installation and construction date of this street lamp project will be completed within working days in total.

2. This street lamp project must be constructed in strict accordance with the relevant national building installation specifications.

3. During the installation process, if the installation mode is changed or the construction period is delayed due to force majeure, Party A's responsibility, design change or other reasons, Party A and Party B can solve it through negotiation.

Verb (abbreviation for verb) safety responsibility

Party B must manage the construction quality and safety in strict accordance with the construction safety standards. All construction quality and safety accidents during the construction period shall be borne by Party B, and Party A shall not bear any legal responsibilities.

VI. Maintenance

The warranty period of this street lamp project is one year, counting from the date when the project is completed and accepted by Party A and relevant departments. During the warranty period, if the street lamp is found to be faulty, Party B must send someone to repair it within 24 hours from the date of receiving Party A's notice. If the damage is not caused by Party A, Party B shall be exempted from all expenses;

Seven. responsibility for breach of contract

Party A and Party B should solve the problem through consultation.

Eight. This contract is made in duplicate, one for each party. This contract shall come into effect as of the date of signature by both parties.

Employer (official seal): Contractor (official seal):

Domicile: domicile:

Legal representative:

Authorized legal representative: authorized legal representative:

Tel: Tel:

Fax: Fax:

Date: Date:

Power Street Lamp Construction Contract 4 Party A:

Party B:

Id number?

According to the Contract Law of People's Republic of China (PRC) and other relevant regulations, the Contract is signed by both parties through full consultation:

I. Projects

1, project name: street lamp installation project in central village of Liuji Town.

2. Project location: in the central village of Liuji Town.

3. Project content: The street lamp installation project will be built as required. See the attachment for construction and installation requirements.

Second, the project cycle

20xx165438+1October 10, completed in 30 sunny days.

Third, the way of contracting.

contract for labour and materials

Fourth, the project contract price and payment method

The contract price of this project is calculated at one thousand eight hundred and fifty yuan (¥ 65,438+0,850.00) per street lamp, and it is responsible for ensuring the lighting is in place. This paragraph includes the construction cost of distribution box and wires. Upon completion of the project, the Employer will pay 50% before 20x65438+February 30th, and 50% before 20x65438+February 30th.

Five, construction and installation requirements

1. Party B must carry out the construction according to the relevant requirements of the state and administrative departments. See the construction and installation requirements of the central village for details.

2. During the project construction, Party A has the right to carry out inspection. Concealed works must be inspected and accepted by Party A's representative or the supervision unit hired by Party A before the next working procedure can be started.

3. Raw materials (finished products, semi-finished products, etc. ) Party B must use qualified products from regular manufacturers and have a product certificate.

4. During installation, the main pole of the light pole should be vertical to the ground, the base should be firmly fixed, the cable joint should be hot-tied, and the insulation is good. All technical indicators meet the requirements of the relevant regulations of the state and management departments.

The distance between lamp poles is 40 meters. If there is any change, it shall be implemented according to the distance standard specified by Party A..

Six, the completion acceptance and repair

1. Party B shall notify Party A of the acceptance date in writing five days before the completion of the project. If Party A fails to accept the project on time, it shall notify Party B in advance and set a new acceptance date, but Party A shall acknowledge the completion date.

2. Party B shall hand over the project to Party A within 5 days from the date of acceptance of the project. Before Party A takes over the project, Party B shall still be responsible for keeping the project.

3. During the acceptance of the project, if the quality of the project is found to be unqualified, Party B shall be responsible for repairing or reworking it, and hand it over after passing the acceptance. If the delivery of the project is delayed as a result, Party B shall bear the liability for breach of contract due to the delay of the construction period.

4. The completion acceptance is based on the relevant provisions of the state and administrative departments. Upon completion acceptance, Party B shall provide the following documents to Party A within 5 days before acceptance:

(1), concealed engineering acceptance records and intermediate completion acceptance records;

(2) Other documents that need to be submitted to Party A for reference.

5. After the project is completed, Party B shall also undertake the maintenance responsibility within two years from the date of acceptance and formal delivery. Party A doesn't pay any extra fees, and the maintenance fee is included in the general contract. After the expiration of the warranty period, Party B shall carry out the warranty according to the relevant national regulations.

Seven, Party B must pay the contract deposit of twenty thousand yuan when signing the contract, and return it after the project is completed.

Eight. Other agreements

1. Party B must carry out the construction strictly and safely, and any safety responsibility during the construction shall be borne by Party B, which has nothing to do with Party A. ..

2. Party B shall not subcontract or subcontract the project.

3. Party A shall be responsible for paying taxes and fees for this project.

4. If there is any contradiction during Party B's construction, Party A shall actively coordinate.

5. If either party breaches the contract, it shall bear the penalty of RMB 20,000 only.

This contract shall come into effect after being signed and sealed by both parties.

This contract is made in triplicate, one for each party and one for the witness.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Electric street lamp construction contract 5 Party A:

Party B:

Party B hereby undertakes the "installation and construction" of Party A's street lamp installation project of Tongxin Road and Hexie Road in Huishui County, Guizhou Province, and * * * agrees as follows:

1, construction content

The construction length is about 3.2KM, and Party B undertakes excavation, foundation cage supply, foundation pouring, trenching, pipeline laying, cable supply, cable laying, protection, installation, debugging and correction of light poles, lamps and light sources.

2. Installation instructions

The length of Tongxin Road is about 1.47km, and the distance between street lamps is 30m. Install HXZX023 high school language lamp, numbered 5 1 on one side and 52/on the other. The two lamps are connected by cables, which are laid through pipes. The length of Harmony Road is about 1.78km, and the distance between street lamps is 30m. HXZX0 13 is equipped with 60 Chinese lamps on one side, namely 120 lamps on both sides. The two lamps are connected by cables, which are laid through pipes.

3. See the price list for related quantities and expenses:

4, the installation period

Under the condition that Party A's infrastructure and transformer are provided in time, at least 30 street lamps shall be installed and lit within 0/2 days of Tongxin Road/KLOC-; Before June 8, at least 30 street lamps on Harmony Road have been installed and turned on. However, during the installation period, if the construction period is delayed due to irresistible factors such as typhoon, flood, earthquake and other natural reasons, both parties shall negotiate to solve it.

5, quality standards and acceptance criteria

All engineering quality standards must be excellent (if the engineering quality does not meet the standards, Party B shall be responsible for rework losses).

The acceptance shall be conducted in accordance with the relevant national regulations, the quality requirements, technical indicators and commitments of Party A's design documents and the standards agreed in this contract.

6. Terms of payment

After the signing of the agreement, Party A shall pay the contract money in advance to Party B; When more than 50% street lamps are installed and lit, 45% of the contract price shall be paid; When more than 75% of the street lamps are installed and turned on, 70% of the contract price shall be paid; Pay 97% of the final settlement of Party B after the installation and debugging of street lamps are qualified, and the remaining 3% will be used as quality guarantee. The warranty period is one year. If there is no quality problem in the project within one year, Party A will return it to Party B without interest. Party A shall provide the corresponding receipt after receiving the payment every time.

7. Others

Before the street lamps are delivered to Party A for use, Party B shall be responsible for the storage of important materials such as street lamps and cables. Construction personnel are composed of factory technicians and migrant workers.

8. This Agreement is made in triplicate, with Party A holding two copies and Party B holding one copy. It will take effect after both parties sign and pay the advance payment.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _